室內(nèi)施工工藝范文

時(shí)間:2023-06-02 15:01:28

導(dǎo)語(yǔ):如何才能寫(xiě)好一篇室內(nèi)施工工藝,這就需要搜集整理更多的資料和文獻(xiàn),歡迎閱讀由公務(wù)員之家整理的十篇范文,供你借鑒。

室內(nèi)施工工藝

篇1

關(guān)鍵詞:室內(nèi)裝飾;施工工藝;建筑工程

Abstract: with the development of science and technology, China's economic strength of the growing, in the economic market gradually implement of the environment, people from all walks of life are ushered in more opportunities and challenges, especially in the social development has been the backbone of the status of the building trades, in the opportunities and challenges today, the market more and more competition, a construction enterprise want to seize the opportunity of market, it must have enough capital to meet its challenges. Building enterprise products are closely linked with people, its interior decoration engineering is directly facing the society. A building class enterprise to want to keep certain market competitiveness, must be done well interior decoration engineering. And to make indoor decoration engineering, must from its construction process took. This paper will be to typical interior decoration on the analysis, the construction technology.

Keywords: interior decoration; The construction technology; Construction engineering

中圖分類(lèi)號(hào):TU238+.2 文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):

1、室內(nèi)裝飾施工工藝的重要性

建筑工程是一項(xiàng)大型工程,其工程量幾乎涵蓋了社會(huì)的方方面面,這就奠定了建筑行業(yè)在市場(chǎng)中的中堅(jiān)地位。在社會(huì)競(jìng)爭(zhēng)日益趨高的大環(huán)境下,建筑企業(yè)與建筑企業(yè)的競(jìng)爭(zhēng)也越來(lái)越激烈了。建筑行業(yè)是一個(gè)長(zhǎng)遠(yuǎn)性的行業(yè),一個(gè)建筑企業(yè)要想在社會(huì)科技經(jīng)濟(jì)都日新月異的今天達(dá)到盈利的目標(biāo),其企業(yè)的管理者就必須有長(zhǎng)遠(yuǎn)發(fā)展的目光,讓企業(yè)在應(yīng)對(duì)社會(huì)各方面所投來(lái)的考驗(yàn)的同時(shí)把握住機(jī)遇。而要能夠把握住機(jī)遇,就必須有足夠的資本。這資本的關(guān)鍵在于企業(yè)的施工工藝,只有足夠成熟的施工工藝,企業(yè)才能夠擁有足夠的資本來(lái)迎接挑戰(zhàn)、把握機(jī)遇。在建筑工程這一大領(lǐng)域里,人們所關(guān)注的,往往不是結(jié)構(gòu)之類(lèi)的專(zhuān)業(yè)性問(wèn)題,人們對(duì)建筑工程的質(zhì)量評(píng)定,往往在裝飾工程這一項(xiàng)目中體現(xiàn)出來(lái)。由此可見(jiàn),裝飾工程是直接面向社會(huì)的一項(xiàng)工程,是極為重要的,其工程的成功與否,是直接主導(dǎo)著客戶(hù)對(duì)整個(gè)工程的認(rèn)識(shí)的,一個(gè)建筑企業(yè)想要能夠長(zhǎng)遠(yuǎn)發(fā)展,就必須有良好的口碑,而要有良好的口碑,就必須從裝飾施工工藝抓起。施工是一項(xiàng)工程質(zhì)量好壞的關(guān)鍵,而其施工工藝,則是施工成敗的要點(diǎn)。室內(nèi)裝飾施工也不例外,要想做好室內(nèi)裝飾施工,就必須對(duì)其工藝有一定的了解,施工管理人員必須能夠合理地運(yùn)用施工工藝,在熟悉施工工藝的同時(shí),還需要結(jié)合實(shí)際,只有這樣,才能夠把施工工藝用到實(shí)處而不流于形式,才能夠真正做好一項(xiàng)工程,才能使整個(gè)工作的質(zhì)量得到相應(yīng)的提高。

2、抹灰飾面

抹灰分一般抹灰和裝飾抹灰。裝飾抹灰常用的有拉毛抹灰和假面磚二種,如下:

2.1拉毛抹灰

在基層上抹8毫米厚砂漿,隨即用棕刷或鐵板垂直拍拉,形成均勻的毛面。小拉毛摻入水泥用量2O%——50%的石灰膏。加入適量的沙子或紙筋可減少龜裂。如果用白水泥摻礦物顏料,則成彩色拉毛。

2.2假面磚

又叫仿釉面磚,是用彩色砂漿抹成相當(dāng)于外墻面分塊形式與質(zhì)感的裝飾抹灰面。

2.21彩色砂漿配比

假面磚抹灰用的彩色砂漿參考配合比見(jiàn)下表。

2.22施工方法

先在中層抹灰面上澆水濕潤(rùn),抹上彩色水泥石灰砂漿,顏料摻量以假面磚顏色而定,砂漿厚度為3mm-4mm。待面層砂漿收水后,用鐵梳子或鐵輥在面層上沿垂直方向劃出條紋。再在面層上按照面磚寬度彈出水平線(xiàn),沿靠尺在面層上劃出分塊縫來(lái),縫深以露出中層砂漿而為準(zhǔn)。分塊縫劃好后用刷子刷去浮砂劃縫。這種做法,紋理清晰,表面平整,猶如面磚,具有較好的裝飾效果。裝飾性抹灰要求整體性強(qiáng),一旦出現(xiàn)問(wèn)題,返工或處理都很困難,所以一定要按照程序完成,確保一次做好。

3、涂料飾面

3.1涂料飾面的種類(lèi)

涂料飾面是指利用各種涂料敷于基層表面,形成完整牢固的膜層,起到保護(hù)墻面和美觀(guān)的一種飾面做法,是飾面裝修中最簡(jiǎn)便的一種形式。目前室內(nèi)裝修常用內(nèi)墻涂料有以下幾種:

3.11水溶性涂料

水溶性涂料是聚乙烯醇溶解在水中,再在其中加入顏料等其他助劑而成。這類(lèi)涂料具有價(jià)格便宜、無(wú)毒、施工方便的優(yōu)點(diǎn)。但缺點(diǎn)是耐久性不好,易泛黃變色。

3.12乳膠漆

乳膠漆是一種以水為介質(zhì),以丙烯酸酯類(lèi)、苯乙烯.丙烯酸酯共聚物、醋酸乙烯酯類(lèi)聚合物的水溶液為成膜物質(zhì),加入多種輔助成分制成。其成膜物是不溶于水的,涂膜的耐水性和耐侯性比水溶性涂料大大提高,濕擦洗后不留痕跡,并有平光、高光等不同裝飾類(lèi)型。乳膠漆的特點(diǎn)是遮蓋力強(qiáng),色澤柔和持久,容易施工,可以清洗等。

3.13多彩涂料

多彩涂料的成膜物質(zhì)是硝基纖維素,以水包油形式分散在水相中,一次噴涂可以形成多種顏色花紋。

3.14仿瓷涂料

仿瓷涂料的裝飾效果細(xì)膩、光潔、淡雅,價(jià)格不高,只是施工工藝繁雜,耐濕擦性差。

3.2、涂料的施工方法

涂料施工方法在內(nèi)墻涂料中,乳膠涂料占有較大比重,通常采用輥涂、刷涂的施工方法。

3.21施工前

乳膠漆在施工前,墻面一定要處理好,否則乳膠漆涂刷后會(huì)引起脫落、開(kāi)裂、起泡等嚴(yán)重問(wèn)題,現(xiàn)在多數(shù)施工時(shí)使用膩?zhàn)?,其?shí)膩?zhàn)雍懿荒退?,?dāng)墻體內(nèi)含水時(shí),膩?zhàn)泳蜁?huì)吸水起泡,從而造成飾面乳膠漆大面積起泡、脫落。而且乳膠漆性能越好,成膜性越好,問(wèn)題就越嚴(yán)重。因此,使用乳膠漆時(shí),先使用封閉底漆將墻面密封,然后使用耐水膩?zhàn)樱瑥亩苊庖陨蠁?wèn)題的出現(xiàn)。

3.22施工時(shí)

乳膠漆在施工時(shí),應(yīng)攪拌均勻,尤其是使用色彩鮮艷的產(chǎn)品時(shí),如果不攪拌均勻,當(dāng)涂料中色漿分散不穩(wěn)定或由于長(zhǎng)時(shí)間儲(chǔ)存后色漿析出,這時(shí)施工就會(huì)造成飾面發(fā)花,嚴(yán)重影響裝飾效果。另外,乳膠漆施工時(shí)可否加水及加水量的多少,一定要嚴(yán)格按照廠(chǎng)家的規(guī)定。因?yàn)橛行S(chǎng)家在設(shè)計(jì)開(kāi)發(fā)乳膠漆時(shí),已經(jīng)充分考慮到用戶(hù)的各種需求,設(shè)計(jì)了多種配方,有些乳膠漆在施工時(shí)不用加水,加水反而破環(huán)乳膠漆的各種性能。注意在施工時(shí)可以采用刷涂、輥涂和噴涂工藝,以上無(wú)論哪種方法都能達(dá)到預(yù)期的效果,但是需要調(diào)好乳膠漆的黏度,黏度以在施工時(shí)容易涂刷,且刷后無(wú)明顯刷痕為宜。黏度太大刷痕明顯,黏度偏低,則易造成流

渣、遮蓋力差等弊病。

3.23施工后

施工完畢,工具應(yīng)及時(shí)用水清洗,否則乳膠漆干燥后,由于漆膜的耐水性,將很難清洗干凈。

4、貼面類(lèi)飾面

貼面類(lèi)是指利用各種天然石材或人造板、塊,通過(guò)綁、掛或直接粘貼于基層表面的飾面做法。這類(lèi)裝修具有耐久性好、施工方便、裝飾性強(qiáng)、質(zhì)量高、易于清洗等優(yōu)點(diǎn)。常用的貼面材料有陶瓷面磚、馬賽克、剁斧石、鋁塑板、花崗巖板、大理石板等。

4.1施工流程

貼面類(lèi)裝飾基本工藝流程,陶瓷面磚:基層清掃處理、抹底子灰、選磚、浸泡、排磚、彈線(xiàn)、粘貼標(biāo)準(zhǔn)點(diǎn)、粘貼瓷磚、勾縫、擦縫、清理。

4.2施工方法

4.21基層處理

基層處理時(shí),應(yīng)全部清理墻面上的各類(lèi)污物,基層必須清理干凈,不得有浮土、浮灰,并提前澆水濕潤(rùn)。混凝土墻面應(yīng)鑿除凸起部分,將基層鑿毛,清凈浮灰?;蛴脦z的水泥砂漿拉毛。抹底灰后,待六至七成干時(shí),進(jìn)行排磚彈線(xiàn)。

4.22關(guān)于粘貼標(biāo)準(zhǔn)點(diǎn)

正式粘貼前必須粘貼標(biāo)準(zhǔn)點(diǎn),用以控制粘貼表面的平整度,操作時(shí)應(yīng)隨時(shí)用靠尺檢查平整度,不平、不直的,要取下重粘。

4.23瓷磚粘貼前

瓷磚粘貼前必須在清水中充分浸泡,取出待用。

4.24鋪粘時(shí)

鋪粘時(shí)遇到管線(xiàn)、燈具開(kāi)關(guān)、衛(wèi)生間設(shè)備的支承件等,用整磚套割吻合。

4.25鑲貼后

鑲貼完,用棉絲將表面擦凈,然后用白水泥漿擦縫。

結(jié)論:在營(yíng)造室內(nèi)與室外空間環(huán)境時(shí),秉承著安全堅(jiān)固、美觀(guān)大方、便捷舒適的設(shè)計(jì)原則,將適宜的裝飾材料與正確的施工工藝方法結(jié)合起來(lái),可以展現(xiàn)更好的裝飾效果。只有了解各類(lèi)材料的特性,掌握其施工工藝的方法,才能更好地在各項(xiàng)工種的統(tǒng)籌配合下將設(shè)計(jì)與材料完美結(jié)合在一起,才能更好地展現(xiàn)裝飾制品的特性。因此,裝飾材料與施工工藝之間有著密不可分的關(guān)系。

參考文獻(xiàn):

[1]湯偉,王大泉,室內(nèi)裝飾施工工藝的探討[J],商品與質(zhì)量·工程科技

[2]曹衛(wèi)中,室內(nèi)裝飾施工技術(shù)發(fā)展趨勢(shì)探討[J],中華民居,2011(9)

篇2

關(guān)鍵詞:裝修;工藝

中圖分類(lèi)號(hào):TU74 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):

1 室內(nèi)裝飾工程的特點(diǎn)

室內(nèi)裝飾工程的特點(diǎn)是:

