管線施工工藝范文
時(shí)間:2023-05-30 16:10:37
導(dǎo)語:如何才能寫好一篇管線施工工藝,這就需要搜集整理更多的資料和文獻(xiàn),歡迎閱讀由公務(wù)員之家整理的十篇范文,供你借鑒。
篇1
關(guān)鍵詞:工藝;施工方案;質(zhì)量控制
Abstract: with the increasing of economic in our country, the development of the city is very fast, which makes urban infrastructure increasing pressure, one of the most main is the city water supply and drainage problem, especially the quality of the urban water supply engineering much attention. At present the development direction of city economic development zone, mainly concentrated in the cities on the building of these areas are not mature water supply system, combined with development too fast, the problem such as population explosion. Directly for water supply pipeline construction has brought serious challenges. Though we are in the process of urban development has attaches great importance to the problem of water supply pipeline, but still exist many problems, such as water supply and water, secondary water supply, water quality and other issues. These questions are all citizens and government's concern and urgent, so in this situation, to improve the quality of municipal drainage construction technology and construction control became the main steps of water supply engineering, only deal with these problems in time can provide guarantee for the development of the city.
Key words: process; The construction plan; The quality control
中圖分類號(hào):TU991.36文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):2095-2104(2013)
引言:
給水和供水工程是十分重要的,這些工程的質(zhì)量和施工效率對(duì)城市發(fā)展的影響很深,另外給水工程還對(duì)城市道路規(guī)劃和城市環(huán)保起到很大的帶動(dòng)作用,如果在給水上出現(xiàn)問題就會(huì)為城市帶來嚴(yán)重的災(zāi)難。所以采取合理的施工技術(shù),提高給水線路的施工質(zhì)量是非常有必要的。本文針對(duì)城市工程的給水工程施工工藝進(jìn)行探討,并對(duì)施工中出現(xiàn)的問題提出解決方案。
1.給水管預(yù)制及安裝
給水管線需要事先進(jìn)行預(yù)制后,在基坑進(jìn)行連接安裝的。所以在進(jìn)行下料和拼接前,要對(duì)管道走線和連接工藝進(jìn)行細(xì)致的研究,要保證管材和管件規(guī)格相互配套。對(duì)受損的閥門和有質(zhì)量缺陷的材料不能用于施工,要及時(shí)對(duì)損壞關(guān)鍵做好標(biāo)記,防止發(fā)生誤用的情況。在進(jìn)行管線切割時(shí),要針對(duì)不同管徑進(jìn)行不同方法的施工,給水管線的鋼管質(zhì)地差別很大,所以要配置不同型號(hào)的切割設(shè)備,如果用不銹鋼管件切記不能使用火焊切割。同時(shí)不同的管徑要使用不同的切割機(jī)進(jìn)行切割。在切割完成后要將鋼管表面的熱熔渣和氧化物及時(shí)清理掉。在下料中要做出余量以便后期的安裝和固定,要保證預(yù)留量在10厘米以上,在完成切割后要將切割位置做出標(biāo)識(shí)。要將不同型號(hào)的材質(zhì)和規(guī)格進(jìn)行分類。
