監(jiān)理工程質(zhì)量保證措施范文

時(shí)間:2023-08-25 17:23:51

導(dǎo)語(yǔ):如何才能寫好一篇監(jiān)理工程質(zhì)量保證措施,這就需要搜集整理更多的資料和文獻(xiàn),歡迎閱讀由公務(wù)員之家整理的十篇范文,供你借鑒。

監(jiān)理工程質(zhì)量保證措施

篇1

關(guān)鍵詞:水利施工,軟基處理, 工程施工

Abstract: our land area is known for her massive land, each region between geological environment there is a big difference, so in water conservancy project construction process usually exist of soft soil foundation. Because of the soft soil foundation bearing capacity is weak, if not for the corresponding processing, then, under the pressure of buildings in the upper often in deformation, leading to the upper water conservancy project appear irregular settlement, causing the water conservancy project crack accident is even. So in water conservancy project construction process should be well of soft ground treatment work, so as to ensure the quality and safety of water conservancy project.

Keywords: water conservancy construction, soft foundation treatment, engineering construction

中圖分類號(hào):TV 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):

如果對(duì)公路工程建設(shè)中出現(xiàn)的軟土地基不進(jìn)行有效地處治,就會(huì)導(dǎo)致路基不均勻沉陷,路面開(kāi)裂等病害的發(fā)生,對(duì)道路的穩(wěn)定性、安全性影響較大,同時(shí)還會(huì)增加公路的養(yǎng)護(hù)成本。本文結(jié)合某工程軟基處理的施工方法,論述了水泥攪拌樁、土工格柵、預(yù)應(yīng)力管樁在軟基處理中的質(zhì)量控制措施。

一 軟土地基的物理特性

1.1物理性質(zhì)

軟粘土多呈深灰、暗綠色,有臭味,含有機(jī)質(zhì),含水量較高、一般大于40%,而淤泥也有大于80%的情況??紫侗纫话銥?.0-2.0,其中孔隙比為1.0~1.5稱為淤泥質(zhì)粘土,孔隙比大于1.5時(shí)稱為淤泥。由于其高粘粒含量、高含水量、大孔隙比,因而其力學(xué)性質(zhì)也就呈現(xiàn)與之對(duì)應(yīng)的特點(diǎn)---低強(qiáng)度、高壓縮性、低滲透性、高靈敏度。

1.2力學(xué)性質(zhì)

軟粘土的強(qiáng)度極低,不排水強(qiáng)度通常僅為5~30kPa,表現(xiàn)為承載力基本值很低,一般不超過(guò)70kPa,有的甚至只有20kPa。軟粘土尤其是淤泥靈敏度較高,這也是區(qū)別于一般粘土的重要指標(biāo)。

1.3工程特性

軟粘土地基承載力低,強(qiáng)度增長(zhǎng)緩慢;加荷后易變形且不均勻;變形速率大且穩(wěn)定時(shí)間長(zhǎng);具有滲透性小、觸變性及流變性大的特點(diǎn)。常用的地基處理方法有預(yù)壓法、置換法、攪拌法等。

二. 軟基處理工程

2.1 水泥攪拌樁

2.1.1 加固原理。水泥攪拌樁是一種應(yīng)用較廣泛的地基加固方法,根據(jù)水泥水化的化學(xué)機(jī)理,利用水泥作為固化劑,通過(guò)特制的攪拌機(jī)械,在地基深處就地將軟土和固化劑(漿液和粉體)強(qiáng)制攪拌,由固化劑和軟土間所產(chǎn)生的一系列物理—化學(xué)反應(yīng),使軟土硬結(jié)成具有整體性、水穩(wěn)性和一定強(qiáng)度的水泥加固土,從而提高地基強(qiáng)度和增大變形模量。

2.1.2 施工工藝。水泥攪拌樁施工流程為:①測(cè)量定位;②樁機(jī)就位;③第一次下沉;④水泥漿制備;⑤提升注漿攪拌設(shè)計(jì)樁頂標(biāo)高;⑥第二次下沉、噴漿至設(shè)計(jì)樁頂標(biāo)高;⑦移動(dòng)樁機(jī),進(jìn)行下一根樁的施工。

施工參數(shù):①水泥摻量為15%;②水灰比0.45~0.55,木質(zhì)素?fù)搅繛樗嘀亓康?.2%;③提升速度控制在15cm/min左右。

2.2 土工格柵

2.2.1在施工前首先對(duì)材料加以嚴(yán)格檢查,對(duì)土工格柵的質(zhì)量符合圖紙或規(guī)范要求,在采用土工格柵的路堤填筑正式開(kāi)工前,結(jié)合工程先修筑試驗(yàn)路段,以指導(dǎo)施工。

2.2.2鋪設(shè)土工格柵按圖紙施工,在平整的下承層上全斷面鋪設(shè)。鋪設(shè)時(shí),不得有褶皺和破壞。土工格柵下填料在最佳含水量的條件下用壓路機(jī)分層壓實(shí)。攤鋪土工格柵,人工拉直平順,緊貼土層,不扭曲,折皺,重疊。③土工格柵在鋪設(shè)時(shí),將強(qiáng)度高的方向置于路堤軸線方向。④土工格柵拼接時(shí),在受力方向連接處的強(qiáng)度不低于材料設(shè)計(jì)抗拉強(qiáng)度。為保證土工合成材料的整體性,土工搭接長(zhǎng)度保證足夠長(zhǎng),橫向搭接長(zhǎng)度大于0.3m,縱向搭接長(zhǎng)度大于0.6m。

2.3 預(yù)應(yīng)力管樁

2.3.1 施工工藝。該段管樁采用靜力壓入法施工工藝,流程為①場(chǎng)地平整,樁機(jī)就位;②靜力壓入第一節(jié)樁;③起吊第二節(jié)樁;④電焊接樁,檢查焊接質(zhì)量和垂直度;⑤靜力壓入第二節(jié)樁;⑥重復(fù)打樁工藝,直至達(dá)到設(shè)計(jì)樁長(zhǎng);⑦移動(dòng)樁機(jī),進(jìn)行下一根樁的施工。

2.3.2 質(zhì)量控制要點(diǎn)。

1接樁。采用端板焊接法進(jìn)行接樁,焊接前,先將下節(jié)樁端板除污、除銹,清理干凈鐵件表面后,上、下樁段對(duì)齊,上下兩塊端板軸向錯(cuò)位小于2mm,節(jié)點(diǎn)彎曲矢高不得大于0.1%樁長(zhǎng)。

2截樁。沉樁到位后仍有一大截管樁外露時(shí),應(yīng)實(shí)施截樁。截樁采用專用切割機(jī),邊切割邊澆水。嚴(yán)禁在管樁沒(méi)有完全切斷時(shí)采用大錘敲斷或樁機(jī)別斷。

3“浮樁現(xiàn)象”控制。

三 .軟土地基施工注意事項(xiàng)

3.1軟基進(jìn)行處理以后,還必須經(jīng)過(guò)加載使超孔隙水壓力逐漸消散,孔隙比減小,地基產(chǎn)生固結(jié),土的密度增加,抗剪強(qiáng)度提高。以保證地基在路堤填筑過(guò)程中不發(fā)生破壞。

3.2填筑路基施工時(shí),可采取增設(shè)反壓護(hù)道的措施,即把原設(shè)計(jì)護(hù)坡抬高到路堤高度一半的位置。軟土地基抗剪強(qiáng)度差,故護(hù)道要與路基上方同步施工,使之形成整體,路基荷載可在較大范圍內(nèi)擴(kuò)散,反壓護(hù)道雖然增加了一些土方,但對(duì)工期和施工連續(xù)性、地基受力的均衡都有利。

3.3對(duì)橋頭等特殊地段采用超載預(yù)壓。橋頭地段與一般地段完工后允許沉降的控制標(biāo)準(zhǔn)不同,若采用等載預(yù)壓就無(wú)法解決這一問(wèn)題。為此,在橋頭處路基填至設(shè)計(jì)標(biāo)高后再加載1.5 m, 并在50 m 范圍內(nèi)過(guò)渡到一般地段的路基頂標(biāo)高,以形成一個(gè)超載三角形。

3.4軟土地基段修建涵洞、通道必須考慮路基加載造成的地基沉降,而這種沉降愈近中線就越大。對(duì)此,涵洞、通道處要考慮預(yù)留沉降量或先填土堆載使地基沉降到位再挖槽施工。

四施工質(zhì)量保證措施

4.1動(dòng)員全體員工認(rèn)真,嚴(yán)格搞好工程質(zhì)量,貫切"百年大計(jì)質(zhì)量第一"堅(jiān)持"質(zhì)量是企業(yè)的生命"的方針,樹(shù)立為下一道工序服務(wù),為用戶服務(wù)的思想,搞好質(zhì)量關(guān),宣傳教育工作。

4.2要認(rèn)真按圖及規(guī)范施工,以優(yōu)良工程為標(biāo)準(zhǔn)。按施工工藝操作規(guī)程,以及合同有關(guān)的質(zhì)量保證辦法,施工技術(shù)管理制度和質(zhì)量管理責(zé)任制,精心組織施工。

4.3各項(xiàng)工序施工中,現(xiàn)場(chǎng)管理施工員要認(rèn)真,嚴(yán)格把質(zhì)量的關(guān)。控制設(shè)計(jì)標(biāo)高及軸線平面位置,按圖及規(guī)范監(jiān)督每一工序的施工,對(duì)不合格的一律返工,至達(dá)到要求后,才能對(duì)下一工序進(jìn)行施工,認(rèn)真做好各項(xiàng)工序施工前的技術(shù)交底,根據(jù)不同的工作特點(diǎn)制訂具體的防范措施。

4.4圖紙施工中增減工程量,施工員必須跟蹤工作,做好各項(xiàng)增減簽證記錄和隱蔽資料,按甲方要求及時(shí)對(duì)每月報(bào)進(jìn)度工程量,收到甲方書面或口頭變更通知,應(yīng)及時(shí)與甲方代表、監(jiān)理人員會(huì)同認(rèn)可后,方能進(jìn)行施工。

結(jié)束語(yǔ):

每一種軟土路基處理方法均有其針對(duì)性、適用范圍以及局限性 ,必須根據(jù)具體條件選擇符合設(shè)計(jì)要求的軟土路基處理方法 ,才能取得理想的處治效果。對(duì)能達(dá)到處理效果的方法進(jìn)行使用階段技術(shù)可靠性、施工難易程度、工程造價(jià)、工期、對(duì)周圍環(huán)境影響等方面的綜合評(píng)比,確定最合理的軟土路基處理方案,并不在于技術(shù)的先進(jìn)與否。

參考文獻(xiàn):

[1]劉玉卓.公路工程軟基處理[M].北京:人民交通出版社,2004.

[2]張留俊,等.高速公路軟土地基處理技術(shù)[M].北京:人民交通出版社,2004.

[3]李彰明.軟土地基加固的理論、設(shè)計(jì)與施工[M].北京;中國(guó)電力出版社,2006.

篇2

關(guān)鍵詞:滑坡安全;監(jiān)理工程師;控制要點(diǎn)

Abstract: in this paper, the supervision engineer in high slope engineering control before, during and after the event, the safety and quality control are discussed in detail difficulty, and points out that the landslide treatment project construction supervision stage is the landslide treatment project quality control of the key stages.

Keywords: landslide security; Supervision engineer; Control points

中圖分類號(hào): U416.1+4文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):

0前言

監(jiān)理工程師必須要求施工單位推行全面質(zhì)量管理,建全質(zhì)量保證體系,做到開(kāi)工有措施,技術(shù)有交底,定位有復(fù)查,材料、設(shè)備有試驗(yàn),隱蔽工程有記錄,質(zhì)量有自檢、專檢,交驗(yàn)有資料。監(jiān)理工程師事先做好預(yù)控、事中旁站和抽查,事后嚴(yán)格驗(yàn)收,簽署驗(yàn)收意見(jiàn),這些常規(guī)監(jiān)理任務(wù)是監(jiān)理的基本職責(zé),以下主要以滑坡治理工程施工各階段監(jiān)理的安全質(zhì)量控制難點(diǎn)進(jìn)行探討。

1監(jiān)理進(jìn)場(chǎng)準(zhǔn)備及事前質(zhì)量控制難點(diǎn)

1.1建立健全有效的監(jiān)理機(jī)構(gòu)

監(jiān)理單位要進(jìn)行準(zhǔn)確、高效的質(zhì)量控制,必須具備一支與監(jiān)理項(xiàng)目相對(duì)應(yīng)的專業(yè)化、高素質(zhì)隊(duì)伍,在監(jiān)理項(xiàng)目中科學(xué)合理組織?,F(xiàn)場(chǎng)監(jiān)理人員應(yīng)合理安排,一般一個(gè)標(biāo)段或點(diǎn)位(獨(dú)立分開(kāi)、相距較遠(yuǎn))至少有一名現(xiàn)場(chǎng)監(jiān)理工程師,為避免交叉管理,有利于現(xiàn)場(chǎng)質(zhì)量管理從始而終,各監(jiān)理人員職責(zé)分明。

1.2收集整理準(zhǔn)確的監(jiān)理信息

(1)組建監(jiān)理部后認(rèn)真學(xué)習(xí)施工圖設(shè)計(jì)和勘察報(bào)告,同時(shí)對(duì)現(xiàn)場(chǎng)進(jìn)行踏勘,結(jié)合現(xiàn)場(chǎng)情況查找設(shè)計(jì)弊端或漏洞,與設(shè)計(jì)方取得聯(lián)系,協(xié)同施工、業(yè)主單位協(xié)商處理有關(guān)事宜。事前消除隱患與風(fēng)險(xiǎn)較難做到,但這極為重要,要力爭(zhēng)做好。監(jiān)理工程師要從滑坡安全方面預(yù)測(cè)施工中或施工后會(huì)出現(xiàn)的質(zhì)量問(wèn)題,可通過(guò)監(jiān)理通知、監(jiān)理會(huì)議傳達(dá)給施工單位,并要求在開(kāi)工申請(qǐng)報(bào)告中作出相應(yīng)可行的施工處理措施?,F(xiàn)列舉會(huì)出現(xiàn)的幾個(gè)質(zhì)量問(wèn)題:①擋墻上方有泉水且土體較松散,致使擋墻傾伏、墻基底有硬質(zhì)傾斜層狀光滑巖層且有滲水,擋墻可能順層整體坐滑;②護(hù)坡內(nèi)有局部陡坡、較厚棄土、散狀出露泉水使砌體拉裂變形;③排水溝現(xiàn)場(chǎng)存在不利集水、排水地形,水溝完成后起不到排水作用;④抗滑樁錨固段為軟質(zhì)巖石,影響后背抗力,松散滑體中的抗滑樁孔開(kāi)挖孔內(nèi)坍塌致使樁身與土體(滑體)有間距;⑤對(duì)施工可能產(chǎn)生的擾動(dòng)影響滑坡的穩(wěn)定性(如削方、爆破、深基坑開(kāi)挖),施工前要求預(yù)加安全儲(chǔ)備,提出可行搶險(xiǎn)預(yù)案,根據(jù)滑坡變形特點(diǎn),監(jiān)理可事先控制撓動(dòng)工程的施工方式,嚴(yán)格審查施工組織設(shè)計(jì);⑥對(duì)各分部分項(xiàng)工程實(shí)施先后不同,影響工程質(zhì)量或滑坡安全的情況,予以預(yù)測(cè)分析,并要求施工方在施工組織設(shè)計(jì)中作合理安排。