1)有較強(qiáng)的技術(shù)性和藝術(shù)性。

2)項(xiàng)目繁多,各工種、工序的搭接嚴(yán)密,工程量大,工期相對(duì)較長(zhǎng)。

3)涉及配合專(zhuān)業(yè)單位多,協(xié)調(diào)難度大。

4)施工多采用小型機(jī)具,手工操作量大。

5)裝飾材料品種豐富、規(guī)格多樣,施工工藝與處理方法各異。

6)裝飾的標(biāo)準(zhǔn)越來(lái)越高,裝飾費(fèi)用所占工程造價(jià)的比例越來(lái)越大。

2 我國(guó)室內(nèi)裝修傳統(tǒng)施工工藝存在的問(wèn)題

2.1 施工質(zhì)量無(wú)法保證

傳統(tǒng)的施工工藝之所以無(wú)法保證質(zhì)量,原因是多方面的,生產(chǎn)的過(guò)程非常的含糊,濕作業(yè)比較多,工藝非常的復(fù)雜,需要很強(qiáng)的專(zhuān)業(yè)性等等。主要是室內(nèi)裝修在工藝上比較落后,傳統(tǒng)的室內(nèi)裝修施工工藝大多以手工操作為主,機(jī)械化程度不高,施工方式也比較落后,因此在這種方式下進(jìn)行的室內(nèi)裝修,一般質(zhì)量得不到保證。例如在室內(nèi)裝修中經(jīng)營(yíng)會(huì)遇到木材變形問(wèn)題,這是因?yàn)樵诂F(xiàn)場(chǎng)施工中,木龍骨不會(huì)像工廠(chǎng)那樣得到完全烘干,木材的應(yīng)力不能去除,加之一年四季的溫濕度變化,就會(huì)產(chǎn)生濕漲干縮的問(wèn)題。而手工操作的弊病,墻面

起鼓、開(kāi)裂;手工刷漆,毛刷、空氣、油漆、工作面四個(gè)污染源難以消除,造成漆面凹凸不平,飾面感觀(guān)粗糙;手工制作的木制品產(chǎn)生的變形、裂縫、釘眼、彎曲、外觀(guān)品質(zhì)差等問(wèn)題同樣是顯而易見(jiàn)的。另外施工人員的素質(zhì)參差不齊,也是造成室內(nèi)裝修工藝質(zhì)量無(wú)法的得到

控制和保證的原因,現(xiàn)在很多施工人員上崗前并沒(méi)有進(jìn)行過(guò)專(zhuān)業(yè)的培訓(xùn),沒(méi)有上崗證也沒(méi)有相應(yīng)的資質(zhì)和證明,沒(méi)有專(zhuān)業(yè)素質(zhì)的裝修隊(duì)伍,當(dāng)然不能保證施工工藝質(zhì)量。

2.2 室內(nèi)裝修施工工期長(zhǎng)

一般來(lái)說(shuō)土建結(jié)構(gòu)完成后室內(nèi)裝修施工才開(kāi)始,室內(nèi)裝修專(zhuān)業(yè)內(nèi)工種多、工序多、專(zhuān)業(yè)外配合單位多,施工現(xiàn)場(chǎng)工作面難免受到極大的限制,彼此之間也相互牽制和影響,誤工拖時(shí)耗資的情況屢屢發(fā)生,從而使得工期很難得到保證,也存在很多的安全問(wèn)題和隱患。

2.3 建筑裝飾材料市場(chǎng)混亂

隨著市場(chǎng)經(jīng)濟(jì)的發(fā)展,裝飾材料品種、規(guī)格、品牌日益繁多、價(jià)格千差萬(wàn)別,質(zhì)量參差不齊,如花崗巖、大理石市場(chǎng)上有每平方米幾十元、幾百元,甚至還有千元以上的,其材質(zhì)如何呢?有天然的、人造的、也有假冒的、偽造的,是一般材料管理人員難以識(shí)別的。又

如,有些飾面板,品牌、產(chǎn)地完全相同,而市場(chǎng)價(jià)格每平方米卻相差十幾元。這為一些不法施工單位提供了可乘之機(jī),某些施工單位往往竭力強(qiáng)調(diào)特殊要求,采用高價(jià)材料,實(shí)際施工時(shí)使用的卻是假冒或劣質(zhì)的同類(lèi)材料,還有一些施工單位在某些材料品種的規(guī)格和厚度上做

文章,鋼筋直徑不規(guī)范,鋼管、鑄鐵管、鋁合金變得薄不勝薄,造成了建設(shè)資金大量流失,降低了工程質(zhì)量。

3 室內(nèi)裝修傳統(tǒng)施工工藝問(wèn)題的解決對(duì)策

3.1 施工人員素質(zhì)的提高

對(duì)于工人的施工手藝比較落后,可以采取定期對(duì)裝飾工人進(jìn)行培訓(xùn),讓他們也及時(shí)的了解到裝修方面的最新技術(shù)和材料。經(jīng)過(guò)這樣的培訓(xùn)以后,工人對(duì)裝修的手藝和速度都會(huì)從根本上有所提高。這樣裝修團(tuán)隊(duì)對(duì)于裝修公司來(lái)說(shuō)既節(jié)省了大量的成本,也滿(mǎn)足了客戶(hù)方面在

質(zhì)量上的要求。

3.2 施工工序的科學(xué)化

裝修工程工種繁多,大都有交叉作業(yè)。如果讓所有的工種同時(shí)進(jìn)場(chǎng),不僅施工不能展開(kāi),還會(huì)出現(xiàn)“打架”現(xiàn)象,既浪費(fèi)材料、人工,又影響施工進(jìn)度,還容易發(fā)生事故。為了更好的省時(shí)、省力、省料、省錢(qián)的進(jìn)行室內(nèi)裝修施工,就要根據(jù)各工程的實(shí)際施工需要,科學(xué)、合理地規(guī)范施工工序,安排施工進(jìn)度,各工種及人數(shù)嚴(yán)格按工序、進(jìn)度計(jì)劃進(jìn)場(chǎng)。一般先讓水、電工進(jìn)場(chǎng),開(kāi)洞、鑿孔、放線(xiàn)、批蕩,做好隱蔽工程,依次是,泥工進(jìn)場(chǎng)補(bǔ)缺找平,墻面批蕩,然后木工進(jìn)場(chǎng)等。每道工序都要按有關(guān)質(zhì)量規(guī)范和標(biāo)準(zhǔn)進(jìn)行,施工管理人員和質(zhì)量檢查人員嚴(yán)格把住每道工序的質(zhì)量驗(yàn)收關(guān),上一道工序沒(méi)有驗(yàn)收簽字,下一道工序不得施工。施工工序的合理安排,有效地保證了工程質(zhì)量和施工組織計(jì)劃的落實(shí),實(shí)現(xiàn)了工程快、好、省的要求。

3.3 施工材料的管理

裝修工程需要用到多種裝飾材料,材料組織無(wú)計(jì)劃或計(jì)劃不準(zhǔn)確,就會(huì)出現(xiàn)停工待料或材料以劣充優(yōu),質(zhì)量難以保證等影響工作效率和工程質(zhì)量的問(wèn)題。在材料供應(yīng)管理中,實(shí)行“質(zhì)量一票否決制”。材料供應(yīng)員按材料計(jì)劃和樣板警醒采購(gòu)材料,材料倉(cāng)庫(kù)管理員按樣板驗(yàn)收,貨不對(duì)板可以拒收,不允許有任何不合格產(chǎn)品進(jìn)入現(xiàn)場(chǎng)。嚴(yán)格的內(nèi)部約束機(jī)制,確保施工所需要的各類(lèi)原材料有計(jì)劃、有組織、保質(zhì)、保量得到供應(yīng)。施工現(xiàn)場(chǎng)的材料更需要科學(xué)、嚴(yán)格、細(xì)致的管理制度,稍有不慎就會(huì)因小失大,造成浪費(fèi),延誤工期。對(duì)材料的加工和使用要有比較細(xì)致的規(guī)定。如在開(kāi)料前,對(duì)木料、石料、瓷片等材料按質(zhì)量、尺寸、色差進(jìn)行挑選分類(lèi),好的用在重要部位,色差區(qū)別小的集中使用在同一區(qū)域中。開(kāi)料時(shí)遵照“先開(kāi)大料,后開(kāi)小料”,先用“重要部位”,后用“次要部位”的次序進(jìn)行。當(dāng)天加工的材料要當(dāng)天清理。這些措施的實(shí)施節(jié)約了人力、物力、財(cái)力,也利于消防和安全生產(chǎn)。

4 室內(nèi)裝修施工工藝流程的規(guī)范

4.1 裝修方案的確認(rèn)

裝修方案的確認(rèn),是做好裝修工程必需的程序,任何裝修設(shè)計(jì)方案必須根據(jù)業(yè)主安全使用功能的要求來(lái)確定。掌握工程的建筑結(jié)構(gòu)情況,水、電、空調(diào)、通風(fēng)等設(shè)備的安裝情況及施工質(zhì)量情況,功能布局情況必須按業(yè)主對(duì)裝飾裝修使用功能的要求和意圖審核設(shè)計(jì)方案。

一個(gè)完美的裝修工程方案,在滿(mǎn)足建筑結(jié)構(gòu)安全要求的前提下,通過(guò)材料選用的確認(rèn)、精確的施工工藝方案的審核批準(zhǔn)、精心的施工組織設(shè)計(jì)的選擇及嚴(yán)密的施工組織管理,是實(shí)現(xiàn)滿(mǎn)足使用功能要求、項(xiàng)目計(jì)劃質(zhì)量與工期目標(biāo)、項(xiàng)目計(jì)劃投資控制目標(biāo)要求與藝術(shù)性效果向統(tǒng)一整體目標(biāo)的前提。業(yè)主通常很重視設(shè)計(jì)方案的確定,所以作為裝修工程的設(shè)計(jì)單位,要配合業(yè)主做好這方面的工作,本著投資經(jīng)濟(jì),滿(mǎn)足實(shí)用,效果美觀(guān)的目的,與業(yè)主討論研究確定最佳的裝修工程設(shè)計(jì)方案。裝飾設(shè)計(jì)階段,是項(xiàng)目工程計(jì)劃質(zhì)量控制目標(biāo)、計(jì)劃投資控制目標(biāo)、計(jì)劃工期控制目標(biāo)的實(shí)現(xiàn)的關(guān)鍵階段,正確對(duì)待和處理好質(zhì)量與投資之間的關(guān)系。質(zhì)量和投資之間,是一個(gè)矛盾和統(tǒng)一的關(guān)系,以質(zhì)量為目標(biāo),關(guān)系到投資目標(biāo)控制的問(wèn)題,裝修設(shè)計(jì)階段對(duì)工程質(zhì)量的要求是:使項(xiàng)目的質(zhì)量在符合現(xiàn)行規(guī)范和標(biāo)準(zhǔn)要求的前提下,滿(mǎn)足業(yè)主總項(xiàng)目計(jì)劃目標(biāo)的要求。裝修設(shè)計(jì)階段除滿(mǎn)足質(zhì)量和投資要求外,同時(shí)要考慮施工過(guò)程中的可行性,還要滿(mǎn)足項(xiàng)目計(jì)劃工期目標(biāo)控制的要求。

4.2 裝飾材料的明確和選購(gòu)

裝修工程量龐大,裝修材料和設(shè)備種類(lèi)多。如地板、石材、涂料、墻布、地磚、墻磚、拋光磚、淋浴房、座便器,水龍頭、臺(tái)盆、整體櫥柜、防盜門(mén)、門(mén)鎖、衛(wèi)浴五金掛件、工程五金、玻璃幕墻、電梯、空調(diào)、冰箱、新風(fēng)、熱水器、浴霸、燈具、開(kāi)關(guān)面板等等。為了

保證這些主要材料的品質(zhì),通常開(kāi)發(fā)商都會(huì)對(duì)上述材料采取甲供或甲定乙供的方式采購(gòu)。目前裝飾建筑市場(chǎng)上同一種材料都有十幾家甚至幾十家競(jìng)爭(zhēng)單位,要從這么多單位中挑選出一家合適的品牌,這是一項(xiàng)繁重的工作。

4.3 施工現(xiàn)場(chǎng)全封閉作業(yè)

施工現(xiàn)場(chǎng)實(shí)行封閉后,只留施工過(guò)程中必要的出入口,其余通道用臨時(shí)設(shè)施封閉,使用指定的通道、員工電梯,服從工地保安人員的指導(dǎo)和安排,并在出入口設(shè)立保安人員,嚴(yán)格控制非施工人員進(jìn)入施工現(xiàn)場(chǎng)。

4.4 施工過(guò)程中的質(zhì)量和進(jìn)度控制

裝飾裝修工程的施工質(zhì)量對(duì)整個(gè)項(xiàng)目能否順利竣工驗(yàn)收、交付使用起至關(guān)重要的影響,而且對(duì)交付使用和維保至關(guān)重要。

篇3

關(guān)鍵詞:石膏板;鈣塑板;室內(nèi)罩面;施工工藝

中圖分類(lèi)號(hào):P619.26+1 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):

1石膏板及鈣塑板系統(tǒng)的特點(diǎn)

1.1石膏板系統(tǒng)的特點(diǎn)

(1)板長(zhǎng)方向大體呈現(xiàn)楔形倒角,具體形狀、尺寸如圖1顯示。(2)板間在安裝過(guò)程中無(wú)需留縫隙,龍骨的施工根據(jù)國(guó)內(nèi)標(biāo)準(zhǔn)圖集進(jìn)行。(3)保持接縫材料的抗拉強(qiáng)度大于石膏板自身的強(qiáng)度,以避免在板接縫處形成裂縫。(4)將隔墻重量控制在普通磚墻的20%內(nèi)。(5)安裝速度較快。(6)在設(shè)計(jì)時(shí)注重方案的靈活性,最好是可根據(jù)實(shí)際情況進(jìn)行變化,能達(dá)到具體的隔聲要求。

