頂管安全監(jiān)理實(shí)施細(xì)則范文
時(shí)間:2023-10-23 17:25:11
導(dǎo)語(yǔ):如何才能寫好一篇頂管安全監(jiān)理實(shí)施細(xì)則,這就需要搜集整理更多的資料和文獻(xiàn),歡迎閱讀由公務(wù)員之家整理的十篇范文,供你借鑒。
篇1
關(guān)鍵詞:市政排水工程;頂管施工工藝;控制精度高
Abstract: in the municipal water supply and drainage engineering construction, the pipe jacking construction process has not ground excavation does not involve demolition, not destroy the ground buildings, do not affect traffic, construction against climate and environment influence, not influence the pipe section poor and deformation; Save time, high efficiency, environmental protection, safety, comprehensive cost is low, the control precision higher many other advantages, is worth popularizing widely.
Keywords: municipal drainage engineering; Pipe jacking construction technology; High control accuracy
中圖分類號(hào)TU992 文獻(xiàn)標(biāo)識(shí)碼B
編號(hào)T1612-03(01)-1612
隨著我國(guó)政府對(duì)環(huán)境保護(hù)的重視程度日益加大,近幾年來(lái),各大中型城市在城市建設(shè)大規(guī)模發(fā)展的同時(shí)都致力對(duì)城區(qū)水污染的治理和水資源的保護(hù),采取的幾乎一樣的方法截污治污,在城市周邊興建污水處理廠,但隨之而來(lái)的困難是收集污水均需經(jīng)過(guò)人口稠密區(qū)或大型建筑物、構(gòu)筑物及支流小河等,所以頂管這一非開挖技術(shù)成為首選。由于非開挖頂管施工采用油壓驅(qū)動(dòng),施工時(shí)噪音遠(yuǎn)遠(yuǎn)小于開槽式敷設(shè)管道,且?guī)缀鯖](méi)有地表沉降的現(xiàn)象,能對(duì)周圍環(huán)境的影響降低到最小程度,且滿足城市內(nèi)管線施工的各項(xiàng)限制條件。
1工程概況
(1)本工程地處老城區(qū)交通主干道,為雙向四車道,車流量較大,地質(zhì)情況復(fù)雜,沿線地下管線眾多,且因年代久遠(yuǎn),已掌握的市政管線圖不能真實(shí)反映管線布設(shè)及走向。頂管施工采取封擋半側(cè)道路,為方便大型車輛會(huì)車順利通過(guò),啟出另一側(cè)人行道道板及路牙,做成臨時(shí)便道。施工場(chǎng)地狹小,環(huán)境保護(hù)要求很高。頂管長(zhǎng)度1020m,選用DN800C40混凝土管,頂管推進(jìn)坡度2.5‰,平均覆土厚度3.5m。