(2)將施工設(shè)計(jì)圖中各項(xiàng)設(shè)計(jì)參數(shù)(如抗滑樁鋼筋配筋)、設(shè)計(jì)量、設(shè)計(jì)技術(shù)要點(diǎn)整理成小冊(cè)以便隨身攜帶,工地上可隨時(shí)、全面、準(zhǔn)確檢核施工質(zhì)量。

(3)開(kāi)工前,監(jiān)理單位請(qǐng)具相應(yīng)施工資質(zhì)專業(yè)人員針對(duì)所監(jiān)理項(xiàng)目的施工工藝及方法、施工難點(diǎn)進(jìn)行培訓(xùn)講解,使監(jiān)理工程師在即將進(jìn)行的監(jiān)理工作中知已知彼,確保質(zhì)量控制成功,這點(diǎn)監(jiān)理單位易忽視。

(4)監(jiān)理人員進(jìn)場(chǎng)后針對(duì)工程特點(diǎn),規(guī)范各類施工及監(jiān)理表格,準(zhǔn)確劃分分部分項(xiàng)工程,以便快速上報(bào)、審批、開(kāi)工,促進(jìn)施工自檢質(zhì)量、進(jìn)度,有充足施工時(shí)間也是施工質(zhì)量保證的條件之一。

1.3做好監(jiān)理質(zhì)量控制成功的心理準(zhǔn)備

(1)監(jiān)理工程師是建設(shè)工程的指揮長(zhǎng)兼總工程師,有權(quán)審核工程施工和設(shè)計(jì)變更,對(duì)工程的實(shí)施負(fù)全責(zé),有的現(xiàn)場(chǎng)監(jiān)理總以為監(jiān)理只是對(duì)施工進(jìn)行被動(dòng)檢查驗(yàn)收,施工技術(shù)難點(diǎn)解決不參與、不積極或全由施工方提出,最后往往施工質(zhì)量難以監(jiān)理,甚至工程出現(xiàn)重大質(zhì)量事故監(jiān)理還不知所以然。

(2)地質(zhì)災(zāi)害治理工程終身負(fù)責(zé),監(jiān)理對(duì)監(jiān)理單位負(fù)責(zé)、對(duì)國(guó)家負(fù)責(zé),對(duì)自已終身負(fù)責(zé)。

(3)監(jiān)理工作具有服務(wù)性,參與滑坡治理工程的五方(勘察、設(shè)計(jì)、業(yè)主、監(jiān)理、施工)是平等合作關(guān)系,在嚴(yán)格監(jiān)理的同時(shí)要有盡量為五方單位作些有利工程質(zhì)量的服務(wù)性工作,盡量避免造成施工方與監(jiān)理方的對(duì)抗、敵視,以至監(jiān)理的質(zhì)量控制措施不能在施工中順利落實(shí),使施工質(zhì)量不佳。

1.4考察料場(chǎng)原材料質(zhì)量

材料質(zhì)量的好壞是高邊坡治理工程建筑體長(zhǎng)期正常運(yùn)行的關(guān)鍵,開(kāi)工前應(yīng)進(jìn)行現(xiàn)場(chǎng)督促,協(xié)助施工單位到料場(chǎng)考察,特別是對(duì)原材料的源頭質(zhì)量進(jìn)行嚴(yán)控,對(duì)運(yùn)到現(xiàn)場(chǎng)的不合格材料嚴(yán)禁入場(chǎng)。

1.5復(fù)核測(cè)量放線的正確性

監(jiān)理單位組織自已的測(cè)量專業(yè)人員對(duì)施工方現(xiàn)場(chǎng)引的控制點(diǎn)及測(cè)量放線的點(diǎn)進(jìn)行抽查,抽檢合格率應(yīng)達(dá)100%。

1.6嚴(yán)格審批施工單位的質(zhì)量保證措施,并督促盡快建立質(zhì)量保證體系

①要有明確、具體的質(zhì)量目標(biāo)及創(chuàng)優(yōu)規(guī)劃,細(xì)化到分部分項(xiàng)工程;②應(yīng)建立完善、有效的質(zhì)量保證體系;③質(zhì)量保證措施應(yīng)有管理措施、工程質(zhì)量控制程序及具體方法;④應(yīng)實(shí)行質(zhì)量責(zé)任終身制,各責(zé)任明確到人;⑤監(jiān)理對(duì)施工方提交的質(zhì)量保證措施應(yīng)現(xiàn)場(chǎng)核實(shí)質(zhì)量保證的硬件(質(zhì)量管理體系各人員、儀器、設(shè)備、試驗(yàn)器具、材料庫(kù)、質(zhì)量保證體系框)是否合格,是否落實(shí),如沒(méi)落實(shí)不予審批,不予開(kāi)工。

2事中質(zhì)量控制難點(diǎn)

施工過(guò)程中的質(zhì)量監(jiān)控需根據(jù)工程類型,按各類工程的施工工藝、工序制定跟蹤監(jiān)理程序,即按三個(gè)監(jiān)理等級(jí)實(shí)施監(jiān)控:對(duì)關(guān)鍵工藝、重點(diǎn)工程部位實(shí)施旁站監(jiān)理;各工序間,由監(jiān)理人員驗(yàn)收、檢查、簽證。不簽證,不得進(jìn)入下一道工序施工,對(duì)隱蔽工程,不經(jīng)驗(yàn)收,不準(zhǔn)掩埋或進(jìn)入下道工序施工;巡視監(jiān)控,是一般施工過(guò)程中監(jiān)理人員現(xiàn)場(chǎng)巡視、監(jiān)控。巡視過(guò)程中,監(jiān)理人員根據(jù)現(xiàn)場(chǎng)施工情況,隨機(jī)抽檢,其手段是隨機(jī)取試驗(yàn)樣,諸如制取試塊、砌體拆查、填筑密實(shí)度取樣試驗(yàn)等,對(duì)于局部可疑點(diǎn),可進(jìn)行局部破壞性檢查。

2.1采取有效的質(zhì)量控制手段

①建立質(zhì)量管理獎(jiǎng)懲制度,上報(bào)業(yè)主審批后嚴(yán)格執(zhí)行;②對(duì)于局部質(zhì)量疑點(diǎn),可進(jìn)行破壞性檢驗(yàn),如干砌石密實(shí)情況可局部翻開(kāi)干砌片石、排水溝底可局部打開(kāi)看底部漿砌石砂漿質(zhì)量及砌石厚度是否符合設(shè)計(jì)要求、抗滑樁抽芯檢驗(yàn)等;③對(duì)影響工程核心質(zhì)量的隱蔽工程施工須進(jìn)行24 h的全程旁站監(jiān)控,如抗滑樁澆注、預(yù)應(yīng)力錨索下錨具、錨桿安裝、注漿等,對(duì)偷工減(剪)料、謀取暴利嚴(yán)重影響工程質(zhì)量的,一經(jīng)發(fā)現(xiàn)嚴(yán)肅返工處理,情節(jié)嚴(yán)重的建議業(yè)主更換承包單位或向行業(yè)資質(zhì)主管部門上報(bào)。

篇3

關(guān)鍵詞:水利工程;施工階段;質(zhì)量管理

水利工程施工,是水利工程建設(shè)的重要階段,是將藍(lán)圖變成現(xiàn)實(shí)的過(guò)程。施工質(zhì)量直接關(guān)系到能否達(dá)到工程建設(shè)的目的,能否發(fā)揮理想的工程效益。目前,我國(guó)的水利工程施工管理水平有一定提高,但存在的一些問(wèn)題也不容忽視。必須采取切實(shí)有效的措施,提高施工管理水平,提高工程建設(shè)質(zhì)量。

一、影響水利工程施工質(zhì)量的主要因素

1.1人員

包括參與建設(shè)的組織者、指揮者和操作者。每個(gè)工作人員都直接或間接的影響著工程質(zhì)量,高質(zhì)量的人及其高質(zhì)量的工作才能帶來(lái)高質(zhì)量的產(chǎn)品。提高工程質(zhì)量的關(guān)鍵在于提高人的素質(zhì),包括人的政治素質(zhì)、身體素質(zhì)、技術(shù)素質(zhì)等。

1.2材料

材料的管理應(yīng)從以下3個(gè)方面控制:一是嚴(yán)把材料采購(gòu)關(guān),必須“三證”齊全,才可進(jìn)入倉(cāng)庫(kù);二是嚴(yán)把質(zhì)量關(guān),實(shí)行材料報(bào)檢制度,施工單位自檢、監(jiān)理抽檢、政府質(zhì)量監(jiān)督機(jī)構(gòu)和社會(huì)共同監(jiān)管;三是嚴(yán)格執(zhí)行采購(gòu)計(jì)劃的同時(shí),根據(jù)進(jìn)度和現(xiàn)場(chǎng)情況適時(shí)調(diào)整,以便保證質(zhì)量,減少損失。

1.3機(jī)械

施工機(jī)械設(shè)備對(duì)施工質(zhì)量有著直接的影響。所以在施工機(jī)械設(shè)備選型時(shí),應(yīng)注意經(jīng)濟(jì)上的合理性、技術(shù)上的先進(jìn)性、操作和維護(hù)上的方便性;要根據(jù)工期、工程量大小,安排各類機(jī)械的數(shù)量;確保滿足施工要求;對(duì)特殊設(shè)備按要求通過(guò)相關(guān)部門檢測(cè)方可進(jìn)場(chǎng),一般設(shè)備要定期維修,保證施工安全。

1.4方法

施工方法包括施工方案和施工工藝。一些工程常因施工方案考慮不周或施工工藝落后,而造成施工進(jìn)度推遲,質(zhì)量達(dá)不到要求和追加投資等情況。因此,在制定施工方案和施工工藝時(shí),必須結(jié)合技術(shù)、組織、管理、經(jīng)濟(jì)等方面進(jìn)行綜合分析,以確定施工方案在技術(shù)上可行,經(jīng)濟(jì)上合理,有利于提高工程質(zhì)量。

1.5環(huán)境

環(huán)境因素對(duì)工程質(zhì)量的影響,具有復(fù)雜多變的特點(diǎn)。因此,應(yīng)根據(jù)工程特點(diǎn)和具體條件,對(duì)影響質(zhì)量的環(huán)境因素采取有益的措施嚴(yán)加控制。尤其是施工現(xiàn)場(chǎng),應(yīng)營(yíng)造文明施工和文明生產(chǎn)的環(huán)境。更為重要的是要搞好地方干群關(guān)系,尊重地方風(fēng)俗。

1.6工程設(shè)計(jì)

設(shè)計(jì)是保證工程質(zhì)量的關(guān)鍵,在建設(shè)項(xiàng)目確定以后,工程設(shè)計(jì)就成為基本建設(shè)的關(guān)鍵問(wèn)題了。對(duì)于在建設(shè)的時(shí)候能不能加快速度、保證質(zhì)量、節(jié)約投資,在建成后能不能獲得最大的經(jīng)濟(jì)效果,設(shè)計(jì)工作起著決定作用。一個(gè)先進(jìn)的設(shè)計(jì),應(yīng)該采用先進(jìn)的工藝和設(shè)備,合理地布置場(chǎng)地,組織好生產(chǎn)流程,應(yīng)有利于提高生產(chǎn)效益,降低成本,提高質(zhì)量。

二、提高水利工程施工質(zhì)量的措施

2.1加強(qiáng)領(lǐng)導(dǎo),落實(shí)責(zé)任制

領(lǐng)導(dǎo)重視與否是搞好水利工程質(zhì)量工作的重要前提。水利行政主管部門高度重視水利工程質(zhì)量管理工作,以對(duì)人民負(fù)責(zé)和對(duì)歷史負(fù)責(zé)的責(zé)任心真正把工程質(zhì)量工作落到實(shí)處。全面落實(shí)責(zé)任制,明確單位領(lǐng)導(dǎo)、項(xiàng)目負(fù)責(zé)人、工程技術(shù)人員和具體工作人員責(zé)任,層層落實(shí)責(zé)任制,并加強(qiáng)監(jiān)督和檢查。按照水利工程行業(yè)規(guī)范和技術(shù)要求,組織施工;一旦出現(xiàn)質(zhì)量問(wèn)題,就要追究責(zé)任,即工程質(zhì)量終身制;徹底扭轉(zhuǎn)工程當(dāng)事人置工程質(zhì)量于不顧的態(tài)度,避免工程出現(xiàn)問(wèn)題一走了之的現(xiàn)象發(fā)生。

2.2認(rèn)真抓好施工質(zhì)量管理

施工中的質(zhì)量管理涉及建設(shè)、監(jiān)理、設(shè)計(jì)、施工4方面。建設(shè)單位是主體,具有協(xié)調(diào)其他各方對(duì)工程質(zhì)量進(jìn)行全面監(jiān)督檢查和管理的責(zé)任和權(quán)利。各方應(yīng)積極配合,努力提高工程建設(shè)質(zhì)量,創(chuàng)造優(yōu)質(zhì)工程。具體說(shuō)來(lái),施工中應(yīng)著重抓好以下環(huán)節(jié)。

(1)編制施工組織計(jì)劃,制定施工技術(shù)方案。建設(shè)、監(jiān)理、設(shè)計(jì)、施工各方要根據(jù)國(guó)家有關(guān)施工規(guī)范,結(jié)合該工程特點(diǎn)和施工單位的實(shí)際情況等因素制定切實(shí)可行的施工組織設(shè)計(jì)和針對(duì)該工程的施工技術(shù)方案,施工中要嚴(yán)格按照施工技術(shù)方案執(zhí)行。

(2)實(shí)行工程監(jiān)理制。監(jiān)理是受業(yè)主委托對(duì)工程質(zhì)量進(jìn)行監(jiān)控的,依法享有對(duì)工程質(zhì)量進(jìn)行監(jiān)控的權(quán)力,所以要樹(shù)立監(jiān)理人員的權(quán)威。施工單位在施工中違反施工程序或質(zhì)量不合格,監(jiān)理有權(quán)責(zé)令其停工、返工,或者與相關(guān)部門會(huì)商后采取處罰措施。

(3)建立建全質(zhì)量保證體系。建設(shè)、監(jiān)理、設(shè)計(jì)、施工4方都要有自已的質(zhì)檢組織,建設(shè)單位對(duì)工程質(zhì)量負(fù)總責(zé)。施工中要對(duì)工程分階段、分部分按程序進(jìn)行檢查驗(yàn)收。施工單位所設(shè)質(zhì)檢工程師、專職質(zhì)檢員負(fù)責(zé)施工自檢及施工文件的填寫和編制,按單元工程報(bào)驗(yàn)程序報(bào)驗(yàn),合格后方可進(jìn)入下一步工序,并及時(shí)向質(zhì)檢組織匯報(bào)質(zhì)檢情況。

(4)施工過(guò)程中,施工各方要切實(shí)把質(zhì)量控制放在首位,實(shí)行全面質(zhì)量管理。施工單位要自覺(jué)堅(jiān)持質(zhì)量第一的觀念,質(zhì)檢組織要有高度負(fù)責(zé)的精神,嚴(yán)把質(zhì)量關(guān)。