圖1 石膏板邊倒角尺寸

1.2 鈣塑板系統(tǒng)的特點(diǎn)

鈣塑吊頂板的特點(diǎn)在于外表美觀(guān)、質(zhì)量小、防潮性好、難燃,對(duì)于抗震具備相應(yīng)的作用,且吸音、隔音、裝飾效果好。利用膠粘劑實(shí)現(xiàn)鈣塑板與術(shù)龍骨的粘合,其施工操作簡(jiǎn)便,且穩(wěn)定性好。鈣塑板的原料構(gòu)成是由高壓聚乙烯輕體碳酸鈣、氫氧化鋁混合后制出的碳酸鈣為底層片填料,而氫氧化鋁是表層的為填料,然后經(jīng)過(guò)熱壓、發(fā)泡、真空成型等工藝制成。當(dāng)前,鈣塑吊頂逐漸與輕鋼龍骨配合起來(lái)在高級(jí)裝修吊頂中得到了廣泛的運(yùn)用,該材料的特點(diǎn)在于質(zhì)量輕,安全性能較強(qiáng),防震效果好,在設(shè)計(jì)過(guò)程中應(yīng)該根據(jù)實(shí)際需要進(jìn)行不同的凹凸立體造型,其不但裝飾美觀(guān),具有防潮作用,在穿孔后能夠達(dá)到用戶(hù)的吸聲及通風(fēng)需求,是需要積極運(yùn)用的建筑飾面材料。

2石膏板、鈣塑板施工順序及要點(diǎn)

2.1石膏板、鈣塑板施工順序

放線(xiàn)澆筑導(dǎo)墻安裝天地龍骨安裝門(mén)窗洞口加強(qiáng)龍骨安裝豎向龍骨安裝水平貫通龍骨安裝專(zhuān)業(yè)管道及設(shè)備安裝一側(cè)紙面石膏板辦辦理隱檢、聯(lián)檢安裝另一側(cè)紙面石膏板安裝雙層體系的第二層紙面石膏板(考慮隔聲要求,本工程確定石膏板層數(shù)為1+2層,共3層)接縫處理裝修。

2.2石膏板、鈣塑板的施工要點(diǎn)

(1) 在施工過(guò)程中要保持石膏板、鈣塑板的種類(lèi)、規(guī)格、樣式、固定等都能達(dá)到設(shè)計(jì)的標(biāo)準(zhǔn)。 (2)在安裝石膏板、鈣塑板前期,判定龍骨及罩面位置是需要根據(jù)設(shè)計(jì)要求彈線(xiàn)。(3)如果墻和柱的罩面板下端需要木踢腳板時(shí),保持罩面板與地面的距離在20~30 mm;采用大理石踢腳板時(shí)保持罩面板下端和踢腳板上口在同一水平。(4)當(dāng)室內(nèi)墻面、柱面抹灰、管線(xiàn)、燈具安裝結(jié)束后采取罩面。在施工過(guò)程中通風(fēng)、水暖、電氣管道的吊桿不能通用。

3龍骨安裝工藝

在龍骨安裝工藝時(shí)應(yīng)該注意以下步驟:

(1)澆筑C20混凝土導(dǎo)墻,寬為90mm,高為110mm。(2)在導(dǎo)墻的適當(dāng)位置設(shè)置龍骨線(xiàn)、隔墻位置線(xiàn)、門(mén)窗洞口位置線(xiàn)。(3)根據(jù)要求進(jìn)行天地龍骨和門(mén)窗洞口的安裝,以增強(qiáng)加強(qiáng)龍骨,利用射釘將其固定在導(dǎo)墻、樓板、梁上。(4)在分檔過(guò)程中參照石膏板的規(guī)格,將間距控制在600mm。若模數(shù)不足時(shí)進(jìn)行分檔要防止洞口邊第一塊石膏板的位置,盡量讓破邊石膏板遠(yuǎn)離門(mén)洞口處。(5)安裝豎向龍骨時(shí)需根據(jù)分檔位置,將天地龍骨分別插入在豎向龍骨的上、下兩端,然后對(duì)其垂直度進(jìn)行觀(guān)測(cè),在定位準(zhǔn)確的基礎(chǔ)下采用抽芯鉚釘對(duì)其固定,在隔墻上加2道貫通龍骨后以卡子卡緊。

4 紙面石膏板安裝順序

(1)對(duì)龍骨的相關(guān)施工要求進(jìn)行檢查,主要包括了規(guī)格、間距、平整度、垂直度等,以確定其達(dá)到了設(shè)計(jì)標(biāo)準(zhǔn)。(2)安裝紙面石膏板時(shí)從門(mén)洞口處進(jìn)行,保持板邊與豎向龍骨位置平行,使其與豎向龍骨翼緣的中心線(xiàn)對(duì)準(zhǔn)。采用25mm長(zhǎng)自攻螺釘對(duì)石膏板進(jìn)行固定,保持間距在200mm,控制螺釘距板邊在10~16mm。固定自攻螺釘時(shí)要保證紙面石膏板與龍骨緊密結(jié)合。在自攻螺釘與板面之間留下間隙,以防止板面被破壞。(3)一側(cè)紙面安裝結(jié)束后,安裝下一紙面時(shí)要與前面的板縫錯(cuò)開(kāi)。(4)第一層板安裝后需持續(xù)安裝第二層板,要對(duì)其進(jìn)行固定,可選擇45mm長(zhǎng)自攻螺釘進(jìn)行,保持固定方法的一致性,將兩者的板縫錯(cuò)開(kāi)。

5接縫處理要求

板邊處理。面紙包封的板邊不需要對(duì)其處理,而在嵌縫前需要對(duì)切割的板邊進(jìn)行處理,具體為安裝板前把正面紙板邊上口做倒角,當(dāng)板固定結(jié)束時(shí)利用小刀把倒角邊的面紙去掉,再將挑開(kāi)的面紙除去,這一過(guò)程中要避免石膏芯子外露,同時(shí)將面紙的下層紙保留,以保證嵌縫具有較好的質(zhì)量。

嵌縫工序。(1)要利用小刮刀把嵌縫腛子飽滿(mǎn)地嵌入板下的縫隙內(nèi),促使腫子劃出背面板邊而建立凸出的膩?zhàn)友乜?,加固板邊與嵌縫膩?zhàn)印H缓笥谛笨诮涌p處刮出膩?zhàn)?,采用刮刀的寬?0mm,膩?zhàn)哟笮挒?0 mm,厚為1 mm,再貼上玻纖網(wǎng)格,利用刮刀把網(wǎng)格帶壓進(jìn)膩?zhàn)印?2)待上道膩?zhàn)痈赏负?用150 mm寬的刮刀,嵌縫石膏膩?zhàn)?將楔形縫批嵌滿(mǎn)平。(3)當(dāng)上道膩?zhàn)油耆赏笗r(shí)用300 mm寬的刮刀補(bǔ)嵌嵌縫石膏膩?zhàn)?,使其寬度?00mm,厚度小于石膏板面的1·5 mm.(4)當(dāng)膩?zhàn)油耆赏冈儆秒妱?dòng)、手動(dòng)打磨器磨平嵌縫石膏膩?zhàn)樱磺薪Y(jié)束后就能夠與整個(gè)紙面石膏平頂、墻面同時(shí)進(jìn)行裝修。這時(shí)需要注意的是接縫處理的工序需要在其他工序結(jié)束后再進(jìn)行;嵌縫施工要防止穿堂風(fēng),以避免裂縫的形成,保證建筑的使用性能。

6質(zhì)量標(biāo)準(zhǔn)與控制

6.1質(zhì)量標(biāo)準(zhǔn)

(1)基本項(xiàng)目:保證設(shè)置的骨架在合理的位置,且未發(fā)生變形,豎向龍骨分檔準(zhǔn)確且保存伸縮量,釘固間距達(dá)到設(shè)計(jì)標(biāo)準(zhǔn)。確保安裝結(jié)束時(shí)石膏板的表面光滑。(2)將施工偏差控制在國(guó)家建筑標(biāo)準(zhǔn)允許的范圍內(nèi)。(3)對(duì)施工工序進(jìn)行仔細(xì)地檢查,保證質(zhì)量,確保施工的順利進(jìn)行。

6.2導(dǎo)致罩面裂縫形成的原因與控制

(1)板材性能。石膏板在裝飾工程建筑中屬于使用較多的材料,當(dāng)期長(zhǎng)時(shí)間處在受潮環(huán)境下就大大增加了變形的幾率,這是石膏板罩面接縫處形成裂縫的原因。 (2)龍骨骨架安裝。選擇質(zhì)量好的龍骨材料運(yùn)用到施工安裝過(guò)程中能夠避免罩面出現(xiàn)裂縫,且將龍骨的間距控制在最小也能防止出現(xiàn)裂縫。(3)石膏板接縫處理。由于石膏板的接縫處常常受到應(yīng)力作用,在使用嵌縫材料時(shí)要保證其足夠的強(qiáng)度、粘結(jié)力、彈性,這樣在壓力作用下具備較強(qiáng)的伸縮力,防止受到過(guò)大應(yīng)力的作用,以避免裂縫的產(chǎn)生。(4)細(xì)部處理。對(duì)龍骨紙面石膏板墻面、風(fēng)口、造型吊頂?shù)鹊胤竭m當(dāng)?shù)丶釉O(shè)龍骨或間隙,當(dāng)石膏板承受應(yīng)力時(shí)可以具備抗變形能力。

7保護(hù)及養(yǎng)護(hù)

石膏板及鈣塑板在存放、搬運(yùn)、施工過(guò)程中應(yīng)防止重壓、機(jī)械損傷和雨淋,應(yīng)存放在陰涼干燥處,不接觸明火,注意保持板面清潔,不受污染。同時(shí),應(yīng)做好搬運(yùn)、堆放的問(wèn)題,以防變形、碰損。特別是目前石膏板與鈣塑板產(chǎn)品周邊薄厚不一致,粘合施工前應(yīng)按不同的厚度分類(lèi),分片使用,以保接搓處平整一致。另外在嵌縫工作時(shí)就必須避免穿堂風(fēng),否則該部位的接縫很容易產(chǎn)生裂縫。

8結(jié)語(yǔ)

總之, 石膏板、鈣塑板進(jìn)行室內(nèi)罩面的施工,只要做到設(shè)計(jì)合理、原材料合格、施工規(guī)范,就完全能夠確保罩面質(zhì)量,給用戶(hù)提供滿(mǎn)意的產(chǎn)品。

參考文獻(xiàn)

篇4

關(guān)鍵詞: 室內(nèi)裝修; 施工技術(shù); 住宅;質(zhì)量控制;

Abstract: This article from the construction quality of the overall control and construction process quality control two aspects, discusses how to control construction quality of residential decorative decoration, the decoration has become an urgent issue. Construction quality control measures for indoor decoration, to do some analysis!

Key words: interior decoration; housing; construction technology; quality control

中圖分類(lèi)號(hào):TU741前言 隨著我國(guó)經(jīng)濟(jì)的發(fā)展和人民生活水平的提高,人們對(duì)居住環(huán)境及居住質(zhì)量也提出了更高的要求,住宅裝飾裝修市場(chǎng)也得到了不斷擴(kuò)展。同時(shí)隨著住宅建設(shè)水平的不斷提高,工藝水平在發(fā)展,原材料不斷更新,對(duì)建筑室內(nèi)裝修工程施工的質(zhì)量標(biāo)準(zhǔn)也有新的要求。

1 裝修工程施工過(guò)程管理的分析

1.1 施工技術(shù)的準(zhǔn)備 作為大型建筑裝飾工程,其施工工藝復(fù)雜,材料品種繁多,各施工工種班組多。這要求我們作為現(xiàn)場(chǎng)施工管理人員務(wù)必做好技術(shù)準(zhǔn)備。①必須熟悉施工圖紙,針對(duì)具體的施工合同要求,盡最大限度去優(yōu)化每一道工序,每一分項(xiàng)(部)工程,同時(shí)考慮自身的資源(施工隊(duì)伍、材料供應(yīng)、資金、設(shè)備等)各氣候等自然條件,認(rèn)真、合理地做好施工組織計(jì)劃,并以橫道圖或網(wǎng)絡(luò)圖表示出來(lái),從大入小,由面及點(diǎn),確保每一分項(xiàng)工程能納入受控范圍之中。②針對(duì)工程特點(diǎn),除了合理的施工組織計(jì)劃外,還必須在具體的施工工藝上作好技術(shù)準(zhǔn)備,特別是高新技術(shù)要求的施工工藝。技術(shù)儲(chǔ)備包括技術(shù)管理人員,技術(shù)工長(zhǎng)及工人,新技術(shù)新工藝培訓(xùn),施工規(guī)范,技術(shù)交底身先士等工作。只有擁有高素質(zhì)的技術(shù)管理人員,洞悉具體的施工工藝才能確保施工過(guò)程的每一工序步驟盡在掌握之中,了然于心,做好各方面突況的處理準(zhǔn)備方案,以保證能按時(shí)保質(zhì)地完成。通過(guò)有計(jì)劃有目的的培訓(xùn),技術(shù)交底,可以使施工技術(shù)工人,工長(zhǎng)熟悉新的施工工藝,新的材料特性,共同提高技術(shù)操作、施工水平, 進(jìn)而保證施工質(zhì)量。