(2)該工程污水管道在地貌上穿越兩個(gè)地貌單元,地形總體呈北高南低之勢(shì),分別為長(zhǎng)江漫灘和崗地前緣地貌單元,局部存在不均勻強(qiáng)風(fēng)化粉砂巖,地質(zhì)層突變性較大。地下水主要受大氣降水、溝水入滲補(bǔ)給,徑流緩慢,排泄方式為自然蒸發(fā)。水位隨季節(jié)變化,年平均一般在0.8~1.8m之間,地下水對(duì)混凝土無(wú)腐蝕性。頂管穿越②-1、②-2粉質(zhì)粘土層,局部雜填土、塊石、砂、礦渣回填層或強(qiáng)風(fēng)化粉砂巖。兩側(cè)沿線的地下管線有各時(shí)代敷設(shè)的煤氣、給水、雨水、污水、電力電纜(含地鐵專用、軍事專用)及通信電纜等各型管線,且存在個(gè)別已廢棄管線。
2主要施工程序及技術(shù)難點(diǎn)
2.1施工程序
地面準(zhǔn)備工作頂管機(jī)就位調(diào)試頂管機(jī)出洞正常段頂進(jìn)施工過(guò)程中注漿頂管機(jī)進(jìn)洞頂管機(jī)進(jìn)洞后施工。
2.2技術(shù)難點(diǎn)
管材進(jìn)場(chǎng)驗(yàn)收,小型吊運(yùn)機(jī)械、頂管機(jī)進(jìn)場(chǎng)吊裝就位、調(diào)試,頂管機(jī)出洞段控制,頂管過(guò)程中軸線控制,管內(nèi)塌方段處理及中軸線、標(biāo)高控制,頂管機(jī)進(jìn)洞、進(jìn)洞后的工作。
3監(jiān)理工作實(shí)踐
3.1做好認(rèn)真細(xì)致的準(zhǔn)備工作
施工前,請(qǐng)?jiān)O(shè)計(jì)和施工方進(jìn)行設(shè)計(jì)思路、施工方案與工藝、安全與文明施工交底,并與施工單位進(jìn)行技術(shù)交流;編寫監(jiān)理實(shí)施細(xì)則,認(rèn)真審核施工方案,尤其是中繼環(huán)的設(shè)置、壓漿孔的布置、穩(wěn)定土層的措施等具體方案;對(duì)施工人員進(jìn)
行書面的技術(shù)和安全交底,從而保證全體監(jiān)理和施工人員對(duì)即將實(shí)施的施工過(guò)程、控制方法、塌方事故處理及安全應(yīng)急響應(yīng)等方面做到心中有數(shù)。
3.2監(jiān)測(cè)方案的編制與實(shí)施
由于該路段沿線管線情況復(fù)雜,依據(jù)合同及施工方案的要求,選擇了第三方作為本工程的監(jiān)測(cè)單位。在工程實(shí)施前,要求制定詳細(xì)的監(jiān)測(cè)方案。通過(guò)設(shè)置地表沉降監(jiān)測(cè)點(diǎn)來(lái)間接反映原路面下重要管線沉降情況。根據(jù)監(jiān)測(cè)方案要求,從始
發(fā)點(diǎn)出發(fā),沿推進(jìn)軸線每間隔25m設(shè)置一排地表沉降監(jiān)測(cè)點(diǎn),每排設(shè)三個(gè),點(diǎn)與點(diǎn)相距5m。對(duì)平行于頂管軸線的原地面下DNl200給水管、DN600煤氣管、地鐵動(dòng)力電纜溝、斜交軸線的DN500雨水管,增設(shè)觀測(cè)點(diǎn)。同時(shí)要求施工單位在頂管施工期間,每天不少于兩次對(duì)所有觀測(cè)點(diǎn)進(jìn)行監(jiān)測(cè)。在機(jī)頭逼近重要管線時(shí),增加監(jiān)測(cè)密度,直到機(jī)頭遠(yuǎn)離管線且沉降值穩(wěn)定后再行恢復(fù)。由于各參建單位都對(duì)監(jiān)測(cè)工作比較重視,整個(gè)過(guò)程、重要部位的沉降值都控制在設(shè)定范圍以內(nèi)。
3.3做好測(cè)量放樣的監(jiān)理復(fù)測(cè)工作
要求施工單位在測(cè)量放樣過(guò)程中保證精度,復(fù)測(cè)控制樁時(shí),采用三測(cè)回制。