2.3強(qiáng)化質(zhì)量控制措施

質(zhì)量控制實(shí)行事先、事中、事后“三控制”。事先控制是開(kāi)工前對(duì)施工企業(yè)提交的技術(shù)方案、技術(shù)措施、質(zhì)量保證體系以及管理制度等進(jìn)行審核,特別是對(duì)各企業(yè)投入工程的技術(shù)人員的數(shù)量和素質(zhì)提出具體要求。對(duì)用于工程的原材料、半成品、成品、設(shè)備和運(yùn)到工地的機(jī)械等進(jìn)行控制,未經(jīng)項(xiàng)目監(jiān)理部同意,不得進(jìn)入工地。

事中控制就是工序控制。工序控制實(shí)行“二級(jí)三檢報(bào)驗(yàn)制”,它是保證工程質(zhì)量的有效手段。第1級(jí)是為保證監(jiān)理目標(biāo)的實(shí)現(xiàn),指令施工企業(yè)建立班組初檢、施工隊(duì)復(fù)檢、施工企業(yè)終檢的質(zhì)檢機(jī)構(gòu)與質(zhì)檢制度;第2級(jí)是施工企業(yè)在其內(nèi)部檢查合格的基礎(chǔ)上,填報(bào)“報(bào)驗(yàn)申請(qǐng)單”,報(bào)監(jiān)理工程師工程復(fù)驗(yàn),復(fù)驗(yàn)合格后由業(yè)主終驗(yàn),保證做到上一工序不合格不得進(jìn)入下一工序施工,對(duì)單元工程、監(jiān)理工程師在評(píng)定表上簽驗(yàn)收意見(jiàn)和評(píng)定質(zhì)量等級(jí),關(guān)鍵工序要有業(yè)主、監(jiān)理、設(shè)計(jì)、施工、共同簽字,以確保每道工序都達(dá)到設(shè)計(jì)和規(guī)范要求。

事后控制是對(duì)已完成的單元工程、分部工程和單位工程的質(zhì)量,繼續(xù)進(jìn)行觀察、檢測(cè),收集運(yùn)用過(guò)程中的情況,發(fā)現(xiàn)問(wèn)題及時(shí)處理;同時(shí)對(duì)資料進(jìn)行收集整理歸檔,及時(shí)組織有關(guān)人員檢查驗(yàn)收。

2.4發(fā)揮監(jiān)理工程師作用

監(jiān)理工程師的質(zhì)量控制體系是建立在施工承包商的質(zhì)量保證體系上的。后者是基礎(chǔ),沒(méi)有一個(gè)健全的、運(yùn)轉(zhuǎn)良好的施工質(zhì)量保證體系,監(jiān)理工程師很難發(fā)揮作用。因此,監(jiān)理工程師質(zhì)量控制的首要任務(wù)就是在開(kāi)工令之前,檢查施工承包商是否有一個(gè)健全的質(zhì)量保證體系,沒(méi)有肯定答復(fù),不簽發(fā)開(kāi)工令。監(jiān)理工程師的職能是指導(dǎo)、監(jiān)督和檢查?!爸笇?dǎo)”是向承包商提出應(yīng)如何去建立和健全質(zhì)量保證體系;“監(jiān)督”是在實(shí)施過(guò)程中考查其質(zhì)量保證體系的運(yùn)行情況,制止一切違規(guī)行為;“檢查”是對(duì)運(yùn)行結(jié)果進(jìn)行考核,包括各工序、階段的檢查、驗(yàn)收和質(zhì)量評(píng)定工作。如果讓監(jiān)理去代替施工技術(shù)員、質(zhì)檢員,不僅是力不從心,而且責(zé)任不清,其結(jié)果必然使施工企業(yè)的質(zhì)量保證體系弱化,甚至逐步放棄,從而使整個(gè)質(zhì)量體系處于混亂狀態(tài)。

2.5嚴(yán)禁轉(zhuǎn)包工程

主體工程不能分包;對(duì)分包資質(zhì)要嚴(yán)加審查,不允許多次分包。項(xiàng)目部是獨(dú)立性很強(qiáng)的經(jīng)濟(jì)、技術(shù)實(shí)體,是對(duì)質(zhì)量起保證作用的關(guān)鍵所在。一旦轉(zhuǎn)包或多次分包,責(zé)任會(huì)不明確,從合同法來(lái)講是企業(yè)法人負(fù)責(zé),而在實(shí)際運(yùn)作中,是無(wú)人負(fù)責(zé)。

2.6處理好業(yè)主、監(jiān)理、施工的關(guān)系

在建設(shè)管理中執(zhí)行業(yè)主負(fù)責(zé)制、監(jiān)理制和招投標(biāo)制,是一個(gè)巨大的進(jìn)步。3方都有一個(gè)觀念轉(zhuǎn)變的過(guò)程,各自找準(zhǔn)位置是最重要的。對(duì)號(hào)入座、進(jìn)入角色之后,3方的關(guān)系就易于處理好。3方之間不是上下級(jí)關(guān)系,也不是對(duì)立關(guān)系,而是合同雙方平等互利關(guān)系。業(yè)主和監(jiān)理雖然是管理工作的主動(dòng)方,但是必須認(rèn)清:施工單位是建設(shè)的主體,質(zhì)量控制的好壞,主要取決于施工企業(yè)。分工雖然不同,但都在各自崗位上共同對(duì)國(guó)家負(fù)責(zé)。與地方政府各部門關(guān)系是否正常,是關(guān)系到工程施工是否有個(gè)良好環(huán)境的大事。

2.7加強(qiáng)建設(shè)資金管理

工程投資是確保工程建設(shè)的重要保證。投資應(yīng)統(tǒng)一管理,實(shí)行專戶儲(chǔ)蓄、??顚S?,單項(xiàng)工程單獨(dú)記賬,避免投資被擠占或挪用。要嚴(yán)格控制資金使用,要按合同要求、工程進(jìn)度和質(zhì)量分期付款。凡是質(zhì)量不合格的、工程進(jìn)度未按要求違反合同條款的,可以拒絕付款。要通過(guò)招標(biāo)辦法進(jìn)行承包,通過(guò)公開(kāi)、公平、公正的競(jìng)爭(zhēng),達(dá)到降低工程造價(jià),提高工程質(zhì)量的目的。

參考文獻(xiàn):

[1]張榮芳.淺談水利工程質(zhì)量控制措施[J].中國(guó)科技縱橫,2010(11):321.

[2]裴成元,魏東,許驥.關(guān)于加強(qiáng)水利工程質(zhì)量監(jiān)督隊(duì)伍建設(shè)方法的探討[J].水利建設(shè)與管理,2010(5):33-34.

篇4

1影響水利工程施工質(zhì)量的主要因素

1.1 人員

包括參與建設(shè)的組織者、指揮者和操作者。每個(gè)工作人員都直接或間接的影響著工程質(zhì)量,高質(zhì)量的人及其高質(zhì)量的工作才能帶來(lái)高質(zhì)量的產(chǎn)品。提高工程質(zhì)量的關(guān)鍵在于提高人的素質(zhì),包括人的政治素質(zhì)、身體素質(zhì)、技術(shù)素質(zhì)等。

1.2 材料

材料的管理應(yīng)從以下3個(gè)方面控制:一是嚴(yán)把材料采購(gòu)關(guān),必須“三證”齊全,才可進(jìn)入倉(cāng)庫(kù);二是嚴(yán)把質(zhì)量關(guān),實(shí)行材料報(bào)檢制度,施工單位自檢、監(jiān)理抽檢、政府質(zhì)量監(jiān)督機(jī)構(gòu)和社會(huì)共同監(jiān)管;三是嚴(yán)格執(zhí)行采購(gòu)計(jì)劃的同時(shí),根據(jù)進(jìn)度和現(xiàn)場(chǎng)情況適時(shí)調(diào)整,以便保證質(zhì)量,減少損失。

1.3 機(jī)械

施工機(jī)械設(shè)備對(duì)施工質(zhì)量有著直接的影響。所以在施工機(jī)械設(shè)備選型時(shí),應(yīng)注意經(jīng)濟(jì)上的合理性、技術(shù)上的先進(jìn)性、操作和維護(hù)上的方便性;要根據(jù)工期、工程量大小,安排各類機(jī)械的數(shù)量;確保滿足施工要求;對(duì)特殊設(shè)備按要求通過(guò)相關(guān)部門檢測(cè)方可進(jìn)場(chǎng),一般設(shè)備要定期維修,保證施工安全[1]。

1.4 方法

施工方法包括施工方案和施工工藝。一些工程常因施工方案考慮不周或施工工藝落后,而造成施工進(jìn)度推遲,質(zhì)量達(dá)不到要求和追加投資等情況。因此,在制定施工方案和施工工藝時(shí),必須結(jié)合技術(shù)、組織、管理、經(jīng)濟(jì)等方面進(jìn)行綜合分析,以確定施工方案在技術(shù)上可行,經(jīng)濟(jì)上合理,有利于提高工程質(zhì)量。

1.5 環(huán)境

環(huán)境因素對(duì)工程質(zhì)量的影響,具有復(fù)雜多變的特點(diǎn)。因此,應(yīng)根據(jù)工程特點(diǎn)和具體條件,對(duì)影響質(zhì)量的環(huán)境因素采取有益的措施嚴(yán)加控制。尤其是施工現(xiàn)場(chǎng),應(yīng)營(yíng)造文明施工和文明生產(chǎn)的環(huán)境。更為重要的是要搞好地方干群關(guān)系,尊重地方風(fēng)俗。

1.6 工程設(shè)計(jì)

設(shè)計(jì)是保證工程質(zhì)量的關(guān)鍵,在建設(shè)項(xiàng)目確定以后,工程設(shè)計(jì)就成為基本建設(shè)的關(guān)鍵問(wèn)題了。對(duì)于在建設(shè)的時(shí)候能不能加快速度、保證質(zhì)量、節(jié)約投資,在建成后能不能獲得最大的經(jīng)濟(jì)效果,設(shè)計(jì)工作起著決定作用。一個(gè)先進(jìn)的設(shè)計(jì),應(yīng)該采用先進(jìn)的工藝和設(shè)備,合理地布置場(chǎng)地,組織好生產(chǎn)流程,應(yīng)有利于提高生產(chǎn)效益,降低成本,提高質(zhì)量。

2提高水利工程施工質(zhì)量的措施

2.1 加強(qiáng)領(lǐng)導(dǎo),落實(shí)責(zé)任制

領(lǐng)導(dǎo)重視與否是搞好水利工程質(zhì)量工作的重要前提。水利行政主管部門高度重視水利工程質(zhì)量管理工作,以對(duì)人民負(fù)責(zé)和對(duì)歷史負(fù)責(zé)的責(zé)任心真正把工程質(zhì)量工作落到實(shí)處。全面落實(shí)責(zé)任制,明確單位領(lǐng)導(dǎo)、項(xiàng)目負(fù)責(zé)人、工程技術(shù)人員和具體工作人員責(zé)任,層層落實(shí)責(zé)任制,并加強(qiáng)監(jiān)督和檢查。按照水利工程行業(yè)規(guī)范和技術(shù)要求,組織施工;一旦出現(xiàn)質(zhì)量問(wèn)題,就要追究責(zé)任,即工程質(zhì)量終身制;徹底扭轉(zhuǎn)工程當(dāng)事人置工程質(zhì)量于不顧的態(tài)度,避免工程出現(xiàn)問(wèn)題一走了之的現(xiàn)象發(fā)生。

2.2 認(rèn)真抓好施工質(zhì)量管理

施工中的質(zhì)量管理涉及建設(shè)、監(jiān)理、設(shè)計(jì)、施工4方面。建設(shè)單位是主體,具有協(xié)調(diào)其他各方對(duì)工程質(zhì)量進(jìn)行全面監(jiān)督檢查和管理的責(zé)任和權(quán)利。各方應(yīng)積極配合,努力提高工程建設(shè)質(zhì)量,創(chuàng)造優(yōu)質(zhì)工程。具體說(shuō)來(lái),施工中應(yīng)著重抓好以下環(huán)節(jié)。

2.2.1 編制施工組織計(jì)劃,制定施工技術(shù)方案。建設(shè)、監(jiān)理、設(shè)計(jì)、施工各方要根據(jù)國(guó)家有關(guān)施工規(guī)范,結(jié)合該工程特點(diǎn)和施工單位的實(shí)際情況等因素制定切實(shí)可行的施工組織設(shè)計(jì)和針對(duì)該工程的施工技術(shù)方案,施工中要嚴(yán)格按照施工技術(shù)方案執(zhí)行。

2.2.2 實(shí)行工程監(jiān)理制。監(jiān)理是受業(yè)主委托對(duì)工程質(zhì)量進(jìn)行監(jiān)控的,依法享有對(duì)工程質(zhì)量進(jìn)行監(jiān)控的權(quán)力,所以要樹(shù)立監(jiān)理人員的權(quán)威。施工單位在施工中違反施工程序或質(zhì)量不合格,監(jiān)理有權(quán)責(zé)令其停工、返工,或者與相關(guān)部門會(huì)商后采取處罰措施。

2.2.3 建立建全質(zhì)量保證體系。建設(shè)、監(jiān)理、設(shè)計(jì)、施工4方都要有自已的質(zhì)檢組織,建設(shè)單位對(duì)工程質(zhì)量負(fù)總責(zé)。施工中要對(duì)工程分階段、分部分按程序進(jìn)行檢查驗(yàn)收。施工單位所設(shè)質(zhì)檢工程師、專職質(zhì)檢員負(fù)責(zé)施工自檢及施工文件的填寫和編制,按單元工程報(bào)驗(yàn)程序報(bào)驗(yàn),合格后方可進(jìn)入下一步工序,并及時(shí)向質(zhì)檢組織匯報(bào)質(zhì)檢情況。

2.2.4 施工過(guò)程中,施工各方要切實(shí)把質(zhì)量控制放在首位,實(shí)行全面質(zhì)量管理。施工單位要自覺(jué)堅(jiān)持質(zhì)量第一的觀念,質(zhì)檢組織要有高度負(fù)責(zé)的精神,嚴(yán)把質(zhì)量關(guān)。

2.3 強(qiáng)化質(zhì)量控制措施

質(zhì)量控制實(shí)行事先、事中、事后“三控制”。事先控制是開(kāi)工前對(duì)施工企業(yè)提交的技術(shù)方案、技術(shù)措施、質(zhì)量保證體系以及管理制度等進(jìn)行審核,特別是對(duì)各企業(yè)投入工程的技術(shù)人員的數(shù)量和素質(zhì)提出具體要求。對(duì)用于工程的原材料、半成品、成品、設(shè)備和運(yùn)到工地的機(jī)械等進(jìn)行控制,未經(jīng)項(xiàng)目監(jiān)理部同意,不得進(jìn)入工地。事中控制就是工序控制。工序控制實(shí)行“二級(jí)三檢報(bào)驗(yàn)制”,它是保證工程質(zhì)量的有效手段。第1級(jí)是為保證監(jiān)理目標(biāo)的實(shí)現(xiàn),指令施工企業(yè)建立班組初檢、施工隊(duì)復(fù)檢、施工企業(yè)終檢的質(zhì)檢機(jī)構(gòu)與質(zhì)檢制度;第2級(jí)是施工企業(yè)在其內(nèi)部檢查合格的基礎(chǔ)上,填報(bào)“報(bào)驗(yàn)申請(qǐng)單”,報(bào)監(jiān)理工程師工程復(fù)驗(yàn),復(fù)驗(yàn)合格后由業(yè)主終驗(yàn),保證做到上一工序不合格不得進(jìn)入下一工序施工,對(duì)單元工程、監(jiān)理工程師在評(píng)定表上簽驗(yàn)收意見(jiàn)和評(píng)定質(zhì)量等級(jí),關(guān)鍵工序要有業(yè)主、監(jiān)理、設(shè)計(jì)、施工、共同簽字,以確保每道工序都達(dá)到設(shè)計(jì)和規(guī)范要求。