1.2 施工材料方面的管理 相對(duì)于土建施工,裝修工程有其固有的特點(diǎn),主要的一面,就是其所需的材料種類(lèi)繁多,并且,經(jīng)常有許多最新的材料應(yīng)用的問(wèn)題。因 此,針對(duì)材料的問(wèn)題,必須解決好材料:①材料供應(yīng)。②材料采購(gòu)。③材料分類(lèi)堆放。④材料發(fā)放等。

1.3 施工過(guò)程中人員的管理 從一定意義上來(lái)說(shuō),人是決定工程成敗的關(guān)鍵。所有的工程項(xiàng)目均是通過(guò)人將材料組織而創(chuàng)造出來(lái)的。只有擁有一支富有創(chuàng)造力的、紀(jì)律嚴(yán)明的施工隊(duì)伍才能完成一項(xiàng)質(zhì)量?jī)?yōu)良的工程項(xiàng)目。①必須營(yíng)造出一種榮辱與共的氛圍,職責(zé)分明但不失親和力,讓所有的員工都感到自己是這個(gè)項(xiàng)目的大家庭中的一員。②必須明確施工隊(duì)伍的管理體制,各崗位職責(zé),權(quán)利明確,做到令出必行。③針對(duì)具體情況適當(dāng)使用經(jīng)濟(jì)杠桿的手段,對(duì)人員管理必定起到意想不到的作用。

1.4 施工過(guò)程應(yīng)注意的幾個(gè)問(wèn)題 正式施工是合同實(shí)施的主要過(guò)程,根據(jù)本人在平時(shí)施工過(guò)程中的切身體會(huì),在此階段應(yīng)注意避免以下幾個(gè)情況: ①業(yè)主將工程全部交給監(jiān)理或拋開(kāi)監(jiān)理全面直接管理; ②業(yè)主一提到變更索賠就回避,不能做到嚴(yán)格履行合同; ③監(jiān)理不能全過(guò)程在施工現(xiàn)場(chǎng),因?yàn)檠b飾工程隱蔽項(xiàng)目多,不在現(xiàn)場(chǎng)無(wú)從掌握質(zhì)量; ④承包商施工設(shè)備不夠,施工人員水平不夠或質(zhì)量控制不嚴(yán),資料遺失嚴(yán)重;⑤承包商擬通過(guò)不合理變更和索賠來(lái)為低價(jià)項(xiàng)目產(chǎn)生利潤(rùn)。

2 建筑室內(nèi)裝修工程施工質(zhì)量的整體控制 建筑室內(nèi)裝修工程施工質(zhì)量是一個(gè)系統(tǒng)工程,只有對(duì)整體施工過(guò)程進(jìn)行質(zhì)量控制才能根本上提高建筑室內(nèi)裝修工程施工質(zhì)量水平,要做好全面的質(zhì)量控制重點(diǎn)就是事前控制和事中控制。裝修工程的施工質(zhì)量控制包括事前控制、事中控制和事后控制,事前控制是預(yù)防、事中控制是關(guān)鍵、事后控制就是對(duì)質(zhì)量的驗(yàn)收,要整體上控制施工質(zhì)量,事前預(yù)防和事中的控制就成了重中之重。 事前控制主要是指在圖紙會(huì)審環(huán)節(jié)和施工組織設(shè)計(jì)環(huán)節(jié)對(duì)室內(nèi)裝修工程施工質(zhì)量,只有通過(guò)事前有效的預(yù)防控制,之后的施工過(guò)程控制和事后的工程驗(yàn)收的結(jié)果就會(huì)有得到較好的控制。①設(shè)計(jì)圖紙是施工單位進(jìn)行施工質(zhì)量控制的重要依據(jù),在施工前要做好對(duì)裝飾裝修工程施工圖審查,為了在施工前能發(fā)現(xiàn)和減少圖紙的差錯(cuò),防患于未然,事先消除圖紙的質(zhì)量隱患。② 裝修施工組織設(shè)計(jì)是裝飾裝修工程質(zhì)量的重要保證。承擔(dān)建筑裝飾裝修工程施工的單位應(yīng)編制施工組織設(shè)計(jì)并應(yīng)經(jīng)過(guò)審查批準(zhǔn),施工組織設(shè)計(jì)應(yīng)包括工程進(jìn)度計(jì)劃、與其他工程的協(xié)調(diào)配合方案、施工技術(shù)方案、檢查驗(yàn)收和安全措施等。

事中控制主要是指在裝修施工過(guò)程中進(jìn)行的質(zhì)量控制,質(zhì)量管理人員應(yīng)加強(qiáng)檢查和做好各工序的驗(yàn)收工作。①檢查參與裝飾裝修施工各方質(zhì)量保證制度和措施,確保它們都能夠嚴(yán)格按照國(guó)家標(biāo)準(zhǔn)選擇裝飾裝修材料和設(shè)備,進(jìn)行安裝施工。② 進(jìn)場(chǎng)原材料、設(shè)備必須經(jīng)監(jiān)理審核,合格后才能使用在工程上。隱蔽部位必須有自檢手續(xù)并報(bào)監(jiān)理驗(yàn)收,做好隱蔽資料。③要及時(shí)對(duì)正在施工的部位或工序進(jìn)行定時(shí)檢查或不定期抽查,發(fā)現(xiàn)問(wèn)題及時(shí)處理。

3 建筑室內(nèi)裝修施工技術(shù)工藝的質(zhì)量控制

3.1 地面質(zhì)量的基本要求 住宅裝修施工中地面所使用的材料以石材 地磚.木質(zhì)地扳、復(fù)合地板、塑膠地板塊及地毯較為常見(jiàn) 在施工前,應(yīng)對(duì)石材及地磚的色彩、規(guī)格尺寸進(jìn)行嚴(yán)格的檢查,如有色差及規(guī)格不準(zhǔn)確的材料,必須更換,施工后的表面效果應(yīng)達(dá)到設(shè)計(jì)要求,板塊與基層應(yīng)結(jié)和牢固、無(wú)空鼓、無(wú)裂紋、無(wú)缺角掉邊,鋪貼應(yīng)平整、無(wú)錯(cuò)縫、接縫平直、深淺一致,周邊順直,禁止磨邊。木質(zhì)地板的選材要經(jīng)過(guò)干燥處理,表面施涂的清漆不得少于三遍。

3.2 住宅電器管線(xiàn)及衛(wèi)生間、浴室的防水施工 隨著人們的生活水平的提高,住宅內(nèi)的電視機(jī)、錄像機(jī)、空調(diào)機(jī)、電冰箱、微波爐等家用電器種類(lèi)日益增多,大大地增加了居室內(nèi)的用電量,住宅裝修中的電器管線(xiàn)能否規(guī)范化施工,直接影響到這些家用電器的使用壽命及居室內(nèi)生命財(cái)產(chǎn)的安全。在電器管線(xiàn)施工中,電器、電料的包裝應(yīng)完好;塑料電線(xiàn)保護(hù)管及接線(xiàn)盒必須是阻燃型產(chǎn)品,外觀(guān)不應(yīng)有破損及變形;金屬電線(xiàn)保護(hù)管及接線(xiàn)盒外觀(guān)不應(yīng)有折扁和裂縫,管內(nèi)應(yīng)無(wú)毛刺、管口應(yīng)平整;通信系統(tǒng)使用的終端盒、接線(xiàn)盒與配電系統(tǒng)的開(kāi)關(guān)、插座,宜選用同一系列產(chǎn)品。電器管線(xiàn)的施工質(zhì)量必須達(dá)到國(guó)家現(xiàn)行施工規(guī)范和質(zhì)量驗(yàn)收標(biāo)準(zhǔn)。才能保證以后家用電器的安全和使用。 衛(wèi)生間及浴室的防水問(wèn)題是家庭裝修施工中普遍存在的。一般住宅土建設(shè)計(jì)中的衛(wèi)生間沒(méi)有浴室功能,只是做一般的防水處理,現(xiàn)在大多數(shù)家庭都在衛(wèi)生間內(nèi)增加了淋浴這一功能,再加上二次裝修施工中對(duì)原防水層的破壞性影響,因而樓上淋浴樓下漏水的民事糾紛時(shí)常發(fā)生。

篇5

關(guān)鍵詞:內(nèi)隔墻保溫;?;⒅楸厣皾{;施工

中圖分類(lèi)號(hào): TU71文獻(xiàn)標(biāo)識(shí)碼: A

一、施工準(zhǔn)備:

1、材料要求:?;⒅楸厣皾{由玻化微珠(VMB)、水泥及外加劑組成的單組分干混型高性能無(wú)機(jī)墻體保溫材料,有效改善室內(nèi)熱環(huán)境。保溫系統(tǒng)由保溫隔熱層和抗裂防護(hù)層兩部分組成,其中保溫隔熱層采用?;⒅椋ㄓ苫鹕饺蹘r礦物材料經(jīng)過(guò)加熱膨脹、?;鋮s制成的表面?;忾]、內(nèi)部多孔的不規(guī)則球狀體顆粒)做輕骨料,預(yù)拌在干粉改性劑中,形成單組份無(wú)機(jī)干混料保溫砂漿,現(xiàn)場(chǎng)加水?dāng)嚢杓纯墒褂茫芍苯幽ㄓ趪o(hù)結(jié)構(gòu)上。

2、主要機(jī)具:350立式砂漿攪拌機(jī)或手提電動(dòng)攪拌器,手推車(chē)、抹灰桶、水桶、木抹子、鋼抹子、掃帚、2m靠尺、經(jīng)緯儀、低壓照明燈等設(shè)備。

3、作業(yè)條件:

3.1 施工部位的基層墻體已經(jīng)有關(guān)部門(mén)檢查驗(yàn)收合格。

2.2 施工現(xiàn)場(chǎng)的環(huán)境溫度及基層墻體的表面溫度不得低于5℃。

2.3 室內(nèi)門(mén)框、預(yù)埋件、雨水管卡、各種設(shè)備管道等項(xiàng)目均應(yīng)施工完畢,并預(yù)留出外保溫層的厚度,縫隙應(yīng)按規(guī)定嵌塞。

2.4 夜間作業(yè)時(shí),應(yīng)設(shè)置充分的照明設(shè)施以保證操作的需要。

二、施工工藝:

1、工藝流程:

基層處理灑水濕潤(rùn)吊垂直、套方、彈灰餅控制線(xiàn)涂刷界面砂漿抹灰餅、沖筋玻化微珠保溫砂漿的配制抹?;⒅楸厣皾{保溫層驗(yàn)收抹罩面砂漿。

2、操作方法

2.1基層處理:

2.1.1應(yīng)將基層表面的浮塵、油污、隔離劑及墻角雜物清理干凈,墻體表面凸起物≥10mm應(yīng)鏟平,再用軟刷清掃干凈。

2.1.2 門(mén)、窗框四周應(yīng)用保溫砂漿分層填塞密實(shí),保溫層包裹窗框尺寸控制在10~20mm。

2.1.3混凝土墻體與其它砌體材料交接處應(yīng)掛鋼絲網(wǎng)或耐堿玻纖網(wǎng),兩側(cè)搭接寬度應(yīng)不小于100mm,用水泥釘固定。

2.2 吊垂直線(xiàn)、套方找規(guī)矩、彈灰餅控制線(xiàn):拉垂直、水平通線(xiàn),按厚度線(xiàn)用保溫砂漿做標(biāo)準(zhǔn)厚度灰餅沖筋,根據(jù)保溫層厚度要求彈出抹灰控制線(xiàn),保證抹灰最薄位置達(dá)到設(shè)計(jì)厚度,以有效阻止室內(nèi)外熱傳遞,從而達(dá)到節(jié)能設(shè)計(jì)要求。同時(shí)應(yīng)注意灰餅厚度不得過(guò)大,以免因保溫層過(guò)厚產(chǎn)生空鼓、裂縫、脫落以及增加建筑負(fù)荷等缺陷,且造成材料用量和施工成本不必要的增加。

2.3 灑水濕潤(rùn):抹灰的前一天應(yīng)將基層墻面進(jìn)行灑水濕潤(rùn)。

2.4 涂刷界面砂漿:

2.4.1 界面砂漿的配制:當(dāng)產(chǎn)品使用說(shuō)明有要求時(shí),按產(chǎn)品使用說(shuō)明所要求的比例進(jìn)行配制;無(wú)要求時(shí),按界面劑:中細(xì)砂(干):水泥的質(zhì)量比為1:1:1的比例進(jìn)行配制,先加入界面劑,再加入中細(xì)砂和水泥,拌合均勻成漿狀。

2.4.2 涂刷界面砂漿:用滾刷或掃帚蘸取界面砂漿均勻涂刷于基層為砼的墻面上,不得漏刷,拉毛不宜太厚,必須保證所有的砼墻面都做到毛面處理。配好的料注意防曬避風(fēng),一次配制量應(yīng)在可操作時(shí)間內(nèi)用完。