1)地面測(cè)量。對(duì)建設(shè)方提供的標(biāo)準(zhǔn)點(diǎn)的坐標(biāo)及高程進(jìn)行復(fù)核,采用全站儀按設(shè)計(jì)要求放出頂管軸線,在地面設(shè)控制樁,通過(guò)空導(dǎo)點(diǎn)用全站儀放出。在頂管施工期間必須對(duì)控制點(diǎn)進(jìn)行復(fù)測(cè),每頂50cm對(duì)控制樁復(fù)測(cè)一次,軸線測(cè)量?jī)x器點(diǎn)
每班都需校準(zhǔn)。監(jiān)理在復(fù)測(cè)過(guò)程中記錄數(shù)據(jù)隨時(shí)與施工方數(shù)據(jù)進(jìn)行比對(duì),誤差在允許范圍內(nèi)即不予調(diào)整,如出現(xiàn)數(shù)據(jù)誤差較大,確認(rèn)原因后及時(shí)調(diào)整。
2)井內(nèi)測(cè)量。通過(guò)控制樁用儀器定出井下管道頂進(jìn)軸線測(cè)量?jī)x器的位置;同時(shí)在測(cè)量?jī)x器的對(duì)面井沿口與井壁上分別設(shè)置測(cè)量?jī)x器的復(fù)測(cè)校核點(diǎn)與線,以便在管道頂進(jìn)軸線測(cè)量過(guò)程中對(duì)儀器自身位置的位移監(jiān)察。
3)管道頂進(jìn)軸線測(cè)量:在井內(nèi)設(shè)固定的測(cè)站,根據(jù)設(shè)計(jì)坡度,經(jīng)緯儀調(diào)好垂直角度,每頂進(jìn)0.5m測(cè)量1次,并記錄每節(jié)管子兩次,頂進(jìn)軸線與設(shè)計(jì)軸線一旦發(fā)生偏差,要及時(shí)采取糾偏糾正措施,減少頂進(jìn)軸線與設(shè)計(jì)軸線的偏差數(shù)值。在出洞、進(jìn)洞及糾偏過(guò)程中,增加測(cè)量頻率。監(jiān)理在復(fù)測(cè)過(guò)程中檢查施工單位的頂管測(cè)量數(shù)據(jù)記錄,每天抽測(cè)進(jìn)行復(fù)核,如發(fā)生地質(zhì)情況突變的情況,可隨時(shí)調(diào)整抽測(cè)頻率,及時(shí)指導(dǎo)施工工人進(jìn)行糾偏。
3.4頂管設(shè)備安裝及調(diào)試
頂管設(shè)備在安裝前必須先進(jìn)行調(diào)試及保養(yǎng),以確保設(shè)備的完好性,檢查進(jìn)場(chǎng)的機(jī)頭直徑、糾偏設(shè)備、出土裝置、油壓動(dòng)力是否匹配,機(jī)頭與工具管的聯(lián)接是否滿足糾偏的技術(shù)要求,有無(wú)滲漏,如對(duì)進(jìn)場(chǎng)設(shè)備存在疑慮,可進(jìn)行模擬操作,確保全套設(shè)備能夠正常工作后方可使用。工作井墊層及后背都鋪設(shè)澆筑完成后,開始進(jìn)行導(dǎo)軌、頂背鋼板、液壓油缸等設(shè)備的安裝。導(dǎo)軌安裝時(shí)須墊實(shí),安裝牢固,以避免在頂進(jìn)時(shí)因松動(dòng)而影響頂進(jìn)的軸線和高程。導(dǎo)軌安裝同時(shí),必須配全其它設(shè)備尺寸.確定導(dǎo)軌安裝的高程和軸線,以保證導(dǎo)軌安裝的誤差在允許范圍內(nèi),這是管道頂進(jìn)后管道軸線及高程準(zhǔn)確性的前提條件。頂背鋼板、油缸等設(shè)備的安裝也應(yīng)做到準(zhǔn)確牢固,在主頂定位時(shí),要求與管節(jié)中心軸線形成對(duì)稱分布,以保證管節(jié)均勻受力。頂背鋼板的平面應(yīng)垂直與頂進(jìn)軸線,在測(cè)量的監(jiān)測(cè)下,精確它們的位置及坡度,直至滿足要求為止。頂進(jìn)軸線偏差控制:高程+300,-400;水平±100。主頂定位后,需進(jìn)行調(diào)試與驗(yàn)收,出洞前對(duì)機(jī)械進(jìn)行反復(fù)調(diào)試,保證每個(gè)千斤頂?shù)男阅芡旰?,使頂管機(jī)在工作中能始終保持最佳狀態(tài)。調(diào)試與驗(yàn)收工作,由專業(yè)單位實(shí)施,監(jiān)理對(duì)其試驗(yàn)與驗(yàn)收過(guò)程做好相應(yīng)記錄。