事后控制是對(duì)已完成的單元工程、分部工程和單位工程的質(zhì)量,繼續(xù)進(jìn)行觀察、檢測(cè),收集運(yùn)用過(guò)程中的情況,發(fā)現(xiàn)問(wèn)題及時(shí)處理;同時(shí)對(duì)資料進(jìn)行收集整理歸檔,及時(shí)組織有關(guān)人員檢查驗(yàn)收。

2.4 發(fā)揮監(jiān)理工程師作用

監(jiān)理工程師的質(zhì)量控制體系是建立在施工承包商的質(zhì)量保證體系上的。后者是基礎(chǔ),沒(méi)有一個(gè)健全的、運(yùn)轉(zhuǎn)良好的施工質(zhì)量保證體系,監(jiān)理工程師很難發(fā)揮作用。因此,監(jiān)理工程師質(zhì)量控制的首要任務(wù)就是在開(kāi)工令之前,檢查施工承包商是否有一個(gè)健全的質(zhì)量保證體系,沒(méi)有肯定答復(fù),不簽發(fā)開(kāi)工令。監(jiān)理工程師的職能是指導(dǎo)、監(jiān)督和檢查?!爸笇?dǎo)”是向承包商提出應(yīng)如何去建立和健全質(zhì)量保證體系;“監(jiān)督”是在實(shí)施過(guò)程中考查其質(zhì)量保證體系的運(yùn)行情況,制止一切違規(guī)行為;“檢查”是對(duì)運(yùn)行結(jié)果進(jìn)行考核,包括各工序、階段的檢查、驗(yàn)收和質(zhì)量評(píng)定工作。如果讓監(jiān)理去代替施工技術(shù)員、質(zhì)檢員,不僅是力不從心,而且責(zé)任不清,其結(jié)果必然使施工企業(yè)的質(zhì)量保證體系弱化,甚至逐步放棄,從而使整個(gè)質(zhì)量體系處于混亂狀態(tài)。

2.5嚴(yán)禁轉(zhuǎn)包工程

主體工程不能分包;對(duì)分包資質(zhì)要嚴(yán)加審查,不允許多次分包。項(xiàng)目部是獨(dú)立性很強(qiáng)的經(jīng)濟(jì)、技術(shù)實(shí)體,是對(duì)質(zhì)量起保證作用的關(guān)鍵所在。一旦轉(zhuǎn)包或多次分包,責(zé)任會(huì)不明確,從合同法來(lái)講是企業(yè)法人負(fù)責(zé),而在實(shí)際運(yùn)作中,是無(wú)人負(fù)責(zé)。

篇5

關(guān)鍵詞:建筑結(jié)構(gòu);防滲墻;監(jiān)理;混凝土;專業(yè)技術(shù)

Abstract: the construction technology of the diaphragm wall in China has made dramatic progress, by the original impact or rotary drill rig with pile formed after continuous wall construction method, into nowadays more advanced into the wall construction methods: hydraulic grab for the leading machinery. At the same time, the key is building engineering underground diaphragm wall the safety of structures, the construction quality and have a direct relationship. In this paper focuses on the impact of construction quality of several major factors and guarantee measures and construction quality more than technical measures of construction projects is also discussed in the underground cut-off wall of quality control.

Keywords: building structure; Diaphragm wall; Supervision; Concrete; Professional technology

中圖分類號(hào):TU3文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):

在建筑工程中地下工程建筑物是與國(guó)計(jì)民生緊密相連的,工程能否安全有效地運(yùn)行是由建筑質(zhì)量的優(yōu)劣決定的,也是成為放心工程的重要環(huán)節(jié)。建筑工程中地下建筑物出現(xiàn)滲漏的現(xiàn)象普遍存在,具有相當(dāng)大的危害性,甚至?xí)?duì)建筑結(jié)構(gòu)的安全構(gòu)成威脅。因而對(duì)地下工程建筑物的抗?jié)B要求非常高,在施工過(guò)程中采取措施確保工程質(zhì)量也是必須的。

質(zhì)量控制的措施和手段:

建立完善的監(jiān)理工程師質(zhì)量控制系統(tǒng)監(jiān)理單位依據(jù)項(xiàng)目的規(guī)模、標(biāo)準(zhǔn)、工作內(nèi)容及客觀實(shí)際情況組建項(xiàng)目監(jiān)理部、配備監(jiān)理工程師等人員。監(jiān)理部實(shí)行質(zhì)量分級(jí)負(fù)責(zé)制,設(shè)總監(jiān)理工程師、項(xiàng)目(專業(yè))監(jiān)理工程師,制定了監(jiān)理人員崗位責(zé)任制度,明確了各級(jí)監(jiān)理人員的崗位職責(zé),形成較完善的質(zhì)量控制系統(tǒng),將質(zhì)量控制責(zé)任到人,各盡其責(zé),使監(jiān)理質(zhì)量控制工作規(guī)范化、制度化,真正做到有章可循。

督促承包商建立健全質(zhì)量保證體系承包商是工程項(xiàng)目的具體實(shí)施者,他們的工作直接關(guān)系到工程質(zhì)量的優(yōu)劣。在項(xiàng)目開(kāi)工前監(jiān)理工程師就督促承包商根據(jù)工程質(zhì)量要求,建立了質(zhì)量保證體系,沒(méi)有可靠的質(zhì)量保證體系和相應(yīng)的質(zhì)量保證措施,不允許其開(kāi)工。工程開(kāi)工后,施工單位要嚴(yán)格實(shí)行“三檢制”,承包商完成每道工序并通過(guò)“三檢”后,必須由監(jiān)理工程師進(jìn)行檢查認(rèn)證、質(zhì)量評(píng)定,否則不得進(jìn)行下道工序施工。針對(duì)施工單位基層施工人員文化程度不高,質(zhì)量意識(shí)不強(qiáng)這一現(xiàn)實(shí),督促項(xiàng)目部建立了質(zhì)量獎(jiǎng)懲制度,實(shí)現(xiàn)了分班組、分工序?qū)H素?fù)責(zé),進(jìn)一步完善了承包商的質(zhì)量保證體系,做內(nèi)部的質(zhì)量控制和質(zhì)量驗(yàn)證,增強(qiáng)了可操作性,在施工現(xiàn)場(chǎng)可看到寫有工序質(zhì)量負(fù)責(zé)人的標(biāo)牌,時(shí)時(shí)提醒施工人員的質(zhì)量意識(shí)。

事前質(zhì)量預(yù)控(1)掌握和熟悉質(zhì)量控制的技術(shù)依據(jù):防滲墻設(shè)計(jì)文件;《水利水電工程混凝土防滲墻施工技術(shù)規(guī)范》SL174-96;合同文件的質(zhì)量條款。(2)施工現(xiàn)場(chǎng)的質(zhì)量檢驗(yàn),驗(yàn)收。(3)施工單位的資質(zhì)審核。(4)工程所用原料材的質(zhì)量控制:用于防滲墻施工的水泥、減水劑等原材料必須有“三證”即生產(chǎn)許可證、出廠合格證、材質(zhì)檢驗(yàn)報(bào)告單,且按要求進(jìn)行抽檢。中間產(chǎn)品砂石骨料必須經(jīng)檢驗(yàn)合格后方可用于拌制混凝土。(5)審查承包商的施工組織設(shè)計(jì):包括施工布置、施工措施、施工程序、施工方法和施工機(jī)械、人員結(jié)構(gòu)的組成、進(jìn)度計(jì)劃等,監(jiān)理工程對(duì)施工組織設(shè)計(jì)進(jìn)行認(rèn)真審查,并提出審查意見(jiàn)報(bào)業(yè)主審定批復(fù),經(jīng)批準(zhǔn)的施工組織設(shè)計(jì)在施工過(guò)程中嚴(yán)格執(zhí)行,是監(jiān)理工程師進(jìn)行質(zhì)量控制的主要依據(jù)之一。

實(shí)現(xiàn)施工過(guò)程巡視監(jiān)控根據(jù)防滲墻工程的施工特點(diǎn),監(jiān)理工程師現(xiàn)場(chǎng)巡視,對(duì)一些重要工序、關(guān)鍵部位、薄弱環(huán)節(jié)旁站監(jiān)理,如見(jiàn)基面的鑒定、混凝土澆筑等,項(xiàng)目監(jiān)理與施工單位同步,現(xiàn)場(chǎng)巡視主要是對(duì)施工中的資源配置、施工方法和各項(xiàng)施工技術(shù)活動(dòng)的質(zhì)量、工藝流程進(jìn)行監(jiān)督、檢查、記錄,著重檢查以下各工序的質(zhì)量:導(dǎo)管連結(jié)的密封性,導(dǎo)管下置的位置及間距,混凝土出口溫度,預(yù)埋灌漿管下設(shè)位置、長(zhǎng)度,開(kāi)盤后導(dǎo)管的埋深,混凝土上升速度,墻體材料的坍落度、擴(kuò)散度等。

工序質(zhì)量抽樣檢查、檢測(cè)當(dāng)監(jiān)理工程師在監(jiān)理過(guò)程中發(fā)現(xiàn)有工藝式質(zhì)量問(wèn)題時(shí),及時(shí)要求施工方采取相應(yīng)措施。

在建筑工程中,地下防滲墻施工是一種廣泛使用的技術(shù),是一項(xiàng)復(fù)雜的系統(tǒng)工程,地質(zhì),土木,機(jī)械,電子等多學(xué)科綜合運(yùn)用技術(shù)手段,需要在完整的時(shí)間和空間。因此,影響工程質(zhì)量的因素非常復(fù)雜,但可以概括為:材料,設(shè)備,技術(shù),環(huán)境與人。凡是為建筑項(xiàng)目所需進(jìn)入施工現(xiàn)場(chǎng)并在施工實(shí)施過(guò)程中實(shí)際消耗掉的原材料都屬于“材料”的范圍,這些都是影響建筑產(chǎn)品質(zhì)量的內(nèi)在因素。在建筑項(xiàng)目施工中應(yīng)用到的各類機(jī)具設(shè)備能分成兩種:一種是固定資產(chǎn),另一種是低值易耗類。例如:土(石)方施工機(jī)械、樁工機(jī)械、起重吊裝機(jī)械、鋼筋加工機(jī)械、混凝土(灰)拌和輸送機(jī)械等屬于資產(chǎn)類;而膠輪車、模板支撐、架手腳具、度衡量具等則屬于低值易耗類。外部環(huán)境與保證工程質(zhì)量密切相關(guān)。凡直接或間接參與工程項(xiàng)目建設(shè)的全部人員,都間接或直接地影響著工程質(zhì)量。只有保證工作質(zhì)量才能保證施工質(zhì)量,其關(guān)鍵在于保證參與人員的素質(zhì),包括人的政治思想素質(zhì)、質(zhì)量意識(shí)、責(zé)任心和敬業(yè)愛(ài)崗、專業(yè)技術(shù)水平等。工程施工質(zhì)量要靠人去創(chuàng)造,只有高素質(zhì)的人及其高水平的工作才能建造出高質(zhì)量的工程。

防滲墻工程施工質(zhì)量的保證措施:1 事前主動(dòng)控制是施工企業(yè)未進(jìn)場(chǎng)開(kāi)工前要做好的工作。根據(jù)工程規(guī)模、性質(zhì)、等級(jí)和特點(diǎn),選擇施工質(zhì)量信譽(yù)好,有相應(yīng)施工資質(zhì)的企業(yè)(含分包企業(yè))。要嚴(yán)格考察其法律資格、技術(shù)能力,如施工經(jīng)驗(yàn)、機(jī)械設(shè)備及勞動(dòng)力條件、財(cái)務(wù)運(yùn)行狀況等。經(jīng)過(guò)篩選后按有關(guān)規(guī)定規(guī)范運(yùn)作,通過(guò)招標(biāo)方式選擇和批準(zhǔn)確定施工企業(yè),把好施工企業(yè)的準(zhǔn)入關(guān),并按規(guī)定選擇好工程監(jiān)理單位,全部實(shí)行合同管理。適時(shí)按規(guī)定向水利工程質(zhì)量監(jiān)督機(jī)構(gòu)銜接和協(xié)調(diào)好有關(guān)具體工作事項(xiàng),確定合理的施工工期并明確災(zāi)害性外界環(huán)境因素(指不可預(yù)見(jiàn)的)對(duì)工期影響后的處理方法,不應(yīng)盲目追求完工期限。了解有關(guān)現(xiàn)行法律法規(guī),關(guān)于管理專業(yè)配套、人員數(shù)量、資格與其承擔(dān)的工程質(zhì)量管理要求相適應(yīng)的管理人員和責(zé)任人員。中途盡量不要更換,使其相對(duì)穩(wěn)定,增強(qiáng)責(zé)任和周全考慮質(zhì)量方面的問(wèn)題。嚴(yán)格審查、確定施工企業(yè)的質(zhì)量保證體系及其劃分的單位、分部、單元工程項(xiàng)目。完善其質(zhì)量檢驗(yàn)、測(cè)試、計(jì)量和措施。確定違規(guī)的整改期限和造成不同檔次施工質(zhì)量事故的處罰措施。2 事中檢查是在施工過(guò)程中對(duì)照施工的規(guī)范檢查。嚴(yán)格檢查施工企業(yè)在投標(biāo)文件中承諾的各種機(jī)具設(shè)備、人員組合、項(xiàng)目經(jīng)理、各項(xiàng)施工技術(shù)保證措施是否按時(shí)到位、技術(shù)工種作業(yè)人員持證上崗以及所有機(jī)械設(shè)備、原材料、構(gòu)件的品級(jí)質(zhì)量。對(duì)主要且用量較大的要采用定點(diǎn)供貨方法,以求質(zhì)量的穩(wěn)定性。對(duì)照水利行業(yè)的施工技術(shù)規(guī)范、標(biāo)準(zhǔn),強(qiáng)化工序控制檢查,做到認(rèn)真復(fù)查上道工序質(zhì)量,保證本道工序質(zhì)量。上道工序質(zhì)量不合格的不得進(jìn)行后續(xù)工序的施工。在本道工序?qū)嵤┻^(guò)程中應(yīng)隨時(shí)觀察圖形的平面幾何尺寸、軸線、縱向的高程、拱度、垂度、鋼筋的規(guī)程、數(shù)量、布置、模板支撐的變形和位移,要善于發(fā)現(xiàn)質(zhì)量波動(dòng)、變異或事故征兆,及時(shí)調(diào)整處理。3 事后嚴(yán)肅把關(guān)。對(duì)于質(zhì)量控制要點(diǎn)、要害部位或質(zhì)量有疑問(wèn)的部位進(jìn)行事后復(fù)檢。嚴(yán)格按照質(zhì)量評(píng)判標(biāo)準(zhǔn)對(duì)單元、分部、單位工程組織驗(yàn)收認(rèn)證。實(shí)行質(zhì)量保證金制度,讓“制造”者跟蹤一段時(shí)間的質(zhì)量保證,完善其缺陷服務(wù)責(zé)任。在一定的時(shí)間內(nèi),盡量讓工程在設(shè)計(jì)負(fù)載條件下運(yùn)行后,再對(duì)整個(gè)工程組織驗(yàn)收。

防滲墻施工質(zhì)量控制措施在施工中,做到施工管理規(guī)范、詳細(xì)的基礎(chǔ)上,防滲墻的質(zhì)量在技術(shù)上采取以下措施。1 成墻質(zhì)量控制。2 弱風(fēng)化面鑒定質(zhì)量控制。3清孔質(zhì)量。4通過(guò)優(yōu)選級(jí)配,控制好原材料質(zhì)量來(lái)減少混凝土的收縮

結(jié)論:

總之,地下防滲墻工程必須貫徹“以防為主,防檢結(jié)合”的方針,做到縱向全過(guò)程、橫向全系統(tǒng)、意識(shí)全方向、時(shí)間全控制的質(zhì)量管理要求。再輔以必要的技術(shù)手段,結(jié)合運(yùn)用多種督查手段、措施,確保工程質(zhì)量,滿足使用功能,外表美觀大方。

參考文獻(xiàn)

[1]陶景良.混凝土防滲墻施工[M].北京:水電出版社,1988.