2 .給水管道的安裝
很多給水管道的安裝方法都采用人工安裝,所以在施工前必須進(jìn)行周密的施工組織,要使開挖步驟符合安裝過程,給水工程的位置一般在市區(qū)內(nèi),在開挖過程中會(huì)對(duì)人行道路產(chǎn)生很大的干擾,所以在開挖中要將出土合理堆放,要減少對(duì)行人造成的影響。
當(dāng)基坑挖好后,就要根據(jù)圖紙進(jìn)行基底檢查,要對(duì)基坑中心線的標(biāo)高和坐標(biāo)進(jìn)行符合,當(dāng)復(fù)合完成后,要對(duì)管底進(jìn)行夯實(shí)和填砂處理,并將夠兩邊的土方去除,以防止邊坡坍塌為安裝帶來影響。
在安裝管道的過程中要注意很多問題,首先要確保給水管道的清潔,安裝完成后要進(jìn)行管道的消毒和沖洗,達(dá)到衛(wèi)生標(biāo)準(zhǔn)后方可進(jìn)行并網(wǎng)投入使用。其次要注意管件之間的連接,管之間的連接要保證接口對(duì)齊,要避免因?qū)趩栴}出現(xiàn)的泄露現(xiàn)象。最好要做好焊接和連接工作,焊接標(biāo)準(zhǔn)要滿足規(guī)范要求,在連接工序上要注意管件間的嚴(yán)密性。
3 .給水管的壓力測(cè)試
管道在鋪設(shè)完成后,必須能符合多種用水量的變化,所以要保證內(nèi)部壓力的穩(wěn)定,水量在加大時(shí),水壓相對(duì)很大。在壓力測(cè)試的時(shí)候就要考慮這一點(diǎn),在壓力測(cè)試中保證管道能有效處于壓力極限工作。管道壓力測(cè)試的具體步驟如下;
水壓試驗(yàn)應(yīng)具備的條件
管道接口全部驗(yàn)收合格及管頂填土不小于500mm之后,并夯實(shí)。
混凝土鎮(zhèn)墩達(dá)到要求強(qiáng)度的75%。
管內(nèi)人工清理完成。
撤離對(duì)管道試壓有影響的設(shè)備、障礙物。
壓力表已校驗(yàn)并安裝完成,精度符合要求,壓力表的量程為0~2.5MPa,分別安裝在試壓管段的兩端,試壓讀數(shù)以低處讀數(shù)為準(zhǔn)。
試驗(yàn)管段所有敞口應(yīng)堵嚴(yán),不得有滲水現(xiàn)象。
打壓水源、水泵、發(fā)電機(jī)、專用加壓泵、試壓閥門、壓力表等試驗(yàn)用設(shè)備齊全,且精度符合要求。
試壓管段已進(jìn)行了灌水浸泡,浸泡時(shí)間不少于24h。
水壓試驗(yàn)的程序
試壓過程
采用壓力表試驗(yàn)法。試壓時(shí)用試壓泵向管內(nèi)灌水升壓,壓力升至試驗(yàn)壓力,然后停止加壓,觀察壓力表下降情況,若在空氣排凈的條件下,在15min中內(nèi)壓力下降不大于0.03Mpa,則認(rèn)為水壓試驗(yàn)合格。壓力表試驗(yàn)法裝置如下圖所示:
試壓作業(yè)注意事項(xiàng)
兩端封板有足夠的抗壓應(yīng)力阻擋水壓,封板后面的試壓靠背要穩(wěn)固 ,在管線高處設(shè)置放氣閥。
管內(nèi)注水徐徐注水,工作人員24h值班,沿線巡查管線及各種閥門是否工作正常。
管道內(nèi)灌滿水后仍需充足排氣至排氣孔出水為止。
水壓試驗(yàn)時(shí),應(yīng)逐漸緩慢升壓,如穩(wěn)壓期間滲漏較大,應(yīng)立即終止水壓試驗(yàn)。
不論試驗(yàn)滲漏量多大,均應(yīng)對(duì)存在可視滲漏接頭進(jìn)行修補(bǔ)。
壓力測(cè)試按給水不同區(qū)域的要求,有著不同的壓力等級(jí)。所以要試壓前要指定好試驗(yàn)區(qū)域,并做好標(biāo)記工作。同時(shí)要對(duì)整個(gè)給水系統(tǒng)進(jìn)行一次檢查,尤其對(duì)彎頭連接、閥門連接等位置要著重檢查,當(dāng)給水系統(tǒng)檢查無誤后在開始進(jìn)行壓力測(cè)試。
二、科學(xué)設(shè)計(jì)給水管線施工方案