3.5施工控制
全部設(shè)備安裝好以后開始頂進(jìn),采用人工挖掘出土。人工在工作面進(jìn)行挖土,挖出的土裝到土斗小車?yán)?,再拉出管道,然后吊至地面裝車運(yùn)走,應(yīng)做好每節(jié)管出土量統(tǒng)計(jì),嚴(yán)格控制出土量,防止欠挖或超挖,通過(guò)各方相互配合及嚴(yán)格把
關(guān),有效地控制了地面沉降。管節(jié)相接時(shí),應(yīng)提前清掃管內(nèi)雜物,確保管口完好無(wú)損,無(wú)銹無(wú)污,兩管口直縫間距≥100,錯(cuò)口校正要求≤1.6,沿周長(zhǎng)用錘擊校正好。頂管用鋼筋混凝土管鋼套環(huán)外防腐已由管材生產(chǎn)廠家做好.內(nèi)防腐待管道全部頂完后一次性完成。管節(jié)聯(lián)接前先套好契形橡膠圈,橡膠圈材料為氯丁橡膠,接頭處強(qiáng)度必須>10MPa,接頭平整光滑,無(wú)痕跡,不允許有裂口。在頂進(jìn)過(guò)程中由于受不均勻外力的作用,頭部會(huì)偏離設(shè)計(jì)軸線及標(biāo)高,因此需要不斷地對(duì)工具頭進(jìn)行糾偏操作,密切注意對(duì)頂進(jìn)軸線的控制,每節(jié)頂進(jìn)結(jié)束后,都要對(duì)機(jī)頭狀態(tài)進(jìn)行測(cè)量,以便能隨偏隨糾,糾偏角度一般宜≯0.5°,如出現(xiàn)較大的偏差,應(yīng)小角度連續(xù)糾偏,保持適當(dāng)?shù)那拾霃椒祷氐捷S線上來(lái),以避免管道頂進(jìn)時(shí)產(chǎn)生過(guò)大的側(cè)應(yīng)力。為使頂進(jìn)過(guò)程保持連續(xù)均衡施工,監(jiān)理24h值班,記錄每天的頂進(jìn)速度,防止出現(xiàn)長(zhǎng)時(shí)間擱置情況,并與施工管理人員密切配合,根據(jù)監(jiān)測(cè)數(shù)據(jù)進(jìn)行土壓力設(shè)定值的調(diào)整,使頂進(jìn)過(guò)程始終保持最佳狀態(tài),在此建議井下測(cè)量配置使用激光經(jīng)緯儀,能滿足長(zhǎng)距離頂管的測(cè)量精度,減小誤差。
3.6注漿
為減少土體與管道間的摩阻力,同時(shí)考慮到城市環(huán)境保護(hù)的重要性,綜合各方意見,在頂進(jìn)洞內(nèi)的所有混凝土管壁外側(cè)均涂刷蠟層,形成蠟套,以達(dá)到減摩效果;當(dāng)頂管長(zhǎng)度達(dá)到60m以上或頂進(jìn)阻力太大時(shí)需及時(shí)考慮注漿,每4節(jié)管節(jié)安置一節(jié)有壓漿孔的管節(jié),通過(guò)管節(jié)上的壓漿孔,向管道外壁注入一定量的觸變泥漿,在管道形成一個(gè)泥漿環(huán)套,減小管節(jié)外壁和土層間的摩擦力,從而減小頂進(jìn)時(shí)的頂力。
4監(jiān)理工作體會(huì)
4.1預(yù)控工作是項(xiàng)目順利展開的基礎(chǔ)