[2]高鐘璞.大壩基礎(chǔ)防滲瑚[M].北京:中國(guó)電力出版社,2002.

篇6

【關(guān)鍵詞】公路工程 質(zhì)量 監(jiān)理

中圖分類號(hào): F540.3 文獻(xiàn)標(biāo)識(shí)碼: A 文章編號(hào):

公路工程建設(shè)是國(guó)家一項(xiàng)重要的基礎(chǔ)設(shè)施建設(shè),為保證公路工程的質(zhì)量,一般采用“企業(yè)自檢、社會(huì)監(jiān)理、政府監(jiān)督”的質(zhì)量保證管理模式,其中社會(huì)監(jiān)理是這一體系的重要組成部分。公路工程監(jiān)理工作的主要內(nèi)容是“三控制、一管理”,即:質(zhì)量控制、進(jìn)度控制、費(fèi)用控制、合同管理。對(duì)于工程監(jiān)理的“三控制”,從辨證的角度講是相互對(duì)立,而又相互統(tǒng)一的整體,是環(huán)環(huán)相扣的。沒(méi)有質(zhì)量的進(jìn)度是“豆腐渣”工程,沒(méi)有進(jìn)度的質(zhì)量是“虧本”工程,沒(méi)有合理費(fèi)用的支持更是不可想象的。因此,任何一個(gè)環(huán)節(jié)出現(xiàn)問(wèn)題,都會(huì)給工程帶來(lái)不良后果,直接影響到公路工程的正常進(jìn)行。

公路工程監(jiān)理質(zhì)量控制的意義

實(shí)行監(jiān)理控制質(zhì)量能克服過(guò)去在計(jì)劃經(jīng)濟(jì)體制下公路建設(shè)工程管理上的弊端,強(qiáng)化工程建設(shè)的質(zhì)量管理。實(shí)行監(jiān)理制度后,業(yè)主通過(guò)監(jiān)理合同將工程管理委托給專業(yè)化、社會(huì)化的監(jiān)理單位,以科學(xué)化、規(guī)范化的方式進(jìn)行管理,使業(yè)主擺脫了大量繁瑣的工程管理工作,以利于集中精力解決資金籌措等重大問(wèn)題。通過(guò)監(jiān)理單位,大大強(qiáng)化了對(duì)工程質(zhì)量、投資、進(jìn)度等方面的控制,以保證建設(shè)項(xiàng)目總目標(biāo)的實(shí)現(xiàn)。

在質(zhì)量控制方面,監(jiān)理單位根據(jù)監(jiān)理合同進(jìn)行質(zhì)量控制,有了法律上的保證。監(jiān)理可以對(duì)設(shè)計(jì)、施工等重要的與質(zhì)量有關(guān)的環(huán)節(jié)進(jìn)行檢查,使監(jiān)理、設(shè)計(jì)、施工單位之間,在保證工程質(zhì)量的全部活動(dòng)中相互溝通,而且監(jiān)理單位可以協(xié)助建設(shè)單位進(jìn)行質(zhì)量決策,解決重大的質(zhì)量問(wèn)題。監(jiān)理單位進(jìn)行質(zhì)量控制活動(dòng),可以大大促進(jìn)和完善設(shè)計(jì)、施工單位的質(zhì)量保證體系。監(jiān)理單位可以向設(shè)計(jì)單位傳達(dá)業(yè)主的有關(guān)信息,使設(shè)計(jì)文件既符合規(guī)范和標(biāo)準(zhǔn),又滿足業(yè)主的需要。同時(shí),監(jiān)理單位還可以對(duì)設(shè)計(jì)單位的質(zhì)量保證體系的各個(gè)方面進(jìn)行檢查,有利于促進(jìn)和完善設(shè)計(jì)單位的質(zhì)量保證體系,以保證設(shè)計(jì)質(zhì)量。

監(jiān)理對(duì)質(zhì)量的控制,有利于創(chuàng)造設(shè)計(jì)、施工單位質(zhì)量管理良好的合同環(huán)境。監(jiān)理、分包、供貨、外協(xié)等單位,都是質(zhì)量保證體系的合同環(huán)境,監(jiān)理單位要對(duì)相關(guān)單位的工程質(zhì)量活動(dòng),進(jìn)行必要的監(jiān)理,審查各相關(guān)單位的質(zhì)量保證體系,對(duì)他們的產(chǎn)品質(zhì)量進(jìn)行檢驗(yàn)、認(rèn)證、驗(yàn)收等把關(guān)活動(dòng)。這樣才能對(duì)工程建設(shè)實(shí)行全面的質(zhì)量管理。

公路工程質(zhì)量監(jiān)理的措施

要做到分工明確,責(zé)任到人。根據(jù)工程項(xiàng)目進(jìn)行明確分工,特別是路基土石方、橋涵構(gòu)造物、路面各結(jié)構(gòu)層等關(guān)鍵要害部位。做到分工明確、各負(fù)其責(zé),以便對(duì)每道工序進(jìn)行全方位、全過(guò)程的控制和管理。這樣就避免因出現(xiàn)工作混亂,職責(zé)不清而影響工作效率。

2、嚴(yán)格控制原材料的進(jìn)場(chǎng)質(zhì)量是工程質(zhì)量控制的基礎(chǔ)。原材料是影響公路工程質(zhì)量的根源所在,因此要加強(qiáng)所用原材料的檢驗(yàn)和檢測(cè),這就要求我們?cè)谠牧线M(jìn)場(chǎng)前和進(jìn)場(chǎng)后都要不問(wèn)斷的進(jìn)行抽樣試驗(yàn)和檢測(cè),這是質(zhì)量監(jiān)理監(jiān)控的基礎(chǔ),一旦發(fā)現(xiàn)不合格就要拒其進(jìn)場(chǎng)或拒其使用,將影響質(zhì)量的隱患扼殺在萌芽狀態(tài)。

3、全過(guò)程監(jiān)理是工程質(zhì)量控制的基本方法。全過(guò)程監(jiān)理是對(duì)某項(xiàng)工程質(zhì)量的事前控制、事中控制、事后控制。

(1))事前質(zhì)量控制

①要督促承包商自檢體系的正常運(yùn)行。承包商自檢體系是三級(jí)質(zhì)量保證體系,即“政府監(jiān)督、社會(huì)監(jiān)督、企業(yè)自檢”的基礎(chǔ)環(huán)節(jié),同時(shí)也是保證工程施工質(zhì)量的關(guān)鍵點(diǎn)。

②要嚴(yán)格審查分項(xiàng)工程的開(kāi)工報(bào)告。分項(xiàng)工程開(kāi)工以前駐地監(jiān)理工程師應(yīng)審承包商的開(kāi)工報(bào)告,提出適用于所有工程項(xiàng)目進(jìn)行質(zhì)量控制的程序及說(shuō)明,以供所有監(jiān)理人員、承包人和施工人員共同遵循,對(duì)施工機(jī)械設(shè)備、施工方案、建筑材料施工放樣進(jìn)行認(rèn)真細(xì)致地檢查和審批提供放樣測(cè)量、標(biāo)準(zhǔn)試驗(yàn)、施工項(xiàng)目等必要的基礎(chǔ)資料。

③要做好工程的“預(yù)控”?!邦A(yù)控”是指對(duì)工程施工質(zhì)量的預(yù)先控制工作,也就是在工程確定方案以前,了解可能出現(xiàn)的問(wèn)題,并予以事先控制。在單項(xiàng)工程開(kāi)工前,應(yīng)及時(shí)召開(kāi)技術(shù)交底會(huì)和監(jiān)理、承包商見(jiàn)面會(huì),促進(jìn)了解,剖析工序,細(xì)化要點(diǎn),把一切可能發(fā)生的問(wèn)題消滅在“萌芽”狀態(tài)。并結(jié)合設(shè)計(jì)圖紙和施工規(guī)范,對(duì)一些關(guān)鍵工序做出施工監(jiān)理提示,以避免不必要的返工和浪費(fèi),提高一次性合格率。

(2))事中質(zhì)量控制

①要加強(qiáng)旁站監(jiān)理。監(jiān)理的工作實(shí)質(zhì)是對(duì)施工過(guò)程的監(jiān)督管理工作,旁站是監(jiān)理工作的一個(gè)重要組成部分。旁站應(yīng)能找出監(jiān)理工序的關(guān)鍵所在,對(duì)隱蔽工程必須全過(guò)程、全天候、全方位地進(jìn)行旁站,并作好施工記錄,同時(shí)用照片的形式對(duì)這些隱蔽部位的施工過(guò)程加以留存。在旁站過(guò)程中要認(rèn)真記錄施工過(guò)程中的施工進(jìn)展情況。對(duì)施工中一些突發(fā)性問(wèn)題,應(yīng)做到處理果斷、及時(shí)。對(duì)于非隱蔽工程應(yīng)做到旁站與巡視相結(jié)合,駐地監(jiān)理應(yīng)做到發(fā)現(xiàn)問(wèn)題、正視問(wèn)題、解決問(wèn)題、不隱瞞問(wèn)題。

②土方施工質(zhì)量控制。駐地監(jiān)理應(yīng)重視路基土方試驗(yàn)段的工作,通過(guò)試驗(yàn)段的施工,來(lái)確定機(jī)械設(shè)備的配套、碾壓組合、松鋪系數(shù)、壓實(shí)遍數(shù)等專項(xiàng)指標(biāo),并用來(lái)指導(dǎo)施工。認(rèn)真檢驗(yàn)路基填方所用土質(zhì)特性,抽檢最大干密度、最佳含水量、液限、塑性指數(shù)等數(shù)值,不符合規(guī)范要求的土場(chǎng)不得用于路基填方施工;執(zhí)行三不抽檢,即:有“彈簧”不抽檢,含水量偏高不抽檢,平整度不好不抽檢。

③樁基礎(chǔ)施工質(zhì)量控制。施工監(jiān)理應(yīng)認(rèn)真閱讀設(shè)計(jì)文件中有關(guān)工程地質(zhì)資料,發(fā)現(xiàn)在流砂、暗渠等不良地質(zhì),應(yīng)提示承包商采取措施,認(rèn)真復(fù)核護(hù)筒位置,檢測(cè)泥漿比重,泥漿稠度及循環(huán)情況,進(jìn)行水下混凝土灌注過(guò)程中,必須全過(guò)程旁站。嚴(yán)格控制混凝土配比,檢查外加劑使用情況,量測(cè)導(dǎo)管埋深,井孔水頭等,并檢查混凝土坍落度情況,灌注過(guò)程中應(yīng)規(guī)范要求,留取相應(yīng)試件。

(3))事后質(zhì)量控制

①監(jiān)理人員應(yīng)認(rèn)真做好內(nèi)業(yè)資料的整理和歸檔工作。內(nèi)業(yè)資料對(duì)于工程質(zhì)量的優(yōu)劣,具有重要的位置。內(nèi)業(yè)資料的整理應(yīng)遵循“完整、及時(shí)、準(zhǔn)確”的原則,設(shè)立專門的與承包商獨(dú)立的資料檔案室,依照檔案法和工程檔案條例,制訂相應(yīng)的資料管理方法,設(shè)專人負(fù)責(zé)、分類明確、卷內(nèi)目錄詳盡,資料填報(bào)應(yīng)及時(shí)歸檔。

②隱蔽工程的監(jiān)理是工程質(zhì)量控制的重點(diǎn)。隱蔽工程是質(zhì)量隱患的埋藏點(diǎn),也是最不容易控制的。作為監(jiān)理控制來(lái)講最好的辦法是進(jìn)行過(guò)程控制,對(duì)施工過(guò)程中的每道工序都要細(xì)致檢查和全方位旁站,及時(shí)發(fā)現(xiàn)施工中的缺陷,并迅速排除掉,避免工程隱患的出現(xiàn),對(duì)獨(dú)立的公路工程或構(gòu)造物完成后要及時(shí)進(jìn)行檢測(cè)和檢查,一旦不合格馬上進(jìn)行返工處理,避免因此而引起巨大的浪費(fèi)。

③現(xiàn)場(chǎng)監(jiān)督是監(jiān)理監(jiān)控的重要措施?,F(xiàn)場(chǎng)監(jiān)督主要通過(guò)巡視和旁站來(lái)完成,監(jiān)理工程師對(duì)工程施工中的每一道工序都要巡視、旁站、抽樣和檢查,及時(shí)發(fā)現(xiàn)問(wèn)題并提醒承包商采取有效的處理措施,使質(zhì)量誤差控制在允許范圍內(nèi),以便充分保證工程施工質(zhì)量,而對(duì)于每一次巡視檢查的情況都要詳細(xì)記錄在監(jiān)理日志上,以便以后查找有關(guān)工程資料,及時(shí)對(duì)整個(gè)工程的質(zhì)量做出綜合評(píng)定。

總結(jié)

監(jiān)理工作要強(qiáng)調(diào)防患于未然,要將質(zhì)量缺陷消滅在施工之前,盡量不返工或少返工,減少浪費(fèi)。對(duì)于需要返工的工程,監(jiān)理工程師一定要當(dāng)機(jī)立斷,不要把質(zhì)量問(wèn)題留到缺陷責(zé)任期。實(shí)行公路工程質(zhì)量監(jiān)理制度,是深化公路建設(shè)領(lǐng)域改革的需要,是堅(jiān)持對(duì)外開(kāi)放、加強(qiáng)國(guó)際交流與合作,發(fā)展我國(guó)對(duì)外承包工程和勞務(wù)合作的需要。

參考文獻(xiàn)