在進(jìn)行施工前要合理設(shè)計(jì)施工方案,并且要考慮使用工業(yè)較齊全的施工方法。要保證給水線路設(shè)計(jì)的科學(xué)性,減小施工基坑的開挖面,將工程產(chǎn)生的影響降到最低。同時(shí)在施工中要將整體規(guī)劃和自然條件相互結(jié)合,做到全面的編制施工組織。
1. 提前做好地質(zhì)情況勘察
從很多實(shí)際情況看出來,有很多設(shè)計(jì)者在設(shè)計(jì)的時(shí)候,根本就在紙上談兵,未實(shí)地對(duì)當(dāng)?shù)氐乃牡刭|(zhì)以及工程地質(zhì)進(jìn)行勘察。這樣就會(huì)造成施工麻煩,比如出現(xiàn)流砂,淤泥和涌水等現(xiàn)象。導(dǎo)致一些特殊的地段管道需要接口特殊處理、基礎(chǔ)需要加固等現(xiàn)象。有的時(shí)候缺乏處理技術(shù),或者需要趕工期,一些施工單位就檢查的處理,根部不能保證施工的質(zhì)量,為以后的管線網(wǎng)使用帶來了遺留問題。因此,在設(shè)計(jì)的時(shí)候,設(shè)計(jì)者必須實(shí)地進(jìn)行勘察,避免一系列的施工問題產(chǎn)生。如果確實(shí)不能避免,也應(yīng)該標(biāo)注清楚,施工員會(huì)針對(duì)性的做出處理方案。
2 .要弄清楚地下的設(shè)施埋設(shè)情況
現(xiàn)在埋在地下的管線設(shè)施非常多,其中有電力電纜線,煤氣管道,通信電纜,給水管道,排水管道等,整個(gè)地下就像一張復(fù)雜的網(wǎng),縱橫交錯(cuò)。因此,在設(shè)計(jì)施工方案的時(shí)候,必須提前摸清施工路線下面是否有這些網(wǎng)絡(luò)。如果不摸清地下清楚, 而導(dǎo)致在施工過程中破壞了現(xiàn)有的管線,那就帶來了不必要的麻煩。一旦在施工工程中遇到麻煩,那么管道的走向、高度以及坡度就很要重新調(diào)整了。重新調(diào)整,會(huì)增加管道節(jié)點(diǎn)水頭損失,造成達(dá)不到設(shè)計(jì)預(yù)期,會(huì)帶來更大的后期麻煩。因此,在設(shè)計(jì)方案的時(shí)候,必須要弄清新建管線的沿途的地下埋設(shè)情況,還要弄的一清二楚,設(shè)計(jì)出合理、科學(xué)的管線路由。
3 .讓維護(hù)部門參與
管線在施工完成后,會(huì)直接投入使用,這時(shí)管線就不再歸施工方所有,并且將很多后續(xù)工作都納入了市政部門。市政部門對(duì)給水線路線路中出現(xiàn)的問題有著豐富的處理經(jīng)驗(yàn),所以在設(shè)計(jì)過程中可以聽取市政部門的設(shè)計(jì)意見,并且可以合理的增加預(yù)防性的設(shè)計(jì),盡可能的減少設(shè)計(jì)中出現(xiàn)的疏漏。
4. 對(duì)材料的選擇
在傳統(tǒng)的給水管線中,基本都采用預(yù)應(yīng)力混凝土管或球墨鑄鐵管,雖然價(jià)格相對(duì)低廉,但是水管的體積和重量都比較大,為整個(gè)施工帶來極大的難度,加之傳統(tǒng)管材易碎且不耐腐蝕,導(dǎo)致使用壽命較短,過不了多久又需要更換新管。為此,在設(shè)計(jì)新的方案時(shí),多采用先進(jìn)新型管材,用來改善水力運(yùn)行的條件,目前普遍采用球墨鑄鐵管、UPVC 管、PE 管等。當(dāng)然,選擇什么材質(zhì)的管材還得因地制宜來設(shè)計(jì)。
三、加強(qiáng)施工質(zhì)量管理
1.在施工中加強(qiáng)對(duì)人的控制,在管線連接過程中多數(shù)采用人力安裝,所以人對(duì)工程質(zhì)量的影響最大,在施工質(zhì)量管理中要將先進(jìn)的施工技術(shù)和施工隊(duì)伍相互結(jié)合。在使用新技術(shù)的同時(shí),對(duì)施工隊(duì)伍的內(nèi)部進(jìn)行嚴(yán)格的把關(guān)和審核。一個(gè)過硬的施工隊(duì)伍在擁有高效的施工效率的同時(shí)還要具備健全的管理制度,施工隊(duì)伍的人員組織必須齊全,要從領(lǐng)導(dǎo)到工人形成一張質(zhì)量控制網(wǎng),并在合理的質(zhì)量管理制度下,明確各個(gè)崗位的質(zhì)量責(zé)任,要充分利用獎(jiǎng)勵(lì)制度和問責(zé)制度,要將保證工程質(zhì)量放在第一位。
2.提高施工的技術(shù)水平