項(xiàng)目監(jiān)理部對(duì)該項(xiàng)目高度重視。在施工前,對(duì)施工設(shè)計(jì)及施工工藝進(jìn)行充分了解,制定監(jiān)理實(shí)施細(xì)則,對(duì)施工環(huán)節(jié)進(jìn)行分解,落實(shí)監(jiān)理工作崗位和工作職責(zé)。針對(duì)工程特點(diǎn),項(xiàng)目監(jiān)理部對(duì)施工方案進(jìn)行反復(fù)討論,在認(rèn)真審核施工方案的基礎(chǔ)上,提出監(jiān)理工作要求,并在實(shí)施過(guò)程中不斷予以補(bǔ)充完善。每道工序開工前或新隊(duì)伍進(jìn)場(chǎng)后,監(jiān)理都組織數(shù)次技術(shù)、安全工作交底會(huì)議,將施工中應(yīng)注意的問(wèn)題、可能發(fā)生的情況及應(yīng)采取的措施,進(jìn)行書面交底,使所有參建人員都能做
到心中有數(shù)。在實(shí)施過(guò)程中,對(duì)可預(yù)見的問(wèn)題,及時(shí)召開專題討論會(huì),進(jìn)行分析、交底。在下道工序開始前,明確應(yīng)做的工作和預(yù)防措施。
4.2嚴(yán)格要求,加強(qiáng)檢查,杜絕隱患
頂管施工過(guò)程中,監(jiān)理人員崗位明確,對(duì)重要工序、重要節(jié)點(diǎn)。項(xiàng)目監(jiān)理部都事先做好交底布置,工過(guò)程中進(jìn)行跟蹤檢驗(yàn)、檢測(cè),對(duì)現(xiàn)場(chǎng)發(fā)現(xiàn)的不符合要求和應(yīng)予整改完善之處,積極采取應(yīng)對(duì)措施。要求巡視監(jiān)理人員發(fā)現(xiàn)問(wèn)題后及時(shí)向總監(jiān)匯報(bào),必要時(shí)向建設(shè)方業(yè)主代表匯報(bào),并按公司要求簽發(fā)相應(yīng)報(bào)表,將出現(xiàn)的安全隱患逐一列出并督促施工方整改,盡可能避免監(jiān)理需承擔(dān)的安全責(zé)任。除每天安排統(tǒng)計(jì)監(jiān)測(cè)報(bào)表外,還組織當(dāng)班人員,對(duì)報(bào)表數(shù)據(jù)進(jìn)行分析,及時(shí)告知施工現(xiàn)場(chǎng)人員,討論應(yīng)對(duì)措施,并要求每天將監(jiān)測(cè)數(shù)據(jù)和現(xiàn)場(chǎng)施工情況、下道工序應(yīng)注意的要點(diǎn)寫入日記,做到班班有交接,人人都清楚每天的工作內(nèi)容和關(guān)注的重點(diǎn),有效地杜絕了施工中質(zhì)量與安全隱患,使整個(gè)工程始終處于受控之中。
4.3頂管過(guò)程中涉及到的安全防范工作
1)工作坑的平面位置應(yīng)避免設(shè)置在高壓電線下,工作坑的施工機(jī)械設(shè)備或腳手架等裝置,及其與架空輸電線路之間的最小距離應(yīng)滿足有關(guān)電業(yè)規(guī)定。
2)采用鋼板或沉井法施工的工作坑,地面沉陷的影響范圍,一般可按基礎(chǔ)深度的1.5倍考慮,否則應(yīng)采用技術(shù)保護(hù)措施。
3)吊運(yùn)機(jī)械的保險(xiǎn)、限位、保護(hù)、指示器等必須齊全可靠,駕駛、指揮人員必須持有效證件上崗,人員到位后方可按規(guī)定要求進(jìn)行吊運(yùn)管材操作,吊運(yùn)前仔細(xì)檢查鋼絲繩,斷絲超過(guò)10絲的必須更換。
4)按照市政工程要求張掛標(biāo)識(shí)圖及標(biāo)識(shí)牌,使用市政工程標(biāo)準(zhǔn)圍擋護(hù)欄,在工作井周圍架設(shè)安全圍欄,夜間標(biāo)準(zhǔn)護(hù)欄上紅燈及燈箱應(yīng)保證明亮。
5)圍擋內(nèi)電纜線應(yīng)絕緣良好,不得有接頭,不得亂拖亂拉。焊、割作業(yè)與氧氣、乙炔瓶等危險(xiǎn)物品的距離不得少于10mm。