篇7

關(guān)鍵詞:水利工程;施工;質(zhì)量保證;措施

1組織措施

1.1工程質(zhì)量實(shí)行領(lǐng)導(dǎo)責(zé)任終身制

從項(xiàng)目經(jīng)理部到各工程隊(duì)實(shí)行領(lǐng)導(dǎo)責(zé)任終身制,質(zhì)量目標(biāo),層層分解,終身責(zé)任,一級(jí)包一級(jí),一級(jí)保一級(jí),從嚴(yán)格技術(shù)把關(guān)入手,抓好施工生產(chǎn)全過(guò)程的質(zhì)量管理,做到“六不施工 、三不交接?!绷皇┕な牵翰贿M(jìn)行技術(shù)交底不施工、圖紙和技術(shù)要求不清楚不施工、測(cè)量和資料未經(jīng)審核不施工、材料無(wú)合格證或試驗(yàn)不合格不施工、隱蔽工程未經(jīng)檢查簽證不施工、經(jīng)監(jiān)理工程師認(rèn)可或批準(zhǔn)工序不施工。三不交接是:無(wú)自檢記錄不交接、未經(jīng)監(jiān)理工程師或技術(shù)員驗(yàn)收不交接、施工記錄不全不交接。

1.2健全質(zhì)量檢查機(jī)構(gòu),加強(qiáng)質(zhì)量監(jiān)督檢查

在項(xiàng)目經(jīng)理部設(shè)置安全質(zhì)量科,有專職質(zhì)檢工程師對(duì)整個(gè)工程進(jìn)行全方位施工檢測(cè)。同時(shí)設(shè)立本工程隊(duì)級(jí)質(zhì)檢員,工班有專人兼職質(zhì)檢工作。施工時(shí)堅(jiān)持外檢、互檢、交接檢制度,使工程質(zhì)量在施工全過(guò)程都處于受控狀態(tài)之中。

2管理措施

2.1開(kāi)展全面質(zhì)量管理

抓好質(zhì)量教育,加強(qiáng)全員質(zhì)量意識(shí),牢固樹(shù)立“百年大計(jì),質(zhì)量第一”的觀念。從材料的采購(gòu)供應(yīng)、質(zhì)檢驗(yàn)收到各個(gè)工序的施工生產(chǎn)過(guò)程、竣工驗(yàn)交等執(zhí)行全過(guò)程管理,用良好的工作質(zhì)量來(lái)保證工序質(zhì)量,把全面質(zhì)量管理的思想、方法確實(shí)應(yīng)用到本標(biāo)段施工的全過(guò)程。為此施工隊(duì)?wèi)?yīng)建立全面質(zhì)量保證管理體系。

2.2開(kāi)展標(biāo)準(zhǔn)化作業(yè)

工程嚴(yán)格按標(biāo)準(zhǔn)化作業(yè),做到工序有標(biāo)準(zhǔn)、有檢查,凡是檢查都要有結(jié)論(按獎(jiǎng)罰條例執(zhí)行),各項(xiàng)工程的主要工序,嚴(yán)格按照作業(yè)標(biāo)準(zhǔn)進(jìn)行操作,把新技術(shù)、新工藝、新方法,運(yùn)用到各項(xiàng)施工生產(chǎn)中去,切實(shí)保證標(biāo)準(zhǔn)化作業(yè)質(zhì)量。

2.3積極開(kāi)展QC小組活動(dòng)

成立提高工序質(zhì)量和工程質(zhì)量的QC小組,科學(xué)解決施工中的關(guān)鍵質(zhì)量問(wèn)題,特別是對(duì)濕陷性黃土的防水和壓實(shí)問(wèn)題進(jìn)行重點(diǎn)攻關(guān),普遍實(shí)行工點(diǎn)、工序掛牌施工,廣泛接受各方面監(jiān)督。

2.3.1嚴(yán)格技術(shù)標(biāo)準(zhǔn),尊重監(jiān)理。按施工圖施工,遵守招標(biāo)文件列出的各種技術(shù)規(guī)范、規(guī)定。遇有設(shè)計(jì)與實(shí)際不符的情況,及時(shí)報(bào)監(jiān)理工程師核查解決。嚴(yán)格執(zhí)行監(jiān)理工程師簽證制度,隨時(shí)接受監(jiān)理工程師的檢查指導(dǎo)。

2.3.2嚴(yán)把材料關(guān)。外購(gòu)材料必須三證(出廠證、合格證、檢驗(yàn)證)齊全,進(jìn)場(chǎng)后需按規(guī)定抽檢,合格后方可使用。材料必須選擇質(zhì)量好,信譽(yù)高的廠家訂購(gòu)。

3技術(shù)措施(以水保骨干壩施工中壩體填筑為例)

3.1壩體填筑質(zhì)量保證措施

水保骨干壩施工中壩體填筑選料和碾壓施工是工程質(zhì)量的重中之重,必須建立健全質(zhì)量體系,提高全員質(zhì)量意識(shí),明確制定質(zhì)量目標(biāo),確保工程優(yōu)良,滿足工程等級(jí)要求。

3.1.1按有關(guān)規(guī)范施工。按照招標(biāo)文件中技術(shù)條款及有關(guān)規(guī)范,運(yùn)用科學(xué)的方法選用符合設(shè)計(jì)要求的填筑且進(jìn)行土料的碾壓試驗(yàn),掌握壩體填筑壓實(shí)標(biāo)準(zhǔn),確定填筑施工參數(shù),完善排水措施。

3.1.2建立設(shè)備精良齊全的工地試驗(yàn)室。為了確保工程質(zhì)量,在開(kāi)工之前,首先根據(jù)工程需要,建立能滿足各項(xiàng)試驗(yàn)要求的工地試驗(yàn)室,選派技術(shù)熟練的人員,組成強(qiáng)干的試驗(yàn)隊(duì)伍,裝備精良齊全的試驗(yàn)儀器,在有關(guān)專家的指導(dǎo)下,做好各項(xiàng)試驗(yàn)工作。試驗(yàn)人員持證上崗,試驗(yàn)儀器設(shè)備經(jīng)由國(guó)家有關(guān)部門標(biāo)定認(rèn)可。

3.1.3作好各項(xiàng)試驗(yàn)和測(cè)試。按照設(shè)計(jì)和施工技術(shù)要求,認(rèn)真執(zhí)行水利水電土工試驗(yàn)規(guī)程,作好各項(xiàng)試驗(yàn)和測(cè)試工作。進(jìn)場(chǎng)后,在開(kāi)工之前,首先對(duì)土壤進(jìn)行詳細(xì)的調(diào)查和取樣,在此基礎(chǔ)上,作好以下試驗(yàn)和測(cè)試工作,進(jìn)行土質(zhì)分析試驗(yàn),詳細(xì)查清場(chǎng)內(nèi)砂壤土分布的范圍和厚度,為施工時(shí)采取處理措施提供準(zhǔn)確可靠的依據(jù)。

對(duì)場(chǎng)區(qū)內(nèi)所有土樣進(jìn)行全面系統(tǒng)地物理性能指標(biāo)試驗(yàn)和有關(guān)力學(xué)性能指標(biāo)試驗(yàn)。

一方面,進(jìn)行壩體填筑壓實(shí)工藝專項(xiàng)試驗(yàn)。為了確保工程質(zhì)量和工程進(jìn)度,在正式開(kāi)工之前,要選擇適當(dāng)?shù)膱?chǎng)區(qū),進(jìn)行壩體填筑壓實(shí)工藝試驗(yàn)。通過(guò)試驗(yàn),達(dá)到如下目的:①求得各種土壤碾壓遍數(shù)與干密度的關(guān)系。②含水量的變化對(duì)壓實(shí)效果的影響。③求得不同的壓實(shí)區(qū),不同填料含水量的合理范圍。④求得準(zhǔn)確的壓實(shí)技術(shù)參數(shù),其中包括各種土料的分層厚度,各壓實(shí)區(qū)的松鋪系數(shù),各壓實(shí)區(qū)不同土料達(dá)到壓實(shí)度標(biāo)準(zhǔn)的碾壓遍數(shù),壓實(shí)機(jī)械的合理走行速率,考核確立檢測(cè)手段和檢測(cè)方法,通過(guò)壓實(shí)試驗(yàn),取得各項(xiàng)技術(shù)資料,經(jīng)過(guò)分析整理,提出《壩體壓實(shí)工藝試驗(yàn)報(bào)告》,報(bào)請(qǐng)監(jiān)理批準(zhǔn),用以指導(dǎo)壓實(shí)施工。

另一方面,確立可靠的檢測(cè)方法,建立嚴(yán)密的檢測(cè)制度。①確立檢測(cè)手段。填土壓實(shí)的密實(shí)度檢測(cè),是控制壩體壓實(shí)質(zhì)量的重要環(huán)節(jié),也是評(píng)價(jià)工程質(zhì)量和壓實(shí)效果的基本手段,對(duì)于確保工程質(zhì)量極為重要,為了有效的控制壓實(shí)質(zhì)量,確保工程進(jìn)度,檢測(cè)手段應(yīng)該既能保證檢測(cè)結(jié)果準(zhǔn)確可靠,又能滿足工程進(jìn)度的要求。②建立嚴(yán)格的檢測(cè)制度。在正式進(jìn)行工程檢測(cè)之前,首先要制定一套系統(tǒng)完整嚴(yán)格的檢測(cè)管理制度,一是工作程序性管理制度,把一些對(duì)質(zhì)量具有重要影響的工作程序用制度的形式固定下來(lái):二是專項(xiàng)質(zhì)量檢驗(yàn)、驗(yàn)收制度,按照“跟蹤檢測(cè)”、“復(fù)檢”“抽檢”三個(gè)等級(jí)進(jìn)行。③嚴(yán)格控制含水量。含水量問(wèn)題是影響壓實(shí)效果的關(guān)鍵因素之一,施工中要正確合理的控制含水量范圍,從而可以避免盲目碾壓和不必要的濕潤(rùn)與翻曬,以確保工程質(zhì)量。④采用先進(jìn)的設(shè)備與儀器。在進(jìn)場(chǎng)后,根據(jù)區(qū)內(nèi)不同地質(zhì)的分布情況,進(jìn)行系統(tǒng)的調(diào)查和測(cè)試,詳細(xì)測(cè)定不同地段地表以下各種地質(zhì)的天然密度、天然含水量等有關(guān)情況,選用適宜的振動(dòng)碾壓設(shè)備。⑤重視測(cè)量工作。組建強(qiáng)干的測(cè)量隊(duì)伍,配備先進(jìn)的測(cè)量?jī)x器,測(cè)量工作是從位置,高程和幾何尺寸上確保工程質(zhì)量的控制手段,施工隊(duì)?wèi)?yīng)從隊(duì)伍和設(shè)備兩個(gè)方面保證測(cè)量工作滿足工程質(zhì)量的要求。

選派技術(shù)水平高,操作熟練的技術(shù)人員組成項(xiàng)目經(jīng)理部和工程隊(duì)兩級(jí)強(qiáng)干的測(cè)量隊(duì)伍。經(jīng)理部設(shè)測(cè)量隊(duì),主要負(fù)責(zé)控制測(cè)量、放線定位測(cè)量和對(duì)工程進(jìn)行復(fù)核、檢查及其他抽查性測(cè)量工作。工程隊(duì)測(cè)量班由測(cè)量隊(duì)派人進(jìn)行幫助和監(jiān)督,負(fù)責(zé)掌握檢查施工進(jìn)度,工程質(zhì)量自檢等測(cè)量工作。

裝配先進(jìn)的測(cè)量?jī)x器,項(xiàng)目部裝配全站儀,精密水準(zhǔn)儀等先進(jìn)的測(cè)量?jī)x器,以便充分地保證測(cè)量精度。

測(cè)量時(shí)認(rèn)真作好記錄,所有施工測(cè)量記錄和計(jì)算成果均按工程項(xiàng)目分類裝訂成冊(cè),并附必要的文字說(shuō)明。隱蔽工程的施工測(cè)量資料(即測(cè)量記錄和計(jì)算成果),作為隱蔽工程質(zhì)量檢查的附件,施工測(cè)量資料及竣工資料,作為工程竣工驗(yàn)收的附件。

篇8

關(guān)鍵詞:建筑;材料;質(zhì)量;控制;措施

Abstract: the construction of the quality of the material and construction quality is closely related to the quality of the building materials directly affect the quality of the construction project, the direct impact on the structure of the building and the use function, more directly affect the service life of building long-term. This paper discusses the building materials of quality control.

Keywords: architecture; Materials; Quality; Control; measures

中圖分類號(hào):O213.1文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):

建筑材料( 包括原材料、成品、半成品、構(gòu)配件、設(shè)備等) 是一切建筑工程的物質(zhì)基礎(chǔ),建筑工程材料的質(zhì)量是工程質(zhì)量的基礎(chǔ),是提高工程質(zhì)量的重要保證,也是創(chuàng)造正常施工條件的前提。一般的建筑工程中材料費(fèi)用約占總項(xiàng)目費(fèi)用的60%左右,因此,建筑材料的質(zhì)量控制是保證建筑工程質(zhì)量的最關(guān)鍵的因素。只有有效的控制好建筑工程材料的質(zhì)量,整個(gè)建筑工程質(zhì)量才能得到基本保證。建筑材料的質(zhì)量控制存在于整個(gè)施工現(xiàn)場(chǎng)材料使用的全過(guò)程,從訂貨、加工、采購(gòu)、包裝、運(yùn)輸,一直到檢驗(yàn)、堆放、儲(chǔ)存、保管、加工,每一道程序都需要嚴(yán)格控制材料的質(zhì)量。

一、建筑材料質(zhì)量控制的原則

1、外觀質(zhì)量、復(fù)試報(bào)告均符合要求的原則

外觀質(zhì)量和復(fù)試報(bào)告應(yīng)符合相關(guān)規(guī)范標(biāo)準(zhǔn)要求,并與質(zhì)量保證資料內(nèi)容一致。如果外觀質(zhì)量和復(fù)試報(bào)告等其中之一不符合要求,說(shuō)明與質(zhì)量保證資料內(nèi)容不一致,質(zhì)量保證資料不真實(shí)。材料質(zhì)量保證資料是證明進(jìn)場(chǎng)材料質(zhì)量符合相關(guān)規(guī)范標(biāo)準(zhǔn)要求的有效文件。其內(nèi)容必須真實(shí)、齊全、完整,并符合相關(guān)規(guī)范標(biāo)準(zhǔn)要求。只有當(dāng)材料質(zhì)量保證資料、外觀質(zhì)量、復(fù)試報(bào)告全部符合要求,監(jiān)理工程師才能判定建筑材料質(zhì)量符合要求。

2、貫徹相關(guān)規(guī)范標(biāo)準(zhǔn)的原則

總體來(lái)說(shuō),我國(guó)建筑行業(yè)的相關(guān)規(guī)范標(biāo)準(zhǔn)還是比較齊全的,但現(xiàn)場(chǎng)施工人員對(duì)規(guī)范標(biāo)準(zhǔn)的熟悉理解和貫徹還很不夠,往往是一知半解,也沒(méi)按要求把相關(guān)規(guī)范標(biāo)準(zhǔn)配套使用。檢查控制建筑材料質(zhì)量的每個(gè)環(huán)節(jié)都要依據(jù)現(xiàn)行規(guī)范標(biāo)準(zhǔn)及相關(guān)規(guī)定要求,要做到“ 有據(jù)可依,執(zhí)行必嚴(yán)” 。作為監(jiān)理工程師必須熟悉相關(guān)規(guī)范內(nèi)容,熟練地運(yùn)用規(guī)范標(biāo)準(zhǔn),才能把好材料質(zhì)量控制關(guān)。