在施工中要積極采用先進(jìn)的施工工藝,給排水工程由于影響面廣泛,所以對(duì)整體工期的要求十分嚴(yán)格,如果在工期上不能的到保障,就會(huì)影響工程的建設(shè)質(zhì)量和建設(shè)目的。所以市政工程中的施工對(duì)于要在業(yè)務(wù)能力上提高,對(duì)新型的施工工藝不予排斥,在提高隊(duì)伍施工施工效率的同時(shí),保證工程質(zhì)量,為管線在運(yùn)行后發(fā)揮優(yōu)良的性能打下堅(jiān)實(shí)的基礎(chǔ)。
四、結(jié)束語
城市給水工程在建設(shè)和規(guī)劃中要復(fù)合城市發(fā)展的實(shí)際情況,一個(gè)城市良好的給水系統(tǒng)對(duì)城市的穩(wěn)定發(fā)展起到極大的影響,所以我們必須對(duì)市政工程的給水管線施工工藝高度重視,在建設(shè)中采用最為合理的設(shè)計(jì)方案和施工工藝,在保證城市市容市貌的前提下,最大限度的加快施工進(jìn)度,提高施工質(zhì)量。
參考文獻(xiàn):
[1]葉一奎;;淺談市政給排水工程施工管理與注意事項(xiàng)[J];科技資訊;2008年18期
[2]馬曉穎;王小強(qiáng);;市政給排水工程施工管理問題及對(duì)策研究[J];現(xiàn)代商貿(mào)工業(yè);2010年07期
[3]周世鵬;;淺析市政給排水管道工程中的質(zhì)量控制措施[J];中國城市經(jīng)濟(jì);2011年01期
[4]張文英;;淺析市政排水管道工程施工質(zhì)量控制[J];邢臺(tái)職業(yè)技術(shù)學(xué)院學(xué)報(bào);2006年05期
篇2
關(guān)鍵詞:給排水;管線;施工
Abstract: with the continuous development of our society, the improvement of people's living standards, the scientific and technological level of industries in our country also got the corresponding increase, in the process of urbanization in our country unceasingly speeds up the city, municipal construction is becoming more and more tend to be high quality. Water supply and drainage pipeline construction for the development of a city construction and people's stable life is of great importance, it is not only a strategic foundation with city, is also associated with other urban infrastructure. According to the actual construction of municipal water supply and drainage pipeline concrete in this paper, the analysis of an important link of the construction process.
Keywords: water supply and drainage; Pipeline; The construction
中圖分類號(hào):TL353+.2文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):2095-2104(2013)
引言
城市建設(shè)速度的不斷加快,對(duì)市政工程質(zhì)量也提出了更高的要求。市政給排水工程的質(zhì)量,對(duì)于居民的身體健康以及城市的工業(yè)生產(chǎn)等都有著重要的影響,供排水管的重要性是顯而易見的,可以說,該管線的施工質(zhì)量的好壞不僅影響城市的發(fā)展,還對(duì)于城市的環(huán)保,道路的完好都有極大的影響,如果沒有質(zhì)量可靠,疏通性優(yōu)良的給排水管線系統(tǒng),可能會(huì)給城市帶來毀滅性的災(zāi)難。為了保證給排水管線的質(zhì)量,當(dāng)前使用的較為普遍的是硬聚氯乙烯冷熱給水管,與普通的金屬管材相比,其具有更高的流速和更小的阻力,而且管線的自重較輕,施工也較為容易,因此受到了廣泛的應(yīng)用。
市政給排水管線施工工藝的概述