6)在工具管處放置應(yīng)急照明燈,保證斷電或停電時(shí)管道內(nèi)的工作人員能順利撤出。
7)因地處人口稠密區(qū),施工圍擋護(hù)欄應(yīng)做到封閉施工,對(duì)圍觀市民做好溝通工作,好言勸其遠(yuǎn)離施工區(qū)域,施工圍擋內(nèi)外應(yīng)及時(shí)清潔,利用晚間進(jìn)行出土,出土后隨即清理現(xiàn)場(chǎng),保證市容市貌。
5小結(jié)
篇2
【關(guān)鍵詞】建筑暖通工程;施工管理;質(zhì)量控制
暖通工程是整個(gè)建筑行業(yè)的重要一部分, 暖通工程施工的質(zhì)量也在很大程度上影響居民的日常生活。人們也對(duì)暖通工程施工質(zhì)量提出了更高的要求,加強(qiáng)暖通工程施工質(zhì)量的管理控制勢(shì)在必行。因此要求暖通工程需要根據(jù)建筑工程的實(shí)際情況進(jìn)行科學(xué)的設(shè)計(jì)和部署,做好工程施工的事前、事后管理和過(guò)程控制,保證暖通工程的質(zhì)量。
1 建筑暖通工程施工準(zhǔn)備階段的管理
1.1 熟悉相關(guān)法律法規(guī),了解監(jiān)理合同、施工合同的相關(guān)內(nèi)容
暖通監(jiān)理工程師應(yīng)熟悉相關(guān)法律法規(guī),了解監(jiān)理合同和施工合同的主要內(nèi)容。針對(duì)所監(jiān)理工程的實(shí)際情況,制定詳細(xì)的監(jiān)理規(guī)劃和監(jiān)理實(shí)施細(xì)則,監(jiān)理工程師的工作重點(diǎn)是事前控制,在制訂監(jiān)理規(guī)劃和監(jiān)理實(shí)施細(xì)則時(shí),監(jiān)理人員應(yīng)針對(duì)所監(jiān)理工程項(xiàng)目的具體情況,綜合考慮工程的特點(diǎn),找出質(zhì)量控制的重點(diǎn),提出明確的質(zhì)量控制目標(biāo)。建立健全的監(jiān)理組織,熟悉專業(yè)施工圖紙,了解相關(guān)的技術(shù)規(guī)范要求,主持本專業(yè)的圖紙會(huì)審,參與施工圖紙?jiān)O(shè)計(jì)技術(shù)交底。
1.2 圖紙會(huì)審管理
在暖通工程施工前首先要對(duì)設(shè)計(jì)圖紙進(jìn)行嚴(yán)格的審核, 找出圖紙中的錯(cuò)誤以及有疑點(diǎn)之處, 對(duì)工程中涉及到的施工材料和施工工藝要進(jìn)行核定, 尤其是各種新型建材、新工藝必須要經(jīng)過(guò)充分的計(jì)算、論證來(lái)做技術(shù)評(píng)定,確保新材料、新工藝可以滿足工程的設(shè)計(jì)要求,另外,還要對(duì)設(shè)計(jì)圖紙的空間布局進(jìn)行審核, 一是要看暖通工程設(shè)備安裝時(shí)是否能夠有足夠的施工空間,如果不滿足要求就要對(duì)圖紙進(jìn)行修改,而是要看設(shè)備及附屬設(shè)施的布局是否科學(xué)、合理, 如不滿足要求就要重新設(shè)計(jì)圖紙。
1.3 材料和設(shè)備進(jìn)場(chǎng)檢驗(yàn)
在用于暖通工程的材料和各種設(shè)備進(jìn)場(chǎng)前, 專業(yè)技術(shù)人員需要對(duì)其進(jìn)行進(jìn)場(chǎng)檢驗(yàn), 檢驗(yàn)的內(nèi)容包括材料、設(shè)備的型號(hào)、規(guī)格是否符合采購(gòu)清單的要求, 各種標(biāo)牌是否齊全,質(zhì)量是否滿足施工要求,尤其是各種管材、閥門、散熱器的強(qiáng)度、成分、氣密性等必須要做到合格,對(duì)不符合要求的材料和設(shè)備堅(jiān)決不予進(jìn)場(chǎng)。要想保證暖通工程的施工質(zhì)量, 就必須要做好材料和設(shè)備的進(jìn)場(chǎng)檢驗(yàn), 無(wú)論是甲供材還是施工單位自行采購(gòu)的, 都必須嚴(yán)格執(zhí)行檢驗(yàn)制度,