2.5 抹灰餅、標(biāo)筋:貼餅沖筋:根據(jù)控制線(xiàn)在門(mén)口、墻角用線(xiàn)墜、方尺、拉通線(xiàn)等方法貼灰餅,用托線(xiàn)板找好垂直。應(yīng)采用?;⒅楸貪{料預(yù)制塊或直接用稍干的?;⒅楸貪{料成型50mm見(jiàn)方,(不得采用水泥砂漿作灰餅與沖筋,以免形成熱橋),水平距離約為1.2~1.5m左右。門(mén)窗口、垛角也必須補(bǔ)貼灰餅,上下灰餅應(yīng)保證在同一條垂直線(xiàn)上。根據(jù)灰餅厚度用相同的保溫砂漿拌合料沖筋(標(biāo)筋),沖筋的根數(shù)應(yīng)根據(jù)房間的高度或?qū)挾葋?lái)決定,筋寬約為100mm左右為宜。沖筋時(shí)上下兩灰餅中間分兩次抹成凸八字形,比灰餅高出5~10mm,然后用刮杠緊貼灰餅搓平。墻面高度小于3.5m時(shí),宜充立筋;大于3.5米,宜充橫筋。

2.6 ?;⒅楸厣皾{的配制:按料漿需用水:干粉料的質(zhì)量比為(0.85~1.1):1的比例配制,先將水加入到攪拌容器中,再將?;⒅楸厣皾{干粉料加入到攪拌器中,攪拌3~5min(分鐘),使料漿成均勻膏狀體。料漿應(yīng)隨拌隨用,配制好的料漿應(yīng)在1h內(nèi)用完,不得回收落地料二次加水使用。施工中應(yīng)按每個(gè)檢驗(yàn)批制作不少于3組的同條件養(yǎng)護(hù)試件,檢測(cè)保溫砂漿導(dǎo)熱系數(shù)、干密度和壓縮強(qiáng)度。保溫砂漿的同條件養(yǎng)護(hù)試件應(yīng)見(jiàn)證取樣送檢。

2.7抹?;⒅楸厣皾{ :?;⒅楸厣皾{應(yīng)在界面砂漿干燥固化前分遍成活。

1) 第一遍抹灰:應(yīng)在涂刷界面砂漿后的基層墻體上,用配好的?;⒅楸厣皾{壓抹,抹灰厚度不宜大于 20mm,使砂漿均勻密實(shí)覆蓋墻壁面。?;⒅楸厣皾{抹上墻與墻粘住后,不宜反復(fù)趕壓,只做到粘結(jié)牢固即可。

2) 第二遍抹灰:當(dāng)抹灰厚度大于20mm 時(shí),應(yīng)分遍抹涂。待上一遍抹灰硬化后即可進(jìn)行下一遍抹灰,最后一遍抹灰厚度應(yīng)達(dá)到灰餅、沖筋的厚度,用大杠搓平,門(mén)窗、洞口垂直度、平整度達(dá)到規(guī)范規(guī)定要求后,再在表面進(jìn)行找平壓實(shí)。保溫層兩遍施工時(shí)間間隔不小于24小時(shí)。

2.8 保溫層驗(yàn)收:抹完保溫層后,用檢測(cè)工具進(jìn)行檢驗(yàn),保溫層應(yīng)垂直、平整、陰陽(yáng)角方正、順直,對(duì)不符合要求的墻面,應(yīng)進(jìn)行修補(bǔ)。

2.9抹粉刷石膏同時(shí)壓入耐堿網(wǎng)布:在保溫層固化干燥后(用手掌按不動(dòng)表面,一般約3天左右),用鐵抹子在保溫層上抹粉刷石膏,厚度3~4mm,不得漏抹。

四、注意事項(xiàng):

1、門(mén)窗邊框與墻體連接應(yīng)預(yù)留出保溫層的厚度,縫隙應(yīng)分層填塞密實(shí),并做好門(mén)窗框表面的保護(hù)。窗戶(hù)經(jīng)驗(yàn)收合格后方可進(jìn)行保溫抹灰施工,保溫抹灰厚度包裹住窗框宜為10mm,注意保溫面層到窗框內(nèi)側(cè)的距離一致。

2、在保溫漿料和抗裂砂漿配制時(shí),需專(zhuān)人專(zhuān)職攪拌,保證攪拌時(shí)間和加水量的準(zhǔn)確。在施工現(xiàn)場(chǎng)攪拌質(zhì)量可以通過(guò)觀(guān)察其可操作性、抗滑墜性、膏料狀態(tài)以及其濕表觀(guān)密度等方法判斷。

3、保溫面層平整度偏差不應(yīng)大于4mm,厚度宜以8~10mm 為宜,保溫面層抹灰時(shí),抹灰厚度應(yīng)略高于灰餅的厚度,而后用杠尺刮平,用抹子局部修補(bǔ)平整。

4、對(duì)于外墻外保溫系統(tǒng),玻化微珠保溫漿料嚴(yán)禁雨天施工,因當(dāng)天未干燥的?;⒅楸貪{料遇雨時(shí)會(huì)被沖落表層,即使未被沖落,保溫層的強(qiáng)度也會(huì)大大降低,表面出現(xiàn)浮漿,與抗裂砂漿粘結(jié)不牢,出現(xiàn)脫層現(xiàn)象。

5、罩面層的平整度控制首先要求保溫層的平整度達(dá)到標(biāo)準(zhǔn),達(dá)不到要求的應(yīng)先用保溫漿料找平;

篇6

首先要制定施工質(zhì)量目標(biāo),目標(biāo)展開(kāi)就和目標(biāo)實(shí)施中,中心環(huán)節(jié)是落實(shí)目標(biāo)責(zé)任和實(shí)施目標(biāo)責(zé)任。各專(zhuān)業(yè)、各工序都應(yīng)以質(zhì)量控制為中心進(jìn)行全方位管理,從各個(gè)側(cè)面發(fā)揮對(duì)工程質(zhì)量的保證作用,從而使工程質(zhì)量控制目標(biāo)得以實(shí)現(xiàn)。首先重要的是要在技術(shù)上做好管理工作。應(yīng)該熟悉施工圖紙,對(duì)每一道工序進(jìn)行優(yōu)化,同時(shí)考慮自身的資源(施工隊(duì)伍、材料供應(yīng)、資金、設(shè)備等)條件,認(rèn)真。合理地做好施工組織計(jì)劃。除了合理的施工組織計(jì)劃外,還必須在具體的施工工藝上做好技術(shù)準(zhǔn)備。對(duì)施工現(xiàn)場(chǎng)進(jìn)行條件檢查,應(yīng)符合施工要求。施工中包括技術(shù)管理人員、技術(shù)工人、施工規(guī)范,技術(shù)交底等工作,都要深入細(xì)致,確保施工過(guò)程的每一工序步驟盡在掌握之中,各種情況的處理準(zhǔn)備方案,保證能按時(shí)保質(zhì)地完成。其次,做好材料管理工作。材料的管理工作,應(yīng)該從材料供應(yīng)、材料采購(gòu)、材料進(jìn)場(chǎng)、材料發(fā)放等幾方面進(jìn)行。第三,做好人員管理工作。施工人員對(duì)工程項(xiàng)目的質(zhì)量和進(jìn)度起著關(guān)鍵的作用。施工隊(duì)伍中的技術(shù)管理人員和技術(shù)工人密不可分,堅(jiān)持以人為本,可以培養(yǎng)施工隊(duì)伍的凝聚力。同時(shí)又必須明確施工隊(duì)伍的管理體制,各崗位職責(zé),權(quán)利明確,做到步調(diào)一致。

二、工程施工進(jìn)度控制

一是編制進(jìn)度計(jì)劃,在充分掌握工程量及工序的基礎(chǔ)上進(jìn)行。二是確定計(jì)劃工期。施工單位或人員應(yīng)參照工程規(guī)定工期,同時(shí)結(jié)合自己所能獲取的最大且合適的資源,以最終確定計(jì)劃工期。三是實(shí)時(shí)監(jiān)控進(jìn)度計(jì)劃的完成情況。謹(jǐn)防不按照計(jì)劃進(jìn)行施工,而應(yīng)適時(shí)監(jiān)控進(jìn)度計(jì)劃。正確的做法是及時(shí)總結(jié)工程進(jìn)度,監(jiān)控其是否與計(jì)劃有偏差,尋找原因,落實(shí)到位。四是應(yīng)盡量減少趕工期。監(jiān)理人員應(yīng)按合同要求,進(jìn)行工程量計(jì)量驗(yàn)收,及時(shí)為工程進(jìn)度款的支付簽署進(jìn)度、計(jì)量方面的認(rèn)證意見(jiàn)。

三、施工成本管理控制

項(xiàng)目施工中要最大限度地減少成本,而成本在施工當(dāng)中是可控制的,因此成本控制是室內(nèi)覆蓋系統(tǒng)工程施工管理的關(guān)鍵工作。

(一)根據(jù)市場(chǎng)價(jià)格編制施工定額

依據(jù)建設(shè)工程施工合同、國(guó)家現(xiàn)行法律和規(guī)定、通信工程概(預(yù))算定額及取費(fèi)標(biāo)準(zhǔn)實(shí)施造價(jià)控制,對(duì)工程費(fèi)用實(shí)行定額。施工定額要求成本最低化,同時(shí)還應(yīng)注意降低成本的合理性。施工定額還應(yīng)根據(jù)市場(chǎng)價(jià)格的變動(dòng),經(jīng)常地進(jìn)行調(diào)整。

(二)全面成本控制原則

成本控制應(yīng)是室內(nèi)覆蓋系統(tǒng)施工全過(guò)程的控制和全員控制,成本控制人人有責(zé)。

(三)動(dòng)態(tài)控制原則

室內(nèi)覆蓋系統(tǒng)施工項(xiàng)目的成本控制應(yīng)從項(xiàng)目施工的開(kāi)始一直到結(jié)束。在施工前,應(yīng)確定成本控制目標(biāo);在施工中,應(yīng)對(duì)成本進(jìn)行實(shí)時(shí)控制,及時(shí)校正偏差;在施工結(jié)束后,對(duì)成本控制的情況進(jìn)行總結(jié)。

(四)目標(biāo)管理原則

室內(nèi)覆蓋系統(tǒng)工程項(xiàng)目施工開(kāi)始前,應(yīng)對(duì)項(xiàng)目施工成本控制確立目標(biāo)。目標(biāo)的確定應(yīng)注意其合理性,目標(biāo)太高則易造成浪費(fèi),太低又難以保證質(zhì)量。如果目標(biāo)成本確定合理,項(xiàng)目施工的實(shí)際成本就應(yīng)該與目標(biāo)成本相差不多。

篇7

洗髓一經(jīng),即本仙家伐毛洗髓之意,其高深?yuàn)W妙超乎一切武功,不易領(lǐng)悟,且其原本早已失傳。世間即有此書(shū),皆人搜集道藏附會(huì)而成,牽蘿補(bǔ)屋,故不見(jiàn)其能收若何效果也。

唯易筋一經(jīng),少林門(mén)中猶有傳法,并未泯滅。易筋一經(jīng),實(shí)傳自達(dá)摩禪師,此功練成之后即能運(yùn)柔成剛,以御外侮。所謂易筋者,非真能將人體之經(jīng)絡(luò)取出而換以堅(jiān)強(qiáng)之筋,猶言練此功夫日久之后,即可使筋骨堅(jiān)強(qiáng),勝于未練之時(shí),如脫胎換骨。易筋者,比喻之辭也。

1第一式

面向東方而立,兩足分開(kāi),中間相距約一尺開(kāi)闊。足之位置須趾與跗同一方向,切忌踏成八字形。凝神調(diào)息,摒除一切雜念,鼓氣于腹,毋使走泄。頭部向上微昂,口宜緊閉,牙齒相接,舌尖舔住牙關(guān),兩目向前睜視,睛珠須定,不可稍有啟閉。

然后,將兩手折腕昂起,使掌心向下,指尖向前,再緩緩屈其肘節(jié),將手提起少許,至腰部稍下處為度。唯兩手雖上提,而兩臂之氣力必須下注,如按桌踴身之狀。

略加停頓之后,乃將十指運(yùn)力,向上翹起,而掌根則運(yùn)力捺下。行時(shí)須極徐緩,至極度后再停頓片刻,乃放下手指,提起掌根,回復(fù)原狀。

如此一翹一按,是為一度,徐行四十九度,而第一式功夫完畢。

2第二式

行前式功夫既畢之后,則將氣力收起,復(fù)平常小立狀態(tài),使全身筋骨稍為舒展,以免過(guò)勞之弊。其休息之時(shí)間則不必限定。

行第二式時(shí),先將兩足緊并,全身正立,鼓氣閉口,突視昂首,與第一式完全相同。

兩手則將指屈轉(zhuǎn)握拳,唯大指伸直。此時(shí)握拳極松,不可用力。握定之后,則將拳移置于大腿之前面,拳心與腿面相貼,兩大指則遙遙相對(duì)。至此略略停頓,之后即將每手之大指向上翹起,以至極度;同時(shí),兩手之其余四指則用力緊握,務(wù)用全力。而兩臂之力則須下注,切不可有絲毫提勁。