給排水管道的預(yù)制和切割
管道預(yù)制的作業(yè)過程為兩方面:一方面是對(duì)管道預(yù)制只能選用大于2"的管,所有設(shè)備都要在施工當(dāng)場(chǎng)進(jìn)行預(yù)制,除了撬裝設(shè)備之外。另一方面是在進(jìn)行下料的時(shí)候,需要對(duì)其所用的管件等物件進(jìn)行嚴(yán)格的檢查,并對(duì)其出現(xiàn)的損壞的進(jìn)行及時(shí)的更換,對(duì)已經(jīng)出現(xiàn)問題對(duì)其進(jìn)行標(biāo)記,以保證施工中所用的管道用品是好的,只有這樣才能保證其不發(fā)生漏水現(xiàn)象,并嚴(yán)格的管理好已經(jīng)進(jìn)行標(biāo)記了的材料,以防止以后在施工中被使用。
管材切割的作業(yè)中也分為兩方面進(jìn)行注意:一方面是在進(jìn)行機(jī)械火焊對(duì)其進(jìn)行分割的時(shí)候,可以在小于2"的鋼管道的時(shí)候?qū)ζ涫褂们懈顧C(jī),值得注意的是在進(jìn)行不銹鋼的管道切割時(shí),不能夠使用火焊對(duì)其進(jìn)行分割。在大于 2" 的不銹鋼管使用等離子進(jìn)行切割,這樣就需要用到等離子切割機(jī),在切割后要嚴(yán)格的防止其表面被氧化物和殘?jiān)?/p>
給排水管的安裝
考慮到站場(chǎng)場(chǎng)地,地管管溝采用人工開挖,開挖之前應(yīng)按圖紙放線,挖出的土方盡量堆放到一邊,溝挖完后,應(yīng)檢查管底標(biāo)高及坐標(biāo),管底應(yīng)夯實(shí)。地管下溝時(shí)注意不要損壞防腐層,管兩端應(yīng)封閉,防止雜物進(jìn)入管內(nèi)。
管道安裝前,應(yīng)用壓縮空氣清理管道及管件,同時(shí)作好記錄。管子對(duì)口時(shí)檢查平直度,管道連接不得強(qiáng)力對(duì)口、加熱管子等方法來消除接口端面的空隙、偏差等缺陷。不銹鋼管道安裝時(shí),不得使用鐵質(zhì)工具敲擊。與容器、設(shè)備和泵互連接的法蘭,安裝時(shí)采用臨時(shí)石棉盲板,與動(dòng)設(shè)備連接的管道,其固定焊口遠(yuǎn)離設(shè)備,管道安裝合格后,動(dòng)設(shè)備不得承受設(shè)計(jì)外的附加載荷。
管道安裝要遵循以下原則:
(1)在施工過程中遇到土建相關(guān)的施工要進(jìn)行專向監(jiān)測(cè),所有數(shù)據(jù)表明可以繼續(xù)下一環(huán)節(jié)施工。
(2)管道的各類相關(guān)設(shè)施已經(jīng)安裝結(jié)束。
(3)給水排水管道的初步安裝已經(jīng)到位,各類零件沒有漏裝少裝,各項(xiàng)的檢驗(yàn)也已經(jīng)完成,檢驗(yàn)數(shù)據(jù)合格。
給排水管的壓力測(cè)試
對(duì)管線的壓力實(shí)驗(yàn)時(shí)要預(yù)先對(duì)不需要進(jìn)行試壓的管線部分進(jìn)行封閉或隔離處理,一般有部分系統(tǒng)、儀表、設(shè)備等,在這些附加了盲板的管線組成上不能發(fā)生標(biāo)志不明晰的現(xiàn)象。
正式進(jìn)行施壓時(shí)要再一次對(duì)管線進(jìn)行檢驗(yàn),開合閥門確定管線中介質(zhì)的流動(dòng)方向,一旦發(fā)現(xiàn)方向相反,就要對(duì)其進(jìn)行閥芯取出的操作,處理后重新安裝。
試壓步驟:
(1) 水壓試驗(yàn)系統(tǒng)充水時(shí)盡量從管道底部充入,在管道系統(tǒng)最高點(diǎn)將系統(tǒng)內(nèi)部的空氣排盡,最高點(diǎn)必須裝壓力表。
(2)緩慢升壓,達(dá)到試驗(yàn)壓力后,停壓 10 分鐘,如無壓降、目測(cè)管道無變形,然后壓力降至設(shè)計(jì)壓力,對(duì)管道系統(tǒng)全面檢查,如果發(fā)現(xiàn)泄漏,應(yīng)該泄壓處理,不得帶壓操作。
(3)氣壓試驗(yàn),壓力應(yīng)逐漸緩升,首先升至試驗(yàn)壓力的 50%,檢查所有焊縫、閥門、法蘭口,無泄漏無異?,F(xiàn)象,繼續(xù)按試驗(yàn)壓力的10%逐漸升壓,直至實(shí)驗(yàn)壓力,每一級(jí)穩(wěn)壓 3 分鐘,達(dá)到試驗(yàn)后穩(wěn)壓 5 分鐘,如無壓降、目測(cè)無形,然后壓力降至設(shè)計(jì)壓力,用涂肥皂水方法檢查焊縫、閥門、法蘭口(如無泄漏)穩(wěn)壓 30 分鐘,壓力仍不降為合格。如果發(fā)一泄漏,應(yīng)該壓處理,不得帶壓處理。