1.4 施工方案優(yōu)化
對(duì)暖通工程的施工方案進(jìn)行優(yōu)化可以有效縮短工期、降低施工成本并提高施工質(zhì)量, 因此做好施工方案優(yōu)化工作具有較大的實(shí)際意義。施工方案的優(yōu)化主要包括暖通工程施工方法的確定、施工順序的安排和施工平面圖的布置。首先,要根據(jù)建筑的結(jié)構(gòu)特點(diǎn)和工藝要求確定施工方法,其次,要統(tǒng)籌規(guī)劃,做好施工各道工序的邏輯關(guān)系分析工作,選擇總工期短、有利于下道工序進(jìn)行的施工路線,再次,對(duì)施工平面圖的布置進(jìn)行優(yōu)化,以促進(jìn)資源的科學(xué)利用。
1.5 做好各專業(yè)工種的協(xié)調(diào)工作
由于暖通工程涉及到的專業(yè)工種很多, 因此在施工過(guò)程中各工種之間就需要有個(gè)很好的協(xié)調(diào), 而這一切工作在施工之前就應(yīng)當(dāng)計(jì)劃好, 比如室內(nèi)吊頂管線鋪設(shè)的施工, 由于管線包括水管、風(fēng)管、電線管等, 而在施工圖紙上只標(biāo)出了各種管線的方位,而對(duì)各專業(yè)工種施工順序未做表明,因此在施工之前一定要根據(jù)管線的空間布設(shè)規(guī)則以及工藝流程需要做出相關(guān)協(xié)調(diào)方案,以便為施工過(guò)程提供指導(dǎo)。
2 建筑暖通工程施工階段質(zhì)量控制
2.1 風(fēng)口安裝質(zhì)量控制
在主體工程完工以后, 暖通工程與裝飾裝修工程需要相互協(xié)調(diào)、穿插施工,因此需要雙方充分溝通,確定施工順序,以防止出現(xiàn)施工順序不當(dāng)造成損失, 如裝飾裝修工程完工后在墻壁開孔、促使裝飾裝修返工等, 尤其是風(fēng)口安裝時(shí)要根據(jù)圖紙要求并結(jié)合實(shí)際情況合理選擇開口位置, 如出現(xiàn)影響裝修工程則需要重新設(shè)計(jì)圖紙,在保證空調(diào)系統(tǒng)可正常使用的情況下統(tǒng)一調(diào)口位置,并將開口位置、尺寸標(biāo)注于圖紙上交給裝修單位完成開口施工。在空調(diào)安裝時(shí)要通過(guò)漏水試驗(yàn)檢查積水盤質(zhì)量是否過(guò)關(guān), 檢查暖通工程中的風(fēng)管和水管是否在接頭處緊密連接,是否牢靠,以免質(zhì)量不合格造成返工。
2.2 管道沖洗試驗(yàn)
在施工過(guò)程中管道內(nèi)部一般會(huì)留下一些雜物,如果不進(jìn)行沖洗會(huì)造成堵塞,并同時(shí)影響管道內(nèi)的水質(zhì)和壓力, 因此必須要嚴(yán)格執(zhí)行管道沖洗試驗(yàn), 以確保暖通設(shè)備試運(yùn)行的安全。
空調(diào)水的管道需要根據(jù)設(shè)計(jì)要求和規(guī)范要求進(jìn)行坡度施工,在管道沖洗試驗(yàn)時(shí),應(yīng)該根據(jù)使用前的最大流量進(jìn)行沖洗試驗(yàn), 并且要求沖洗完成后出水口的水質(zhì)透明度與進(jìn)水口一致。在沖洗前,需要對(duì)空調(diào)管道安裝好的流量孔板、過(guò)濾網(wǎng)等拆除,然后檢查各個(gè)機(jī)組的入水口旁通管路是否連通, 以確保沖洗順利進(jìn)行, 沖洗完成后, 方可以安裝各個(gè)部件。