略停片刻之后,兩大指即徐徐放下,余指也慢慢松開(kāi)以復(fù)原狀。兩臂則宜用提勁,使氣力上收。

如此,一緊一松為一度。行時(shí)宜凝神注氣,專(zhuān)心一志。行四十九度,第二式功夫畢矣。

3第三式

行第二式功夫既畢之后,略事休息,再續(xù)行第三式。

此式正立如前,先將兩足分開(kāi),中間距離約一尺左右,務(wù)須趾與跗成平線(xiàn),忌作八字形。腿部宜運(yùn)力下注,不可使稍有松浮,否則身體易搖動(dòng),而至神氣渙散也。頭昂目睜,口閉牙接,鼓氣腹中,與上二式同。

兩手則將大指先屈置掌心,余四指則緊握大指之外面。兩臂垂直,雙拳置大腿之兩側(cè),拳心貼腿,拳背向外,臂部并不用力,拳亦握得極松。略略停頓之后,即將兩拳緩緩握緊,至極度為止。同時(shí),運(yùn)力于臂使之下注,即用力將兩臂挺直,使肘節(jié)突出,而氣力易達(dá)于指掌之間也。

略停片刻后,徐徐放松拳指,回復(fù)原狀。

如此,一緊一松為一度,共行四十九度,而第三式功夫畢收。

4第四式

行第三式功夫既畢之后,休息片刻以舒展筋骨,然后再續(xù)行第四式。

此式與以上各式不同。先全身正立,兩足緊并,用足兩腿之氣力下注,以固下盤(pán)。然后,將兩大拇指屈置掌中,而以余指屈置其外,握之成拳。

兩拳由前面向上舉起,以平肩為度,拳心相對(duì),虎口向上,兩拳間之距離則與肩膀之闊度相等。在上舉之時(shí),兩臂宜直,上身切忌動(dòng)搖。

略略停頓,即運(yùn)力將拳緊緊握攏以至極度,而兩臂同時(shí)向前伸去,位置雖不能伸前若干,但氣力則完全前注。

停頓片刻,則將拳放松,收回兩臂之伸勁。在伸出時(shí),切忌左右宕動(dòng)。

如此,一握一松為一度,共行四十九度,第四式功夫既畢矣。

5第五式

行第四式功夫畢,略事休息,更續(xù)行此第五式。

全身正立,兩足緊并,昂頭緊目,閉口咬齒,凝神鼓氣,如第一式之形狀。

將兩手松拳,甚松,翻掌向外,徐徐從兩旁舉起,豎于頭之上面,拳心相向,虎口相后,肘節(jié)微彎,兩臂須離開(kāi)耳際一寸處,切不可緊貼。在兩臂上舉時(shí),兩足即隨之踮起,兩踵離地一寸左右為度。

略略停頓片刻,乃將兩拳緊緊一握,兩臂則蓄力向下挫,似拉住鐵杠,將身上收之狀,同時(shí),兩踵再乘勢(shì)向上舉起,至極度而止。停頓片刻之后,再將兩拳徐徐放松,收回氣力,兩踵亦緩緩放下,仍至離地一寸左右為度。

如此,一起一落為一度,共行四十九度,而第五式功夫畢矣。

6第六式

行第五式功夫既畢,略事休息,然后再續(xù)行第六式。

全身正立,昂首睜目,閉口鼓氣如前。先將兩足分開(kāi),相距一尺左右,趾踵須成平行線(xiàn),切不可踏成八字式,因八字式力不專(zhuān)注,且易動(dòng)搖也。

兩手則將大拇指放在外面,以余四指握拳,再將拇指放于指節(jié)之外。握時(shí)亦須松弛,不可過(guò)緊。然后兩臂從旁側(cè)舉起,拳心向上,至臂平直時(shí),更屈轉(zhuǎn)肘節(jié),引肱豎起,至拳面適對(duì)兩耳,全臂成三角形。拳以離耳一寸許為度,拳心則向肩尖。

篇8

前言:裝飾飾面項(xiàng)目是室內(nèi)外裝飾的重要構(gòu)成部分, 隨著國(guó)內(nèi)房地產(chǎn)行業(yè)的繼續(xù)升溫,室內(nèi)裝飾項(xiàng)目也愈來(lái)愈火熱,做為一個(gè)服務(wù)行業(yè),室內(nèi)裝飾項(xiàng)目必須要跟隨時(shí)代的步伐,提升項(xiàng)目的施工技術(shù),增強(qiáng)施工質(zhì)量,同時(shí)學(xué)會(huì)節(jié)省屋主的裝飾本錢(qián)費(fèi)用。

1、室內(nèi)裝飾工程施工的基本特征 室內(nèi)裝飾主要是對(duì)建筑空間內(nèi)的墻體、地面、吊裝、用電用水、細(xì)部等實(shí)施科學(xué)部署和施工,有些人簡(jiǎn)便地把其看成是室內(nèi)裝飾品的部署,是一種改善視覺(jué)環(huán)境的工具。當(dāng)然,這是室內(nèi)裝飾的根本工作之一,但并不單單是這樣。盡管室內(nèi)裝飾項(xiàng)目周期相對(duì)較短,卻對(duì)項(xiàng)目組織設(shè)計(jì)和施工提出了更高的需求,既要確??茖W(xué)性、適當(dāng)性,又要確保能操作性,才可以保障項(xiàng)目的施工質(zhì)量與效果。為了做到這一點(diǎn),下面總結(jié)分析了室內(nèi)裝飾施工的基本特征。 第一,一種對(duì)很多工種一起施工的體系組織管理的工具實(shí)室內(nèi)裝飾施工管理;第二,項(xiàng)目負(fù)責(zé)人作為室內(nèi)裝飾施工的組織者與指揮者,確保施工質(zhì)量的同時(shí)也要正確掌握室內(nèi)裝飾施工的全體效果;第三,施工組織設(shè)計(jì)的適當(dāng)性和科學(xué)性,還有施工人員技術(shù)水平的高低和室內(nèi)裝飾項(xiàng)目的施工質(zhì)量與結(jié)果有著緊密關(guān)系;第四,雖然項(xiàng)目量不大,周期不長(zhǎng),但是因?yàn)闋可娴膬?nèi)容相對(duì)復(fù)雜、工種相對(duì)較多,變得施工組織管理工作多而繁雜,需要工作人員具備比較高的管理領(lǐng)導(dǎo);等等。

2、室內(nèi)裝飾工程工藝流程

室內(nèi)裝飾項(xiàng)目最傳統(tǒng)的施工工序通常為兩個(gè)方案:方案一:安裝管道工程―木作項(xiàng)目―頂棚項(xiàng)目―墻面項(xiàng)目―地面項(xiàng)目―油漆項(xiàng)目―安裝電器工程。方案二:安裝管道工程―頂棚項(xiàng)目―墻面項(xiàng)目―地面項(xiàng)目―木作項(xiàng)目―油漆項(xiàng)目―安裝電器工程。

3、室內(nèi)裝飾工程工藝流程中存在的問(wèn)題

3.1 美觀(guān)問(wèn)題

傳統(tǒng)的2種安裝項(xiàng)目有時(shí)需要穿插實(shí)行。但是,這2種施工方案對(duì)室內(nèi)裝飾項(xiàng)目而言非常不利,并影響裝飾結(jié)果,主要因素:1.室內(nèi)裝飾項(xiàng)目屬于高級(jí)裝飾,油漆使用高級(jí)清漆的比較多,為了突出木紋本色的目的,這些材料受污染或磨損后,不好清洗與修復(fù)。比如:膠合板受水泥漿、膩?zhàn)踊蛉槟z漆污染后很難沖洗干凈,再用清漆油漆后,污漬會(huì)永久留下,影響美觀(guān)。如果先油漆后再解決墻面與地面,污染的油漆面清洗以后又會(huì)影響油漆面的光亮度,一樣影響美觀(guān)結(jié)果。

3.2 安全問(wèn)題

實(shí)際顯示,裝飾項(xiàng)目施工經(jīng)過(guò)中盲目追求美觀(guān)性,忽視了應(yīng)用的安全性,局部行為或者工序嚴(yán)重?fù)p壞了住宅的全體構(gòu)造,對(duì)應(yīng)用者的生命財(cái)產(chǎn)造成了威脅。住宅的全體結(jié)構(gòu)承擔(dān)著住宅本體的重量與其他方面的荷載,相等于認(rèn)得骨架。而住宅內(nèi)裝飾不免對(duì)之前的建筑構(gòu)造實(shí)行相應(yīng)的改造,牽涉到墻面、地面和頂面鉆孔以及打眼開(kāi)槽等工序,大則要拆墻或房間重組,門(mén)窗與吊頂重裝等工序,這將非常容易造成鋼筋構(gòu)件被切斷,從而影響住宅應(yīng)用的安全。還有,不好的裝飾施工材料將在將來(lái)建筑試用經(jīng)過(guò)中埋下龐大的安全隱患,像吊式安裝的電器,選取不好的吊碼特別容易造成吊碼松掉從高空墜地。

保護(hù)好住宅的全體構(gòu)造與每個(gè)部件是住宅內(nèi)裝飾項(xiàng)目施工的基本與前提。依據(jù)住宅設(shè)計(jì)時(shí)全體構(gòu)造的荷載力來(lái)安置裝飾材料的總體重量,同時(shí)科學(xué)適當(dāng)部署裝飾材料的附重,盡量維持其在住宅全體構(gòu)造上的平衡狀態(tài);把墻體、梁、板、柱子等構(gòu)件保護(hù)好,不可以在住宅的承重墻與剪刀墻上同時(shí)打電纜槽與水管槽,也不可以在梁柱板上同時(shí)打孔與鑿洞,不然將把梁板柱等構(gòu)建的荷載力降低,把住宅使用的安全性破壞。其它,對(duì)于高層住宅建筑來(lái)說(shuō),地面裝飾層不論是用鋪地磚還是花崗巖都不可以太厚,影響整棟住宅試用的安全系數(shù)。也要嚴(yán)加考慮材料的防火性能,輕鋼龍骨與石膏板等阻燃材料盡可能試用。

3.3 污染問(wèn)題

裝飾材料污染住宅內(nèi)居住環(huán)境則變成現(xiàn)在住宅裝飾的一般問(wèn)題,塑料、化纖、油漆、粘膠劑等裝飾材料的試用為人們供應(yīng)了龐大的方便,而且成功滿(mǎn)足了人們對(duì)住宅裝飾美觀(guān)性的需求,并且嚴(yán)重影響了室內(nèi)的空氣質(zhì)量,人們?cè)谶@類(lèi)剛剛裝飾好的住宅內(nèi)居住時(shí)間長(zhǎng)了會(huì)出現(xiàn)惡心、頭暈、喉嚨發(fā)干等一連串不良反應(yīng),主要是由于材料發(fā)散出的有害的化學(xué)物質(zhì),讓人感到不適。經(jīng)常夏季室內(nèi)空氣污染更加嚴(yán)重,主要是因?yàn)橄募咎叩臍鉁?、低氣壓、大的濕度,加上人們,房間內(nèi)一般應(yīng)用空調(diào),封閉相對(duì)嚴(yán)實(shí)點(diǎn),導(dǎo)致室內(nèi)空氣換氣率低。施工中必須要留意每天窗多開(kāi)來(lái)通風(fēng),條件許可,要入住最好是等夏季的有害氣體釋放期以后。

4、室內(nèi)裝飾施工技術(shù)工藝的質(zhì)量控制

4.1強(qiáng)弱電管線(xiàn)施工技術(shù)需求

跟著社會(huì)的進(jìn)步,提高的生活水平,家用電器類(lèi)別日益加多,大大地加大了居室內(nèi)的用電量,對(duì)住宅裝飾中的強(qiáng)弱電管線(xiàn)一定要實(shí)行標(biāo)準(zhǔn)化施工。一定要依設(shè)計(jì)圖紙與國(guó)家規(guī)范標(biāo)準(zhǔn)施工。

明管敷設(shè)時(shí)線(xiàn)全長(zhǎng)超過(guò)下面長(zhǎng)度時(shí),其中間位置設(shè)過(guò)渡盒:

①管子全長(zhǎng)超過(guò)45m時(shí)無(wú)彎曲。

②管子全長(zhǎng)超過(guò)3om時(shí)有1個(gè)彎頭。

③管子全長(zhǎng)超過(guò)20m時(shí)有2個(gè)彎頭。

④管子全長(zhǎng)超過(guò)12m時(shí)有3個(gè)彎頭。

明管敷設(shè)時(shí),要隨之給予穩(wěn)固,不可以采用暫時(shí)墊吊的方法,管長(zhǎng)距離不能超過(guò)標(biāo)準(zhǔn)規(guī)定。管線(xiàn)的質(zhì)量一定要達(dá)到國(guó)家施工標(biāo)準(zhǔn)與質(zhì)量驗(yàn)收規(guī)范,這樣才可以確保以后家用電器的安全應(yīng)用。