3、控制材料質(zhì)量的原則

進(jìn)入現(xiàn)場(chǎng)的工程所需材料的質(zhì)量檢查驗(yàn)收,必須嚴(yán)格按照材料監(jiān)理質(zhì)量控制程序執(zhí)行。在材料進(jìn)場(chǎng)前,承包商應(yīng)向監(jiān)理工程師提供供應(yīng)商的企業(yè)資料及材料樣品。監(jiān)理工程師可結(jié)合具體情況,到廠家進(jìn)行實(shí)地考察,以做好事前預(yù)控。當(dāng)材料進(jìn)場(chǎng)后,承包商應(yīng)在組織自檢合格的基礎(chǔ)上,才能進(jìn)行材料報(bào)驗(yàn)。收到材料報(bào)驗(yàn)申請(qǐng)后,監(jiān)理工程師首先要核查其質(zhì)量保證資料。在質(zhì)量保證資料齊全的基礎(chǔ)上,進(jìn)行外觀質(zhì)量檢驗(yàn)。外觀質(zhì)量檢驗(yàn)合格后,按規(guī)定需要復(fù)試的材料,必須嚴(yán)格執(zhí)行見(jiàn)證取樣制度,并按批量和規(guī)定的頻率進(jìn)行抽樣復(fù)試。材料復(fù)試合格,經(jīng)監(jiān)理工程師簽字確認(rèn)報(bào)審表后方能使用。

二、建筑材料中的質(zhì)量控制措施

1、建筑健全質(zhì)量保證體系,加強(qiáng)合同管理

由于現(xiàn)行的建筑市場(chǎng)管理混亂, 劣質(zhì)材料屢禁不止, 而造成的工程質(zhì)量事故和損失往往非常嚴(yán)重, 并且難以彌補(bǔ)和修復(fù), 因此工程中必須盡力避免發(fā)生此類問(wèn)題, 做到防患于未然。在材料的質(zhì)量監(jiān)管中, 首先應(yīng)該要求施工單位建立健全質(zhì)量保證體系,使施工企業(yè)在人員配備、組織管理、檢測(cè)程序、方法、手段等各個(gè)環(huán)節(jié)上加強(qiáng)管理。同時(shí),在施工承包合同中要明確對(duì)材料的質(zhì)量要求和技術(shù)標(biāo)準(zhǔn), 并明確建設(shè)要求。在項(xiàng)目實(shí)施過(guò)程中,嚴(yán)格按合同辦事,加強(qiáng)合同管理,以合同為依據(jù), 始終堅(jiān)持施工單位自檢和檢測(cè)單位復(fù)檢、建筑單位和監(jiān)理單位見(jiàn)證相結(jié)合的原則。這樣才可以防止將不合格的材料用于工程,保證建筑工程的質(zhì)量。

2、首先應(yīng)選擇具備豐富經(jīng)驗(yàn)的監(jiān)理工程

大多數(shù)工程建筑材料的檢測(cè)需要一段時(shí)間和一定的檢測(cè)手段, 而在施工現(xiàn)場(chǎng)大量合格材料中混有不合格材料時(shí), 監(jiān)理工程師對(duì)建筑材料的某種特性有直觀的判斷能力,以防止不合格材料用于工程建設(shè)。對(duì)于常用的工程建筑材料, 熟練準(zhǔn)確掌握其質(zhì)量性能指標(biāo)是很有必要的, 監(jiān)理工程師不僅應(yīng)該知道其指標(biāo)的高低, 還應(yīng)知道其具體涵義和作用。

3、制定嚴(yán)格的工程材料采購(gòu)、檢驗(yàn)程序

首先由承包商根據(jù)施工合同約定和施工設(shè)計(jì)圖紙要求,選取滿足工程質(zhì)量要求的材料樣品(至少三種以上),報(bào)項(xiàng)目管理機(jī)構(gòu)進(jìn)行現(xiàn)場(chǎng)簽字確認(rèn),現(xiàn)場(chǎng)確認(rèn)內(nèi)容包括:材料設(shè)備的名稱品牌、規(guī)格、型號(hào)、材質(zhì)要求、檔次、用量、價(jià)格、特殊技術(shù)要求及相關(guān)說(shuō)明,嚴(yán)格按照材料設(shè)備認(rèn)質(zhì)單要求填寫明確。其次認(rèn)質(zhì)單必須在承包商采購(gòu)實(shí)施前簽字確認(rèn),專業(yè)工程師、項(xiàng)目主管必須根據(jù)合同約定和設(shè)計(jì)施工圖紙要求共同認(rèn)可,并按制度要求報(bào)工程管理部門批準(zhǔn)。單一認(rèn)可、事后補(bǔ)辦及未經(jīng)批準(zhǔn)均不能作為結(jié)算依據(jù)。再次,制定嚴(yán)格的材料抽檢及送檢制度。材料抽檢要在專業(yè)工程師和項(xiàng)目主管見(jiàn)證下進(jìn)行取樣、封樣,并派員陪護(hù)送檢以防途中樣品被換掉。

4、檢查驗(yàn)收關(guān)。加強(qiáng)材料檢查驗(yàn)收,嚴(yán)把材料質(zhì)量關(guān)。

首先,掌握材料信息,優(yōu)選供貨廠家,用于工程的原材料、產(chǎn)品、構(gòu)配件、設(shè)備應(yīng)提供生產(chǎn)許可證、出廠合格證、技術(shù)說(shuō)明文件、檢驗(yàn)報(bào)告,有“準(zhǔn)用認(rèn)證”要求的材料和產(chǎn)品,還要提供省部級(jí)的準(zhǔn)用認(rèn)證許可文件。其次進(jìn)入現(xiàn)場(chǎng)的原材料、產(chǎn)品、構(gòu)配件、設(shè)備等由施工單位、專業(yè)工程師、項(xiàng)目主管進(jìn)行驗(yàn)收,簽署進(jìn)場(chǎng)驗(yàn)收意見(jiàn)。如發(fā)現(xiàn)承包商進(jìn)入現(xiàn)場(chǎng)的原材料與實(shí)際認(rèn)質(zhì)材料設(shè)備的名稱、品牌、規(guī)格、材質(zhì)要求等不符時(shí),應(yīng)及時(shí)書面承包商處理,并監(jiān)督承包商進(jìn)行限期更換,并對(duì)相關(guān)情況作書面記載直至作出相應(yīng)處罰。再次進(jìn)場(chǎng)驗(yàn)收合格的原材料、產(chǎn)品、構(gòu)配件設(shè)備,按見(jiàn)證取樣送檢有關(guān)要求進(jìn)行取樣復(fù)驗(yàn),復(fù)驗(yàn)合格后方可投入使用。材料堆放應(yīng)符合施工組織設(shè)計(jì)總平面布置圖的要求,按品種、規(guī)格、批次、進(jìn)場(chǎng)日期分別堆放,并注有醒目的標(biāo)牌區(qū)分。

三、建筑工程主要材料的質(zhì)量監(jiān)管措施

1、鋼筋原材料

在施工過(guò)程中, 針對(duì)原材料多源頭、多渠道的情況, 對(duì)進(jìn)場(chǎng)的每批金剛筋要求施工單位分批、分品種堆施、貯存, 并及時(shí)提供出廠合格證。在此基礎(chǔ)上, 對(duì)每批鋼筋均要做力學(xué)性能試驗(yàn), 特殊部位所有鋼筋要另做化學(xué)成分分析試驗(yàn), 并進(jìn)行現(xiàn)場(chǎng)監(jiān)督取樣。建設(shè)單位和監(jiān)理單位在施工中要隨時(shí)檢查產(chǎn)品合格證,出廠檢驗(yàn)報(bào)告和進(jìn)場(chǎng)復(fù)驗(yàn)報(bào)告。未經(jīng)檢驗(yàn)的材料,不允許用于工程,質(zhì)量達(dá)不到要求的材料,及時(shí)清退場(chǎng)外。

2、水泥

現(xiàn)在的建筑市場(chǎng)上小廠和小窯水泥很多, 因此施工單位在水泥進(jìn)場(chǎng)時(shí)應(yīng)對(duì)其品種、級(jí)別、包裝或散裝倉(cāng)號(hào)、出廠日期等進(jìn)行檢查,并及時(shí)到檢測(cè)單位對(duì)其強(qiáng)度、安定性和其他必要的性能指標(biāo)進(jìn)行復(fù)驗(yàn)。監(jiān)管單位如對(duì)使用中的水泥質(zhì)量有懷疑或水泥出廠超過(guò)三個(gè)月時(shí),應(yīng)進(jìn)行復(fù)驗(yàn),并按復(fù)驗(yàn)結(jié)果使用。未經(jīng)檢驗(yàn)的材料,不允許用于工程上,經(jīng)檢驗(yàn)不合格的, 應(yīng)及時(shí)清除現(xiàn)場(chǎng)。

3、鋼筋焊接樣品

現(xiàn)行的建筑工程設(shè)計(jì)主要以多層或高層為主,絕大多數(shù)進(jìn)場(chǎng)鋼筋均要進(jìn)行現(xiàn)場(chǎng)加工后才可用于工程,如鋼筋焊接、成型、張拉等。下面以鋼筋對(duì)焊為例談?wù)労附又破返馁|(zhì)量監(jiān)管。鋼筋只有經(jīng)驗(yàn)收合格后,施工單位方可進(jìn)行加工。在施工之前,要求施工單位提供其內(nèi)部質(zhì)量保證體系、技術(shù)措施交底、質(zhì)量監(jiān)控程序等,并要求施焊人員具有焊工上崗證, 拒絕無(wú)證人員上崗施焊。對(duì)有焊接操作上網(wǎng)證的人員, 要求對(duì)不同品種、不同焊接工藝的鋼筋接頭,先做焊接試件,試件經(jīng)檢驗(yàn)合格、方可施焊。對(duì)焊接成品的質(zhì)量檢查是監(jiān)管的工作重點(diǎn), 除施焊前對(duì)試件進(jìn)行合格試驗(yàn)之外,還要對(duì)成品的質(zhì)量進(jìn)行監(jiān)管。具體做法是:目測(cè)和檢測(cè)相結(jié)合, 首先從外觀上, 對(duì)軸線位移、彎折角度、裂紋凹坑、燒傷等進(jìn)行檢查,隨后作隨機(jī)抽樣,堅(jiān)持每300根接頭取一線樣品進(jìn)行試驗(yàn),并且始終堅(jiān)持抽測(cè)時(shí)間與材料加工進(jìn)度基本吻合,發(fā)現(xiàn)不合格焊接頭,分析原因,改進(jìn)技術(shù)措施, 然后重新焊接,使之全部達(dá)到規(guī)范、標(biāo)準(zhǔn)的要求, 并嚴(yán)格按《建筑安裝工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》、《混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》及各種管理?xiàng)l例進(jìn)行驗(yàn)收檢查。

4、混凝土

混凝土是工程中使用最為普遍加工材料, 它的質(zhì)量不僅涉及到各種原材料的質(zhì)量, 而且影響建筑物的工程質(zhì)量。影響混凝土質(zhì)量的因素很多,諸如各種組成材料的計(jì)量、配合比、攪拌、運(yùn)輸、振搗、養(yǎng)護(hù)等一系列環(huán)節(jié),均是影響混凝土質(zhì)量的重要因素。

綜上所述,建筑工程材料的質(zhì)量對(duì)建筑工程質(zhì)量具有直接重要的影響,是保證建筑物使用安全的先決條件,因此必須嚴(yán)格控制其質(zhì)量。完善材料的質(zhì)量保證體系,加強(qiáng)質(zhì)量的監(jiān)督管理,對(duì)材料質(zhì)量控制的各個(gè)環(huán)節(jié)進(jìn)行嚴(yán)格的把關(guān),才能確保工程材料的質(zhì)量,進(jìn)而更好地確保整個(gè)建筑工程的質(zhì)量。

參考文獻(xiàn):

[1] 呂光耀,葉桂蘭. 建筑材料的質(zhì)量管理與控制[J]. 中華建設(shè), 2007,(07) .

[2] 李仕斌. 淺談主要建筑材料的質(zhì)量管理與控制[J]. 中國(guó)建設(shè)信息, 2007,(21) .

[3] 劉艷,高乃坤,李季虹,陳光. 如何搞好主要建筑材料的質(zhì)量管理與控制[J]. 遼寧建材, 2006,(02) .

篇9

關(guān)鍵詞:施工階段,質(zhì)量控制。

中圖分類號(hào):TV523文獻(xiàn)標(biāo)識(shí)碼: A 文章編號(hào):

根據(jù)施工階段質(zhì)量控制模式可知,施工全過(guò)程可分為事前控制,事中控制和事后控制三個(gè)階段,監(jiān)理工程師在事前,事中,事后質(zhì)量控制中的主要內(nèi)容分述如下.

事前質(zhì)量控制內(nèi)容

掌握和熟悉質(zhì)量控制的技術(shù)依據(jù)。主要技術(shù)依據(jù)有:①設(shè)計(jì)圖紙及設(shè)計(jì)說(shuō)明書:②水利工程施工驗(yàn)收規(guī)范;③已批準(zhǔn)的設(shè)計(jì)圖紙和設(shè)計(jì)資料;④組織設(shè)計(jì)技術(shù)交底及圖紙會(huì)審;⑤合同文件中的質(zhì)量條款等。

施工現(xiàn)場(chǎng)的質(zhì)量檢驗(yàn),驗(yàn)收,包括:①現(xiàn)場(chǎng)障礙物的拆除,遷建及消除后的驗(yàn)收;現(xiàn)場(chǎng)定位曲軸線,高程標(biāo)樁的測(cè)設(shè),驗(yàn)收;③基準(zhǔn)點(diǎn),基準(zhǔn)線的復(fù)核,驗(yàn)收等。

施工隊(duì)伍的資質(zhì)審核。主要包括:①檢查工程技術(shù)負(fù)責(zé)人是否到位:②審查分包單位的資質(zhì)等級(jí)。

工程所需原材料,-構(gòu)配件及設(shè)備的質(zhì)量控制,包括:①審核工程所用原材料,構(gòu)配件,設(shè)備的出廠證明,技術(shù)合格證或質(zhì)量保證書;②某些工程材料(主要為裝飾材料),五金還需審查樣品后方可訂貨:③某些材料,制品使用前還需進(jìn)行抽檢,抽檢范圍根據(jù)工程性質(zhì)和質(zhì)量監(jiān)理要求確定;④凡采用新型制品,新材料,應(yīng)檢查技術(shù)簽訂文件;⑤以重要原材料,構(gòu)配件,設(shè)備的生產(chǎn)工藝,質(zhì)量控制措施和檢測(cè)手段應(yīng)實(shí)地考慮,設(shè)備必須在制造廠進(jìn)行質(zhì)量驗(yàn)收;⑥所有設(shè)備,在安裝前按相應(yīng)技術(shù)說(shuō)明書的要求進(jìn)行質(zhì)量檢查;⑦結(jié)構(gòu)構(gòu)件生產(chǎn)廠家,應(yīng)檢查其生產(chǎn)許可證,并生產(chǎn)工藝及質(zhì)量保證體系。