2.3 建筑暖通施工過(guò)程中需要注意的事項(xiàng)
(1)要合理設(shè)置供暖管道的坡度,在施工時(shí)要保證管道不被外力作用變彎,并且要控制好穿墻管道的坡度, 確保水流不出現(xiàn)倒流現(xiàn)象, 對(duì)管道的支架在施工時(shí)要按照設(shè)計(jì)的標(biāo)高經(jīng)測(cè)量后施工, 必須做到精細(xì),避免出現(xiàn)倒坡,另外管道支架之間的間距要設(shè)計(jì)合理, 既不可過(guò)小造成材料浪費(fèi), 也不可過(guò)大容易導(dǎo)致管道中間部位出現(xiàn)向下彎曲的現(xiàn)象,以免在運(yùn)行時(shí)管道內(nèi)會(huì)存氣積水,并形成局部倒坡。
(2)在施工過(guò)程中要保證散熱器支管的坡度, 因此在施工中應(yīng)當(dāng)先安裝散熱器,而后安裝支管,實(shí)踐證明可以有效減少管道測(cè)量誤差。
(3)對(duì)散熱器和管道應(yīng)當(dāng)進(jìn)行防銹防腐處理, 傳統(tǒng)的做法是等管道與散熱器全部安裝完畢后進(jìn)行涂刷防銹漆, 由于管道和散熱器緊貼墻面, 因此很多部位不方便施工, 容易出現(xiàn)漏刷的情況, 為此,應(yīng)當(dāng)改變傳統(tǒng)的做法, 可在散熱器與管道安裝之前先涂刷一次防銹漆, 待防銹漆充分固化后再安裝, 安裝完畢后進(jìn)行第二遍防銹漆的涂刷, 關(guān)于防銹漆的材料的選擇要根據(jù)管材的類型和建設(shè)部的有關(guān)規(guī)定, 應(yīng)當(dāng)優(yōu)選無(wú)毒害、利于清潔的防銹漆,如石墨防銹漆等。
(4)對(duì)于隱蔽工程一定要做到先驗(yàn)收、后封閉,確保每一個(gè)施工階段都能夠符合質(zhì)量要求。
3 建筑暖通工程竣工階段質(zhì)量控制
在暖通工程竣工研究階段建設(shè)和監(jiān)理等單位要做好驗(yàn)收工作, 這是保證建筑暖通工程質(zhì)量的最后一道屏障,在驗(yàn)收時(shí),需要在對(duì)外觀檢查的基礎(chǔ)上, 對(duì)各種設(shè)備的空間位置、管道的嚴(yán)密性等等進(jìn)行檢驗(yàn),要對(duì)存在質(zhì)量問(wèn)題或隱患的部位要求施工單位進(jìn)行維修處理, 對(duì)有嚴(yán)重質(zhì)量問(wèn)題的要求施工單位做返工處理, 對(duì)不滿足質(zhì)量要求的工程不予驗(yàn)收,還要檢查施工單位提供的各類資料,包括施工圖紙、竣工圖以及施工過(guò)程中形成的變更文件等。
4 結(jié)束語(yǔ)
我國(guó)建筑工程事業(yè)迅速發(fā)展,帶動(dòng)著暖通工程的發(fā)展。在暖通工程的施工過(guò)程中,對(duì)暖通工程質(zhì)量進(jìn)行監(jiān)管,對(duì)居民的居住環(huán)境的提高有十分重要的意義,因此要不斷加強(qiáng)暖通工程的監(jiān)管力度。暖通工程質(zhì)量的監(jiān)管,有效的防止了暖通工程事故的發(fā)生,推動(dòng)了暖通工程事業(yè)的發(fā)展,對(duì)我國(guó)暖通事業(yè)的進(jìn)步提供了基礎(chǔ)條件。
參考文獻(xiàn):
[1] 顧麗敏.暖通施工質(zhì)量控制之我見.《科技創(chuàng)新與應(yīng)用》,2012.
[2] 何坤.淺談暖通工程質(zhì)量監(jiān)督工作.《工程質(zhì)量》,2013.
[3] 田翠平.論暖通安裝工程施工質(zhì)量存在問(wèn)題及措施.《科技創(chuàng)新與應(yīng)用》,2013.