4.2天花的吊頂技術(shù)需求

建筑室內(nèi)裝飾施工中的天花處理很多都是使用簡(jiǎn)單大方的抹灰平頂,不多數(shù)面積較大的客廳能做輕鋼龍骨石膏板異形吊頂。廚房、衛(wèi)生間的天花應(yīng)用防潮結(jié)果較好的塑料扣板、金屬扣板做為吊頂主材比較一般。這類(lèi)吊頂、吊桿不可以彎曲,不然會(huì)影響吊頂?shù)钠秸5鯒U距離在lm左右,不可以超過(guò)1.2m,靠墻的間距不可以超過(guò)40mm。依據(jù)上面原則定出龍骨與吊桿的部位并線(xiàn)彈到樓板上。

線(xiàn)彈好后就先安裝封口材,木方沿墻標(biāo)高水平線(xiàn)使用30mm×30mm,用鋼針或射釘固到墻體上并確保鋼釬進(jìn)入墻體20mm左右,封口木條不可以有任何松動(dòng)。主龍骨安裝時(shí)先把主龍骨用吊掛件接連在吊桿上,螺絲擰緊卡牢,8.Omm×8O0mm之間為主龍骨距離。6O0mm×6O0mm為付龍骨距離。

4.3室內(nèi)掃膩?zhàn)尤槟z漆的技術(shù)要求

掃乳膠漆,需對(duì)固板的釘頭、螺絲檢驗(yàn)一遍,凸出板面的要改正成略沉人板面,并所有涂防銹漆。夾板面先涂1到2遍光油來(lái)避免木材油脂滲出和作防潮保護(hù)層。板面前期解決工作結(jié)束后,用油性膩?zhàn)忧短畎蹇p,并用沙布把板縫和工作面內(nèi)全部明角的部位粘貼妥當(dāng)之后才全面抹底層灰。

縫隙孔眼注入低粘度的環(huán)氧樹(shù)脂讓其固結(jié)。有裂縫的基層時(shí),要把裂縫鑿成“v”形縫口,整理清潔后先把底層涂料在縫隙涂一道,之后嵌填密封防水材料,表面再用合成樹(shù)脂或水泥聚合物膩?zhàn)幽ㄆ讲⒋蚰テ秸?/p>

總結(jié) 室內(nèi)裝飾是一門(mén)綜合性很強(qiáng)的學(xué)科,牽涉到社會(huì)學(xué)、心理學(xué)、環(huán)境學(xué)等幾種學(xué)科,還有許多東西需要去探討與研究。希望可以與同行們一起探討。

參考文獻(xiàn)

篇9

關(guān)鍵詞:渠道;內(nèi)邊坡;抗滑樁;施工工藝

中圖分類(lèi)號(hào):U213文獻(xiàn)標(biāo)識(shí)碼: A

1、設(shè)備選擇

通過(guò)對(duì)相鄰標(biāo)段已開(kāi)始進(jìn)行的抗滑樁施工進(jìn)行了全面的了解,同時(shí)對(duì)目前設(shè)計(jì)下發(fā)的施工圖紙進(jìn)行了深入研究,結(jié)合現(xiàn)場(chǎng)施工情況,決定工程施工7標(biāo)渠道內(nèi)坡加固抗滑樁施工采用GPS型反循環(huán)回轉(zhuǎn)鉆機(jī)鉆孔施工,采用泥漿護(hù)壁。

2施工準(zhǔn)備

2.1技術(shù)準(zhǔn)備

(1)開(kāi)工前技術(shù)邀請(qǐng)?jiān)O(shè)計(jì)人員對(duì)抗滑樁施工部位的地質(zhì)情況進(jìn)行描述,及時(shí)組織對(duì)施工圖紙進(jìn)行會(huì)審,并對(duì)相關(guān)人員進(jìn)行技術(shù)交底。

(2)及時(shí)對(duì)施工現(xiàn)場(chǎng)環(huán)境和鄰近區(qū)域內(nèi)的地上地下管線(xiàn)(高壓線(xiàn)、管道、電纜)、地下構(gòu)筑物、危險(xiǎn)建筑進(jìn)行詳細(xì)調(diào)查,同時(shí)對(duì)實(shí)際地質(zhì)情況與設(shè)計(jì)地質(zhì)情況進(jìn)行對(duì)比,并及時(shí)將對(duì)比結(jié)果上報(bào)監(jiān)理和設(shè)計(jì)。提前做好準(zhǔn)備工作,確保不影響現(xiàn)場(chǎng)的施鉆及其它工作。

(3)施工前及時(shí)對(duì)主要施工機(jī)械及其配套設(shè)備的技術(shù)性能進(jìn)行了解,確保其在施工過(guò)程中平穩(wěn)運(yùn)行。

(4)及時(shí)組織所需材料進(jìn)場(chǎng)并檢驗(yàn),及時(shí)進(jìn)行配合比試驗(yàn)。

(5)施工前對(duì)工程地質(zhì)情況尤其是對(duì)渠道抗滑樁施工部位的地質(zhì)特性進(jìn)行必要的研究,對(duì)鉆孔過(guò)程中可能會(huì)遇到的問(wèn)題及突發(fā)事件采取針對(duì)性的措施及應(yīng)急處理方案。

2.2機(jī)械設(shè)備準(zhǔn)備

根據(jù)現(xiàn)場(chǎng)施工要求,安排性能好的機(jī)械設(shè)備進(jìn)場(chǎng),對(duì)進(jìn)場(chǎng)機(jī)械操作工人進(jìn)行培訓(xùn),并對(duì)進(jìn)場(chǎng)設(shè)備進(jìn)行必要的維護(hù)與保養(yǎng),以保證設(shè)備正常運(yùn)轉(zhuǎn)。

2.3測(cè)量準(zhǔn)備

依據(jù)測(cè)量控制網(wǎng),組織測(cè)量人員對(duì)樁位進(jìn)行精確放樣。

2.4試驗(yàn)準(zhǔn)備

做好開(kāi)工前的鋼筋、水泥、砂以及碎石等材料的檢測(cè)工作,進(jìn)行相關(guān)的原材料及混凝土配合比試驗(yàn)工作,并將相關(guān)成果報(bào)監(jiān)理工程師批準(zhǔn)。

2.5物資材料準(zhǔn)備

按照施工設(shè)計(jì)圖的相關(guān)內(nèi)容做好鋼材、水泥、地材等的準(zhǔn)備工作,并按質(zhì)量保證體系對(duì)合格材料供應(yīng)方進(jìn)行評(píng)價(jià),簽訂長(zhǎng)期的供貨合同,保證物質(zhì)材料按使用計(jì)劃供應(yīng),滿(mǎn)足正常施工需要。

2.6施工道路

根據(jù)施工場(chǎng)地的需要,抗滑樁施工主要運(yùn)輸設(shè)備為混凝土罐車(chē)、平板車(chē)及汽車(chē)吊,道路為左右岸沿渠路與渠道內(nèi)碎石鋪的臨時(shí)下工作平臺(tái)道路。

2.7 施工場(chǎng)地布置

(1)由于回旋鉆機(jī),鉆桿高,自重大,在鉆機(jī)就位前需對(duì)場(chǎng)地要平整夯實(shí),保證場(chǎng)地有一定硬度以免鉆機(jī)沉陷或傾斜。

(2)合理布置施工場(chǎng)地:保證回旋鉆機(jī)及其它的施工機(jī)械安全就位與材料運(yùn)輸,鉆渣的及時(shí)外運(yùn)。

(3)合理布置臨時(shí)用水、用電設(shè)施及泥漿池等其它設(shè)施,全面滿(mǎn)足施工工作的要求。

(4)根據(jù)設(shè)計(jì)圖紙所示的抗滑樁布置,在樁孔的施工順序安排上相鄰樁孔交替施工,以便減少鉆孔作業(yè)和混凝土灌注作業(yè)的相互干擾。

2.8工作平臺(tái)回填

抗滑樁圖紙到位時(shí)樁號(hào)45+950~46+550段土方開(kāi)挖已基本開(kāi)挖至渠底建基面,樁號(hào)51+800~52+100段渠道內(nèi)坡面改性土回填已基本完畢。根據(jù)設(shè)計(jì)圖紙要求,結(jié)合現(xiàn)場(chǎng)實(shí)際情況,在施工前先在以上兩段渠道內(nèi)坡左右岸分別回填一道頂寬5m的工作平臺(tái),平臺(tái)靠渠道中心線(xiàn)一側(cè)坡度按1:1.5控制(確保坡面穩(wěn)定即可),高度按抗滑樁設(shè)計(jì)頂高程控制?;靥钔劣?0t自卸車(chē)自附近土料場(chǎng)運(yùn)至,逐層回填碾壓,直至高度達(dá)到要求為止。

2.9測(cè)量放樣

采用GPS精確定位樁孔的位置,根據(jù)樁定位點(diǎn)拉十字線(xiàn)釘放四個(gè)控制樁,以四個(gè)控制護(hù)樁為基準(zhǔn)控制護(hù)筒的埋設(shè)位置和鉆機(jī)的準(zhǔn)確就位。護(hù)樁要做好保護(hù)工作,防止施工過(guò)程中被擾動(dòng)。

2.10鋼護(hù)筒制作及埋設(shè)

采用8mm鋼板卷制成2米鋼護(hù)筒,其內(nèi)徑比設(shè)計(jì)樁徑大0.2m,上下口加焊加勁環(huán)。護(hù)筒安裝時(shí),鉆機(jī)操作手利用擴(kuò)孔器將樁孔擴(kuò)大,之后通過(guò)大扭矩鉆頭將鋼護(hù)筒壓入設(shè)計(jì)標(biāo)高。護(hù)筒壓入前及壓入后,通過(guò)靠在護(hù)筒上的精確水平儀調(diào)整護(hù)筒的垂直位置。護(hù)筒頂一般高于原地面0.5 m,以便鉆頭定位及保護(hù)樁孔。

2.11鉆機(jī)就位

鉆機(jī)就位時(shí),要事先檢查鉆機(jī)的性能狀態(tài)是否良好。保證鉆機(jī)工作正常。通過(guò)測(cè)設(shè)的樁位準(zhǔn)確確定鉆機(jī)的位置,并保證鉆機(jī)穩(wěn)定。調(diào)整鉆頭中心對(duì)準(zhǔn)樁位中心后方可開(kāi)始鉆孔作業(yè)。

3鉆進(jìn)成孔

3.1鉆進(jìn)

鉆孔可采用順次連續(xù)施工的方法。鉆孔開(kāi)始后,分班連續(xù)作業(yè),一次成孔。鉆進(jìn)時(shí)應(yīng)先慢后快,確認(rèn)地下是否有不利地層,如鉆進(jìn)正常,可適當(dāng)加大進(jìn)尺。在鉆孔過(guò)程中由專(zhuān)人定時(shí)進(jìn)行鉆孔記錄,注意土層變化,采取渣樣,判斷土層。選用優(yōu)質(zhì)粘土,可以摻入膨潤(rùn)土粉提高泥漿的粘度和膠體率,護(hù)筒內(nèi)泥漿頂面保持高出筒外水位1.5m以上,做好泥漿回收凈化,循環(huán)使用工作。為防止振動(dòng)使鄰孔壁坍塌以及影響鄰孔已澆筑砼凝固,采用隔孔跳打法進(jìn)行施工,提鉆后孔口加蓋防護(hù)。

3.2終孔

鉆孔達(dá)到設(shè)計(jì)深度后,必須核實(shí)地質(zhì)情況。通過(guò)鉆渣,與地質(zhì)柱狀圖對(duì)照,以驗(yàn)證地質(zhì)情況是否滿(mǎn)足設(shè)計(jì)要求。如與勘測(cè)設(shè)計(jì)資料不符,及時(shí)通知監(jiān)理工程師及現(xiàn)場(chǎng)設(shè)計(jì)代表進(jìn)行確認(rèn)處理。如滿(mǎn)足設(shè)計(jì)要求,立即對(duì)孔深、孔徑、孔型進(jìn)行檢查??咨罴俺猎穸葯z測(cè):成孔后,利用測(cè)繩測(cè)量孔深。確認(rèn)孔深滿(mǎn)足設(shè)計(jì)和規(guī)范要求后,報(bào)請(qǐng)監(jiān)理工程師驗(yàn)收,監(jiān)理工程師驗(yàn)收合格后,立即進(jìn)行下道工序。

3.3 清孔及檢測(cè)

當(dāng)孔底標(biāo)高達(dá)到設(shè)計(jì)要求后,采用抽漿清孔法清孔。經(jīng)監(jiān)理工程師檢查合格,及時(shí)進(jìn)行清孔,孔底清理緊接終孔檢查后進(jìn)行。清孔時(shí),應(yīng)隨時(shí)注意保持孔內(nèi)泥漿的漿面高程,以保證孔壁的穩(wěn)定。清孔后,用測(cè)繩再次檢測(cè)孔深。

4鋼筋籠制作及安裝

4.1鋼筋籠制作

(1)鋼筋籠的制作

①鋼筋的驗(yàn)收及管理

鋼筋應(yīng)具有出廠(chǎng)質(zhì)量證明書(shū)。進(jìn)場(chǎng)后按有關(guān)規(guī)定、批量、規(guī)格進(jìn)行抽樣檢查,并由檢查部門(mén)出具試驗(yàn)報(bào)告。對(duì)于需要焊接的材料還應(yīng)有焊接試驗(yàn)報(bào)告。確認(rèn)該批材料滿(mǎn)足設(shè)計(jì)、施工要求后,物資設(shè)備部方可將該材料入庫(kù)、登記、造冊(cè),不合格的材料應(yīng)運(yùn)出施工現(xiàn)場(chǎng)。