施工機(jī)械的質(zhì)量控制。①凡直接危及工程質(zhì)量的施工機(jī)械,如混凝土攪拌機(jī),振動(dòng)器等,應(yīng)按技術(shù)說(shuō)明書查驗(yàn)其響應(yīng)的技術(shù)性能,不符合要求的,不得在工程中使用;②施工中使用的衡器,量具,計(jì)量裝置應(yīng)有相應(yīng)的技術(shù)合格證,使用時(shí)應(yīng)完好并未超過(guò)他們的校驗(yàn)周期。

審查施工承包商提交的施工組織設(shè)計(jì)或施工方案。通過(guò)審查工作;①可保證工程質(zhì)量有可靠的技術(shù)和組織措施;②結(jié)合工程項(xiàng)目的具體情況,要求施工承包商編制重點(diǎn)分布,單元工程的施工工法文件,并應(yīng)對(duì)編就的工法文件進(jìn)行審核;③審核承包商提交針對(duì)當(dāng)前工程質(zhì)量通病指定的技術(shù)措施;④審核施工承包商為保證工程質(zhì)量而提交的質(zhì)量預(yù)控措施;⑤審核承包商提交的標(biāo)準(zhǔn)施工工藝流程圖。

改善生產(chǎn)環(huán)境,管理環(huán)境的措施。這些措施可以起到:①協(xié)助施工承包商完善質(zhì)量保證工作體系;②主動(dòng)同當(dāng)?shù)刭|(zhì)監(jiān)站聯(lián)系,回報(bào)在本項(xiàng)目開(kāi)展質(zhì)監(jiān)的具體辦法,爭(zhēng)取當(dāng)?shù)刭|(zhì)監(jiān)站的支持和幫助;③審核施工承包商關(guān)于材料,制品試件取樣及試驗(yàn)的方法或方案;④審核施工承包商指定的成品保護(hù)的措施,方法;⑤審查施工承包商試驗(yàn)室及工作人員的資質(zhì);⑥完善質(zhì)量報(bào)表,質(zhì)量事故的報(bào)告制度等。

把好開(kāi)工關(guān)。監(jiān)理工程師只有全面檢查施工準(zhǔn)備工作,并符合要求后才能頒布開(kāi)工令。

事中質(zhì)量控制內(nèi)容

施工工藝過(guò)程質(zhì)量控制。協(xié)助并督促施工承包商完善工作質(zhì)量控制,包括設(shè)立質(zhì)量控制點(diǎn),三檢制。

嚴(yán)格工序交接檢查檢驗(yàn)。未經(jīng)監(jiān)理工程師檢驗(yàn)并簽署合格意見(jiàn)的工序完工后。不得進(jìn)入下一道工序的施工。

隱蔽工程檢驗(yàn)。隱蔽工程完工后,先由施工承包商自檢初驗(yàn)合格后,填報(bào)隱蔽工程質(zhì)量報(bào)驗(yàn)通知單,報(bào)告監(jiān)理工程師檢查驗(yàn)收。

工程變更的處理。

行使質(zhì)量監(jiān)督權(quán),下達(dá)停工令。出現(xiàn)下這情況之一者,監(jiān)理工程師有權(quán)停工令:①未經(jīng)檢驗(yàn)即進(jìn)入下一道工序作業(yè)者:②擅自采用未經(jīng)認(rèn)可或批準(zhǔn)的材料者;③擅自將工程轉(zhuǎn)包;④擅自讓未經(jīng)同意的分包商進(jìn)場(chǎng)作業(yè)者;⑤沒(méi)有可靠的質(zhì)量保證措施冒然施工,已出現(xiàn)質(zhì)量下降征兆者;⑥工程質(zhì)量下降,經(jīng)指出后未采取有效改正措施,或采取了一定措施而效果不好,繼續(xù)作業(yè)者;⑦擅自變更設(shè)計(jì)圖紙要求者等。

負(fù)責(zé)質(zhì)量事故處理。包括:責(zé)令承包商分析質(zhì)量事故原因,并認(rèn)定質(zhì)量事故責(zé)任;②商定質(zhì)量事故處理措施;③批準(zhǔn)處理工程質(zhì)量事故的技術(shù)措施和方案;④檢查質(zhì)量事故處理效果。

嚴(yán)格執(zhí)行單位(單元)工程開(kāi)工報(bào)告和停工后的復(fù)工報(bào)告審批制度。

負(fù)責(zé)質(zhì)量,技術(shù)簽證。凡質(zhì)量,技術(shù)問(wèn)題方面有法律效力的最后簽證,只能有監(jiān)理工程師簽署。

行駛好質(zhì)量否則決權(quán),位工程進(jìn)度款的支付簽署質(zhì)量認(rèn)證意見(jiàn)。

建立質(zhì)量監(jiān)理日志。應(yīng)逐日記錄有關(guān)工程質(zhì)量動(dòng)態(tài)及影響因素的分析。

組織現(xiàn)場(chǎng)質(zhì)量協(xié)調(diào)會(huì),及時(shí)分析,通報(bào)有關(guān)動(dòng)態(tài)。

事后質(zhì)量控制內(nèi)容

審核竣工資料。

審核施工承包商提供的質(zhì)量檢驗(yàn)報(bào)告及有關(guān)技術(shù)性文件。

整理有關(guān)工程項(xiàng)目質(zhì)量的技術(shù)文件,并編目,建檔。

篇10

關(guān)鍵詞:水利工程 施工質(zhì)量控制 影響因素 措施

水利工程建設(shè)一般都要經(jīng)過(guò)勘測(cè)、規(guī)劃、設(shè)計(jì)和施工四個(gè)階段。水利工程的施工應(yīng)以勘測(cè)、規(guī)劃和設(shè)計(jì)的成果為依據(jù),將規(guī)劃和設(shè)計(jì)的圖紙轉(zhuǎn)化為工程實(shí)體。水利工程施工質(zhì)量好壞,不僅對(duì)工程本身有極大影響,而且一但出現(xiàn)問(wèn)題,往往會(huì)危及國(guó)家和人民群眾的生命、財(cái)產(chǎn)安全,因此,施工階段的質(zhì)量控制就顯得極為重要。

1、必須明確水利工程質(zhì)量檢測(cè)的必要性和重要性

水利工程質(zhì)量檢測(cè)是質(zhì)量管理工作科學(xué)化的基本要素,是提高監(jiān)督水平必不可少的條件,尤其在市場(chǎng)經(jīng)濟(jì)迅猛發(fā)展的今天,必須首要完善檢測(cè)手段,保證其科學(xué)性、公正性、準(zhǔn)確性??茖W(xué)性是檢測(cè)工作的基礎(chǔ),離開(kāi)它就談不上對(duì)工程質(zhì)量評(píng)價(jià)和負(fù)責(zé),也難以保證所建設(shè)的水利工程的正常運(yùn)用與運(yùn)行安全。若以檢測(cè)工作賴以生存的地位來(lái)估價(jià),公正性是檢測(cè)工作的準(zhǔn)繩和法規(guī),否則就會(huì)失去法律效力。準(zhǔn)確性則是科學(xué)性與公正性的先決條件,是檢測(cè)工作客觀評(píng)價(jià)與社會(huì)信譽(yù)的前提。

2、影響水利工程施工質(zhì)量的主要因素

各項(xiàng)水利工程,無(wú)論是水庫(kù)、大壩、電站、水閘,還是防洪大堤,除險(xiǎn)加固工程都是遵循“百年大計(jì),質(zhì)量第一”。

2.1 人員

參與工程建設(shè)的各方,包括建設(shè)單位、設(shè)計(jì)單位、監(jiān)理單位、施工單位及有關(guān)的水利管理部門、上級(jí)審批部門等。提高工程質(zhì)量的關(guān)鍵在于提高人的素質(zhì),包括人的政治思想水平、質(zhì)量意識(shí)水平等。

2.2 材料

水利工程所涉及的原材料,中間產(chǎn)品較多,且具有特殊性,對(duì)原材料管理從以下幾方面控制:材料采購(gòu)關(guān),建立檢驗(yàn)制度,領(lǐng)用制度,嚴(yán)把質(zhì)量關(guān),對(duì)剩余材料和管理與回收等。

2.3 機(jī)械

參與水利工程的施工機(jī)械設(shè)備多種多樣,設(shè)備的操作與使用對(duì)施工質(zhì)量有著直接的影響。所以在施工機(jī)械設(shè)備選型時(shí),應(yīng)注意經(jīng)濟(jì)上的合理性、技術(shù)上的先進(jìn)性、操作和維護(hù)上的方便性等。

2.4 方案

工程施工方案和施工工藝的好壞決定著工程的質(zhì)量與進(jìn)度。在制定施工方案和施工工藝時(shí),必須結(jié)合技術(shù)、組織、管理、經(jīng)濟(jì)等方面進(jìn)行綜合分析,以確定施工方案在技術(shù)上可行,經(jīng)濟(jì)上合理,有利于提高工程質(zhì)量。

3、對(duì)工程質(zhì)量管理的幾點(diǎn)看法

3.1 抓好施工質(zhì)量監(jiān)督

施工質(zhì)量控制主要為施工現(xiàn)場(chǎng)的質(zhì)量監(jiān)控。在施工過(guò)程中應(yīng)做到:

(1) 施工單位要建立完善的工序質(zhì)量控制體系,及時(shí)提交質(zhì)量統(tǒng)計(jì)分析資料和質(zhì)量控制圖表。

(2)及時(shí)審核變更設(shè)計(jì)及其修改的圖紙。

(3)對(duì)施工作業(yè)進(jìn)行嚴(yán)格的監(jiān)督和檢查,發(fā)現(xiàn)違規(guī)行為及時(shí)糾正。

(4)要建立質(zhì)量信息反饋體系。

3.2 要處理好監(jiān)理工程師的質(zhì)量控制體系與施工單位的質(zhì)量保證體系之間的關(guān)系

總的說(shuō)來(lái),監(jiān)理工程師的質(zhì)量控制體系是建立在施工承包商的質(zhì)量保證體系上的。后者是基礎(chǔ),沒(méi)有一個(gè)健全的、運(yùn)轉(zhuǎn)良好的施工質(zhì)量保證體系,監(jiān)理工程師很難有所作為。因此,監(jiān)理工程師質(zhì)量控制的首要任務(wù)就是在開(kāi)工令之前,檢查施工承包商是否有一個(gè)健全的質(zhì)量保證體系,沒(méi)有肯定答復(fù),不簽發(fā)開(kāi)工令。

3.3 嚴(yán)禁轉(zhuǎn)包

主體工程不能分包;對(duì)分包資質(zhì)要嚴(yán)加審查,不允許多次分包。項(xiàng)目部是獨(dú)立性很強(qiáng)的經(jīng)濟(jì)、技術(shù)實(shí)體,是對(duì)質(zhì)量起保證作用的關(guān)鍵所在。一旦轉(zhuǎn)包或多次分包,連責(zé)任都不明確了,從合同法來(lái)講是企業(yè)法人負(fù)責(zé),而在實(shí)際運(yùn)作中,是無(wú)人負(fù)責(zé)。

3.4 正確處理業(yè)主、監(jiān)理、施工三方的關(guān)系及地方政府有關(guān)部門的關(guān)系

在建設(shè)管理中執(zhí)行業(yè)主制、監(jiān)理制和招投標(biāo)制,是一個(gè)巨大的進(jìn)步。三方都有一個(gè)觀念轉(zhuǎn)變的過(guò)程。各自找準(zhǔn)自己的位置是最重要的。對(duì)號(hào)入座、進(jìn)入角度之后,三方的關(guān)系就易于處理好。不是上下級(jí)關(guān)系,也不是對(duì)立關(guān)系,而是合同雙方平等互利關(guān)系。

4、必須科學(xué)實(shí)施水利工程質(zhì)量檢測(cè)工作

水利工程質(zhì)量檢測(cè)是一項(xiàng)科學(xué)、嚴(yán)密、重要的工作,必須要有規(guī)范的程序和嚴(yán)謹(jǐn)?shù)膽B(tài)度。在質(zhì)量檢測(cè)的實(shí)踐中,應(yīng)重點(diǎn)注重以下幾個(gè)方面:

(1)建立健全工作制度。嚴(yán)密的規(guī)章制度、科學(xué)認(rèn)真的態(tài)度是搞好工程質(zhì)量檢測(cè)工作的保證。工程質(zhì)量檢測(cè)項(xiàng)目,需要專業(yè)試驗(yàn)室組織優(yōu)秀檢測(cè)人員并設(shè)專門的質(zhì)量負(fù)責(zé)人,才能使質(zhì)量檢測(cè)工作的權(quán)威性得到有力的保證。

(2)嚴(yán)格執(zhí)行國(guó)家規(guī)范。國(guó)家標(biāo)準(zhǔn)和部頒規(guī)程規(guī)范、技術(shù)質(zhì)量標(biāo)準(zhǔn)、批準(zhǔn)的設(shè)計(jì)文件是檢測(cè)工作的依據(jù)。有了這些規(guī)范、規(guī)程、標(biāo)準(zhǔn)和文件,才能使檢測(cè)工作的實(shí)施、數(shù)據(jù)分析和結(jié)論有據(jù)可依。另外,在檢測(cè)前或檢測(cè)過(guò)程中,收集被檢工程的相關(guān)資料對(duì)檢測(cè)的數(shù)據(jù)分析和結(jié)論是有用的和必要的。

(3)提高檢測(cè)人員的專業(yè)水平。高素質(zhì)的檢測(cè)人員和先進(jìn)的檢測(cè)設(shè)備是保證檢測(cè)成果質(zhì)量的重要因素。檢測(cè)人員應(yīng)具有豐富的水利水電工程建設(shè)經(jīng)驗(yàn),最好還直接參加過(guò)工程的設(shè)計(jì)、施工、監(jiān)理、檢測(cè)等方面的工作,才能保證檢測(cè)過(guò)程中的質(zhì)量。在檢測(cè)設(shè)備上,所有儀器設(shè)備都必須經(jīng)過(guò)有關(guān)部門的計(jì)量認(rèn)證,這些先進(jìn)的儀器才能夠保證檢測(cè)數(shù)據(jù)的準(zhǔn)確性和可靠性。

(4)確保檢測(cè)費(fèi)用。檢測(cè)費(fèi)用的專項(xiàng)列支是檢測(cè)結(jié)果真實(shí)性和公正性的有力支持。在實(shí)際工作中,批復(fù)概算并沒(méi)有該項(xiàng)費(fèi)用開(kāi)列,有的不得不擠占其他費(fèi)用,使這項(xiàng)工作很難開(kāi)展,即使開(kāi)展了,檢測(cè)結(jié)果的真實(shí)性和公正性也很難保證。

5、結(jié)語(yǔ)

水利工程質(zhì)量包括“安全、適用、經(jīng)濟(jì)、美觀”四個(gè)方面,只有四全優(yōu),才是真正的優(yōu)質(zhì)工程。水利工程須從項(xiàng)目的論證、設(shè)計(jì)、建設(shè)、監(jiān)理、管理等環(huán)節(jié)抓起,做好質(zhì)量全程監(jiān)控工作?;鶎铀块T多數(shù)集監(jiān)督、設(shè)計(jì)、監(jiān)理、施工等職能于一體,應(yīng)注重開(kāi)發(fā)人力資源、加強(qiáng)質(zhì)量教育、提高檢測(cè)水平、搞好建后管護(hù)等,建立起適合自身情況的質(zhì)量保證體系。