市政給排水管線的施工方案
在設(shè)計(jì)管道線施工方案時(shí),要采用考慮齊全的科學(xué)方法。這樣設(shè)計(jì)出來的線路才能達(dá)到有效排水。在設(shè)計(jì)的時(shí)候,要考慮當(dāng)?shù)氐淖匀粭l件和規(guī)劃、環(huán)保、衛(wèi)生等部門的要求,根據(jù)原有設(shè)施做參考,合理全面的進(jìn)行綜合考慮設(shè)計(jì)。
(一)提前做好地質(zhì)情況勘察
從很多實(shí)際情況看出來,有很多設(shè)計(jì)者在設(shè)計(jì)的時(shí)候,根本就在紙上談兵,未實(shí)地對(duì)當(dāng)?shù)氐乃牡刭|(zhì)以及工程地質(zhì)進(jìn)行勘察。這樣就會(huì)造成施工麻煩,比如出現(xiàn)流砂,淤泥和涌水等現(xiàn)象。導(dǎo)致一些特殊的地段管道需要接口特殊處理、基礎(chǔ)需要加固等現(xiàn)象。有的時(shí)候缺乏處理技術(shù),或者需要趕工期,一些施工單位就檢查的處理,根部不能保證施工的質(zhì)量,為以后的管線網(wǎng)使用帶來了遺留問題。因此,在設(shè)計(jì)的時(shí)候,設(shè)計(jì)者必須實(shí)地進(jìn)行勘察,避免一系列的施工問題產(chǎn)生。如果確實(shí)不能避免,也應(yīng)該標(biāo)注清楚,施工員會(huì)針對(duì)性的做出處理方案。
(二)要弄清楚地下的設(shè)施埋設(shè)情況
現(xiàn)在埋在地下的管線太多了,什么電力電纜線,什么煤氣管道等,弄的整個(gè)地下就像一張復(fù)雜的網(wǎng),錯(cuò)縱橫交錯(cuò)。因此,在設(shè)計(jì)施工方案的時(shí)候,必須要提前摸清施工路線下面是否有這些網(wǎng)絡(luò)。如果不摸清地下清楚,而導(dǎo)致在施工過程中破壞了別人的管線,那就帶來了不必要的麻煩。一旦在施工工程中遇到麻煩,那么管道的走向、高度以及坡度就很難重新調(diào)整了??扇绻徽{(diào)整,又會(huì)出現(xiàn)倒水的現(xiàn)象,造成管道堵塞,會(huì)帶來更大的后期麻煩。因此,在設(shè)計(jì)方案的時(shí)候,必須要弄清新建管線的沿途的地下埋設(shè)情況,還要弄的一清二楚,設(shè)計(jì)出合理、科學(xué)的管線路由。
(三)維護(hù)部門參與
在管線施工完成,投入使用之后,一切的后繼工作就歸入到維護(hù)部門。他們里面的工作人員對(duì)后期容易出現(xiàn)的問題,以及使用過程中引發(fā)出來的問題都是了如指掌。那么,在設(shè)計(jì)的時(shí)候,要多聽取他們的意見,根據(jù)他們提出的預(yù)防性問題做出相應(yīng)的修改,才能設(shè)計(jì)出完美的施工方案。
(四)對(duì)材料的選擇
在傳統(tǒng)的供排水管線中,基本都采用混凝土管或球墨鑄鐵管,雖然價(jià)格相對(duì)低廉,但是水管的體積和重量都比較大,為整個(gè)施工帶來極大的難度,加之傳統(tǒng)管材易碎且不耐腐蝕,導(dǎo)致使用壽命較短,過不了多久又需要更換新管。
結(jié)束語
市政工程給排水管線的建設(shè),關(guān)系到一個(gè)城市的發(fā)展和居民生活的穩(wěn)定,而管線工程建設(shè)的施工工藝,又決定著這個(gè)城市的建設(shè)水平和發(fā)展后勁,因此,給排水施工技術(shù)人員,應(yīng)當(dāng)充分重視給排水管線的施工工藝, 保證市政給水管線的高質(zhì)量布線。以上談到的幾點(diǎn),就是市政給水排水管線施工的重要環(huán)節(jié),雖然不是管線施工的全部環(huán)節(jié),但是掌握住這些環(huán)節(jié)的施工質(zhì)量,就能將管線的施工質(zhì)量做到最大程度上的保證,而且,上文提及的這些環(huán)節(jié)也是管線施工中最容易出現(xiàn)問題的施工步驟,所以經(jīng)過本文的論述后,能得到同行在施工過程中的重視,以及為同行的工作起到幫助作用。
參考文獻(xiàn):
[1] 郭凱.市政工程中給排水管線施工工藝淺析[J].城市建筑,2012(12).
[2] 姜巖,姜海龍.市政工程給排水管線施工工藝研究[J].科技致富向?qū)?2011(8).
[3] 唐寧霞,陶義.市政工程給排水管線施工工藝分析[J].科技咨詢,2009.