鋼筋進(jìn)庫(kù)后須按不同鋼種、等級(jí)、牌號(hào)、規(guī)格批號(hào)及生產(chǎn)廠(chǎng)家分別堆存,不得混雜,材料標(biāo)識(shí)清楚。鋼筋在運(yùn)輸、儲(chǔ)存過(guò)程中,應(yīng)避免銹蝕和污染。鋼筋宜堆置在倉(cāng)庫(kù)內(nèi),露天存放時(shí),應(yīng)下墊30cm高,上部加以遮蓋防雨布。

抗滑樁的鋼筋籠一次綁扎,整體吊裝就位。制作安裝時(shí)主筋接頭按規(guī)定錯(cuò)開(kāi)。鋼筋籠加工確保主筋位置準(zhǔn)確。鋼筋籠安裝時(shí)用專(zhuān)用的起吊工具起吊,起吊過(guò)程中避免鋼筋籠變形過(guò)大,不將偏斜、彎扭的鋼筋籠吊入鉆孔樁內(nèi)。安裝到位后及時(shí)固定,防止脫落及鋼筋籠在混凝土澆筑過(guò)程中上浮。

②鋼筋籠保護(hù)層

鋼筋籠主筋外緣至設(shè)計(jì)樁徑混凝土表面凈保護(hù)層厚度為70mm,在鋼筋籠周?chē)鷮?duì)稱(chēng)設(shè)置定位筋,間隔與加勁箍相等。

(2)鋼筋籠安裝

鋼筋籠運(yùn)至施工現(xiàn)場(chǎng)后采用25t汽車(chē)吊下放,為避免鋼筋籠發(fā)生吊裝變形,鋼筋籠頂口設(shè)置專(zhuān)用吊架,吊架結(jié)構(gòu)鋼筋籠下放到位時(shí)待上口吊筋對(duì)中后,再松鉤將吊筋掛于橫在護(hù)筒頂口的扁擔(dān)梁上,并將吊筋與扁擔(dān)梁、扁擔(dān)梁與護(hù)筒焊接固定,以防止?jié)沧⒒炷習(xí)r鋼筋籠的上浮和下沉。固定時(shí),要根據(jù)鋼護(hù)筒的偏位情況將鋼筋籠中心反方向調(diào)整,以使鋼筋籠中心與樁中心重合。鋼筋籠的施工順序?yàn)槠鸬跽幌路拧?/p>

5導(dǎo)管下放

5.1導(dǎo)管選擇

(1)采用專(zhuān)用300mm內(nèi)徑的螺旋絲扣導(dǎo)管,中間節(jié)長(zhǎng)2m,最下節(jié)長(zhǎng)4m,配 備0.5m、1m、1.5m非標(biāo)準(zhǔn)節(jié)。導(dǎo)管制作要堅(jiān)固、內(nèi)壁光滑、順直、無(wú)局部凹凸, 對(duì)于舊導(dǎo)管在試壓前應(yīng)通過(guò)稱(chēng)重的方式判定導(dǎo)管壁厚是否滿(mǎn)足使用要求。

(2)導(dǎo)管在使用前,除應(yīng)對(duì)其規(guī)格、質(zhì)量和拼接構(gòu)造進(jìn)行認(rèn)真地檢查外,應(yīng)進(jìn)行試拼和試壓,試壓導(dǎo)管的長(zhǎng)度應(yīng)滿(mǎn)足最長(zhǎng)樁澆筑需要,導(dǎo)管自下而上順序編號(hào)和節(jié)段長(zhǎng)度,且嚴(yán)格保持導(dǎo)管的組合順序,每組導(dǎo)管不能混用。導(dǎo)管組拼后軸線(xiàn)差,不宜超過(guò)鉆孔深的0.5%且不大于10cm。試壓壓力為孔底靜水壓力的1.5倍。檢查合格后方可使用。

(3)導(dǎo)管長(zhǎng)度應(yīng)按孔深和工作平臺(tái)高度決定。漏斗底至鉆孔上口段,宜使用非標(biāo)準(zhǔn)節(jié)導(dǎo)管。

(4)導(dǎo)管下放應(yīng)豎直、輕放、以免碰撞鋼筋籠。下放時(shí)要記錄下放的節(jié)數(shù),下放到孔底后,理論長(zhǎng)度與實(shí)際長(zhǎng)度進(jìn)行比較,是否吻合。

(5)下放導(dǎo)管到孔底后,經(jīng)檢查無(wú)誤后,輕輕提起導(dǎo)管,控制底口距離孔底不大于2m,并位于鉆孔中央。

5.2導(dǎo)管安裝

導(dǎo)管安裝時(shí)應(yīng)逐節(jié)量取導(dǎo)管實(shí)際長(zhǎng)度并按序編號(hào),做好記錄以便混凝土灌注過(guò)程中控制距混凝土面高度。并檢查橡皮圈是否安置和每個(gè)導(dǎo)管兩頭絲扣有無(wú)破絲等現(xiàn)象,以免灌注過(guò)程中出現(xiàn)導(dǎo)管脫離等現(xiàn)象

6混凝土灌注

6.1混凝土澆注設(shè)備

(1)導(dǎo)管及集料斗

根據(jù)現(xiàn)場(chǎng)實(shí)際情況選用0.8m³小料斗,保證能夠滿(mǎn)足混凝土澆注的需要。

(2)混凝土生產(chǎn)、輸送設(shè)備

根據(jù)實(shí)際情況,混凝土由附近營(yíng)地內(nèi)的混凝土拌和站集中拌制,6m³或12m³混凝土運(yùn)輸車(chē)運(yùn)輸,25t吊車(chē)提導(dǎo)管,混凝土經(jīng)溜槽及導(dǎo)管入樁。

6.2 混凝土配合比設(shè)計(jì)

樁身混凝土配合比設(shè)計(jì)通過(guò)試配確定,混凝土除滿(mǎn)足強(qiáng)度要求外,還須符合下列要求:

抗滑樁混凝土設(shè)計(jì)標(biāo)號(hào)為C30,采用P.042.5的水泥,并摻適量的外加劑及摻和料,以此控制混凝土的和易性使其滿(mǎn)足施工需要。

混凝土配合比坍落度控制在18~22cm(具體根據(jù)現(xiàn)場(chǎng)施工情況適當(dāng)調(diào)整)。

6.3 混凝土灌注

(1)控制灌注的樁頂標(biāo)高并保證混凝土強(qiáng)度,確保樁頭無(wú)松散層。

(2)灌注完混凝土后,應(yīng)及時(shí)將導(dǎo)管、漏斗等進(jìn)行清理和檢查,以備下次使用。

6.4 抗滑樁混凝土灌注應(yīng)注意的問(wèn)題

(1)混凝土運(yùn)抵灌注地點(diǎn)時(shí),應(yīng)檢查其和易性、坍落度等情況。坍落度應(yīng)控制在18-22cm。

(2)灌注開(kāi)始后,應(yīng)連續(xù)地灌注混凝土,并盡可能縮短拆除導(dǎo)管的間隔時(shí)間。

(3)混凝土灌注是一個(gè)完整、連續(xù)、不可間斷的工作。灌注工作開(kāi)始前,機(jī)械管理人員和司機(jī)應(yīng)對(duì)混凝土灌注所使用的全部機(jī)械進(jìn)行維修、保養(yǎng),保證機(jī)械在施工過(guò)程中正常運(yùn)轉(zhuǎn)。

(4)灌注過(guò)程中應(yīng)記錄混凝土灌注量及相對(duì)的混凝土面標(biāo)高,用以分析擴(kuò)孔率,發(fā)現(xiàn)異常情況應(yīng)及時(shí)上報(bào),并進(jìn)行處理。

(5)在灌注混凝土將近結(jié)束時(shí),應(yīng)核對(duì)混凝土的灌入數(shù)量,以確保所測(cè)混凝土的灌注高度是否正確。

(6)灌注時(shí)樁頂部標(biāo)高可依據(jù)在孔內(nèi)混凝土面測(cè)3個(gè)高程點(diǎn),澆筑完成后,混凝土頂面高出樁頂設(shè)計(jì)標(biāo)高50cm,上接方樁頭時(shí)將其截除,保證樁芯混凝土密實(shí)度。

7抗滑樁樁頭處理及檢測(cè)

篇10

子宮內(nèi)膜異位癥(內(nèi)異癥)聽(tīng)起來(lái)是一個(gè)很學(xué)術(shù)、很陌生的名字,但很多女性在不知不覺(jué)中已與它相伴多時(shí)了。

臨床癥狀

不孕:約有50%左右內(nèi)異癥患者伴有不孕。內(nèi)異癥患有不孕,常因病變?cè)斐膳枨荒[塊、粘連、輸卵管堵塞、卵泡發(fā)育不好或排卵障礙等因素引起;而一旦懷孕則異位內(nèi)膜受到抑制而萎縮,對(duì)內(nèi)異癥起到很好的治療,習(xí)慣性流產(chǎn)病例中有部分為子宮內(nèi)膜異位癥所致。

痛經(jīng):是常見(jiàn)而突出的特征,多為繼發(fā)性,即自發(fā)生內(nèi)膜異位開(kāi)始。患者以往月經(jīng)來(lái)潮時(shí)并無(wú)疼痛,而從某一個(gè)時(shí)期開(kāi)始出現(xiàn)痛經(jīng),可發(fā)生在月經(jīng)前、月經(jīng)時(shí)及月經(jīng)后。有的痛經(jīng)較重,需要臥床休息或服用止痛藥物。疼痛常隨著月經(jīng)周期而加重,月經(jīng)結(jié)束而消失,但國(guó)內(nèi)報(bào)道有21%約無(wú)痛經(jīng)。

周期性直腸刺激癥狀:進(jìn)行性加劇的周期性直腸刺激癥狀罕見(jiàn)于其他婦科疾病,是診斷本癥最有價(jià)值的癥侯。直腸、、外墜脹、墜痛、里急后重感和大便次數(shù)增多。當(dāng)病變逐漸加重時(shí),癥狀日趨明顯,而經(jīng)后癥狀消失。

月經(jīng)不調(diào):內(nèi)異癥患者常有月經(jīng)周期縮短、經(jīng)量增多或經(jīng)期延長(zhǎng)等現(xiàn)象,說(shuō)明患者有卵巢功能障礙表現(xiàn)。

痛:當(dāng)存在于陰道穹窿部異位子宮內(nèi)膜結(jié)節(jié)、直腸凹陷結(jié)節(jié)或粘連,或卵巢粘連在盆底時(shí),均可產(chǎn)生痛。闊韌帶后葉病灶纖維化增生及收縮明顯時(shí),可以外源性壓迫輸尿管,使其狹窄阻塞,亦可出現(xiàn)泌尿系癥狀,嚴(yán)重可發(fā)生輸尿管積水或腎盂積水。

周期性膀胱刺激癥狀:當(dāng)內(nèi)異癥病變累及膀胱肌層時(shí),會(huì)同時(shí)出現(xiàn)經(jīng)期尿急、尿頻等癥狀。若病變侵犯膀胱黏膜(膀胱子宮內(nèi)膜異位癥)則出現(xiàn)周期性血尿和疼痛。

經(jīng)期或行經(jīng)前后的急腹癥:一般為卵巢子宮內(nèi)膜囊腫,多數(shù)患者因卵巢囊腫扭轉(zhuǎn)或?qū)m外孕引發(fā)急腹癥,而急診手術(shù)。

周期性下腹不適:本癥狀出現(xiàn)率高于痛經(jīng),無(wú)痛經(jīng)的內(nèi)異癥患者常存在本癥狀。出現(xiàn)于輕癥患者,或某些病變雖較重但由于痛閾的個(gè)性差異或其他原因,不產(chǎn)生痛經(jīng)癥狀而僅有經(jīng)期腰酸、下腹墜脹不適感。另外,腹壁疤痕及臍部的子宮內(nèi)膜異位癥則出現(xiàn)周期性局部腫塊及疼痛;內(nèi)在型子宮內(nèi)膜異位癥患者往往子宮脹大等。

預(yù)防

根據(jù)目前公認(rèn)病因,注意下列幾點(diǎn),可能預(yù)防子宮內(nèi)膜異位癥。

避免在臨近月經(jīng)期進(jìn)行不必要的、重復(fù)的或過(guò)于粗暴的婦科雙合診,以免將子宮內(nèi)膜擠入輸卵管,引起腹腔種植。

婦科手術(shù)盡量避免接近經(jīng)期施行。必須進(jìn)行時(shí),術(shù)中操作要輕柔,避免用力擠壓宮體,否則有可能將內(nèi)膜擠入輸卵管、腹腔。

及時(shí)矯正過(guò)度后屈子宮及宮頸管狹窄,使經(jīng)血引流通暢,避免淤滯,引起倒流。

嚴(yán)格掌握輸卵管通暢試驗(yàn)(通氣,通液)及造影的操作規(guī)程,不可在月經(jīng)剛干凈或直接在刮宮這一周期進(jìn)行,以免將內(nèi)膜碎片經(jīng)輸卵管壓入腹腔。