篇3
關(guān)鍵詞:市政工程;給排水管線;施工工藝
中圖分類號(hào):TU99文獻(xiàn)標(biāo)識(shí)碼: A
一、市政給排水管線施工前的準(zhǔn)備工作
施工單位在進(jìn)行施工前,應(yīng)將施工圖紙交由設(shè)計(jì)單位、業(yè)主、監(jiān)理公司進(jìn)行會(huì)審,結(jié)合現(xiàn)場(chǎng)管道的長(zhǎng)度、直徑等數(shù)據(jù),把一些可能會(huì)出現(xiàn)的問題盡可能的在施工前解決好。同時(shí)還要對(duì)施工方案做好規(guī)劃,了解現(xiàn)場(chǎng)地貌、地形,特別是管道所要經(jīng)過的地下及其附近是否有建筑物。還應(yīng)當(dāng)對(duì)水準(zhǔn)點(diǎn)進(jìn)行復(fù)測(cè),以避免出錯(cuò)。
一般情況,管道中線都是由施工中的施工單位自己設(shè)定的??砂丛O(shè)計(jì)給定的中線控制點(diǎn),在現(xiàn)場(chǎng)測(cè)設(shè)出中線的起點(diǎn)、終點(diǎn)、平面折點(diǎn)、縱向折點(diǎn)及直線段控制中心樁,并在對(duì)應(yīng)的溝槽外適當(dāng)?shù)牡胤皆O(shè)置方向控制樁,然后通過測(cè)量確定樁號(hào)。在測(cè)量員測(cè)定出管道中心線并且檢查井的位置后,還要進(jìn)行復(fù)測(cè),將其誤差限定在規(guī)范要求內(nèi)再開始施工。
在設(shè)計(jì)施工管道時(shí)要注意選定適當(dāng)?shù)牟牧?,以此保證管道在使用壽命內(nèi)的質(zhì)量,嚴(yán)格控制禁止不符合規(guī)定的材料進(jìn)入施工現(xiàn)場(chǎng),以避免由于質(zhì)量問題進(jìn)行修復(fù)而造成不必要的損失。同時(shí)對(duì)材料進(jìn)行選擇時(shí)還應(yīng)考慮到不同道路的類型,機(jī)動(dòng)車道下的雨水管道、污水應(yīng)當(dāng)采用Ⅱ級(jí)承插式鋼筋混凝土排水管;其他類型的管道則應(yīng)根據(jù)埋設(shè)的深度進(jìn)行相應(yīng)的選擇。除此之外,對(duì)管道接口的選擇也有要求,不同用途的管道應(yīng)當(dāng)選用不同類型的材質(zhì),這樣可以防止接口漏水。
二、市政工程中給排水管線施工工藝
(一)管道預(yù)制
(1)在給排水施工工程開始前,給排水管道大多是需要預(yù)先制作好的。進(jìn)行管道預(yù)制工作一般分兩步,第一步是尋找可用的管材,在預(yù)制前,必須尋找給排水管道設(shè)計(jì)要求的管材,確保管材質(zhì)量,這些管材一般須符合“達(dá)到不小于2”這個(gè)標(biāo)準(zhǔn),管材準(zhǔn)備好的同時(shí),還要準(zhǔn)備好制作預(yù)制管材所需的設(shè)備,提前做好設(shè)備調(diào)試與檢查,避免使用時(shí)設(shè)備不好使情況發(fā)生,或是沒有設(shè)備臨時(shí)找設(shè)備的情況,這樣做的目的只有一個(gè),就是保證在施工工期要求內(nèi)制作預(yù)制管材,以利于預(yù)制管材的順利完成。第二步是對(duì)管道進(jìn)行下料,下料過程是很關(guān)鍵的一步,直接決定著預(yù)制管道的質(zhì)量是否能達(dá)到使用要求。在進(jìn)行下料前,需對(duì)所有要使用的設(shè)備進(jìn)行仔細(xì)檢查,防止其設(shè)備故障影響下料質(zhì)量。同時(shí),對(duì)于管材的質(zhì)量也要嚴(yán)格把關(guān),防止其破損,發(fā)現(xiàn)損壞及時(shí)維修處理,總之一句話,就是盡量避免管道破損導(dǎo)致漏水現(xiàn)象發(fā)生。
(2)管材的切割也是很重要的一步,切割工作也有一定的工作技巧和質(zhì)量要求,在進(jìn)行施工工作時(shí)要特別注意。一是在進(jìn)行切割時(shí),一般應(yīng)用火焊技術(shù)對(duì)其切割裁切,需要注意的是切割的比例要與下料的要求相一致,且使用的切割設(shè)備也要適宜,避免錯(cuò)誤使用,造成切割質(zhì)量不能滿足要求。例如,對(duì)于“大于2”的鋼管,一般使用等離子切割技術(shù),避免切割后的氧化物殘?jiān)鼩埩粲诠艿狼锌?,與空氣間發(fā)生氧化反應(yīng)。
(3)管道預(yù)制、切割完成后,就到了管道安裝的步驟。對(duì)于管道安裝過程,管道的焊口處理是很關(guān)鍵的一步,下面就安裝施工程序做簡(jiǎn)單的分析:首先,進(jìn)行施工時(shí),要確保每一個(gè)步驟都符合標(biāo)準(zhǔn)或規(guī)范要求,確保每一施工過程的質(zhì)量,例如管道組對(duì)、坡口間隙、角度等等。在進(jìn)行管道組對(duì)時(shí),對(duì)于厚度相同的管道,要保證內(nèi)壁較完整,錯(cuò)邊量要不超過壁厚度的10%,且不超過1mm;對(duì)于厚度不同的管道來說,進(jìn)行組對(duì)時(shí),要保證兩壁間的厚差符合標(biāo)準(zhǔn)規(guī)范的加工要求。其次,對(duì)于每一個(gè)焊口的焊接過程都要嚴(yán)格操作,且要做好焊接記錄,做好焊接標(biāo)記,對(duì)于不銹鋼管道的焊接標(biāo)記一般使用油漆標(biāo)記或記號(hào)筆標(biāo)記,且在焊工圖紙上做好標(biāo)識(shí)。嚴(yán)格按規(guī)定的焊接技術(shù)要求焊接操作,做好記錄,若發(fā)生質(zhì)量問題時(shí)便于追溯。
(4)對(duì)于預(yù)制好的短管應(yīng)用鐵絲栓在短管好,或做好標(biāo)記與保護(hù)。對(duì)于短管的保護(hù)措施常用的有兩種,一種是對(duì)于帶法蘭的短管,需要用金屬線將木質(zhì)保護(hù)板栓在法蘭孔上;另一種是不帶法裝蘭的短管,需在在短管端部裝上塑料帽進(jìn)行保護(hù)。
(5)為了便于管理與查找缺陷,對(duì)于預(yù)制好的短管必須做好記錄。當(dāng)進(jìn)行預(yù)制件裝卸時(shí),要加好臨時(shí)的支撐,避免短管變形或油漆損壞。
(二)管道的安裝
在對(duì)管道進(jìn)行安裝時(shí)應(yīng)該格外注意,首先應(yīng)該考慮到的是場(chǎng)地問題,如果場(chǎng)地問題沒有解決好,將不利于管道的安裝.并且,在對(duì)地下管道進(jìn)行開挖的過程中,最好采用人工開挖技術(shù),開挖前按照設(shè)計(jì)圖紙進(jìn)行位置的確定,挖出的土最好放置在一旁,工程結(jié)束后再對(duì)底部的標(biāo)準(zhǔn)高度以及坐標(biāo)進(jìn)行準(zhǔn)確測(cè)量,同時(shí),還應(yīng)該保證管道底部具有絕對(duì)的結(jié)實(shí)度,以免造成過程中的坍塌,給管道下管造成系列問題.最后,在管道下管時(shí)應(yīng)該格外注意,千萬不要將防腐層進(jìn)行破壞,管道的兩端還應(yīng)該進(jìn)行相應(yīng)的封閉,以免垃圾進(jìn)入造成管道的不暢通,無法實(shí)現(xiàn)給排水工程的正常運(yùn)行.從另一方面來說,在對(duì)管道進(jìn)行安裝過程的前期,首先應(yīng)該對(duì)管道進(jìn)行清理,同時(shí)做好相關(guān)記錄.并且還應(yīng)該格外檢查管道口是否平直,管道與管道之間的連接是否結(jié)實(shí)、是否有著一定的縫隙.只有這樣才能對(duì)其進(jìn)行很大程度上的安裝,才能在安裝過程中確保管道給排水工程的有效運(yùn)行。
(三)壓力試驗(yàn)
在將管道安裝完成后,就要對(duì)其進(jìn)行壓力的測(cè)試,以免在給排水施工過程中無法承受住較大的壓力,從而導(dǎo)致該工程無法正常運(yùn)行.要想對(duì)其進(jìn)行壓力測(cè)試,首先在工程施工前期就應(yīng)該檢查工程的相關(guān)流程,將閥門打開,過程中如果流向相反,就需要將閥心取出,并及時(shí)做好標(biāo)注,通過系列沖壓后再進(jìn)行閥心的安裝.
這樣將一系列工作準(zhǔn)備好后,就開始實(shí)施給排水工程,當(dāng)然,只是單純的對(duì)其進(jìn)行工程開挖,還是有著一定程度上的難度,畢竟并不是所有工程都可以在施工結(jié)束后再進(jìn)行開挖工程的,這就需要利用非開挖工程對(duì)其進(jìn)行施工,從而在施工過程中有效節(jié)省大量的資金投入,同時(shí),還可以確保在地下施工過程中不會(huì)影響該工程其他作業(yè)的正常運(yùn)行。
(四)管道系統(tǒng)的復(fù)位
在試壓結(jié)束后,并取得合格數(shù)據(jù),下一步要進(jìn)行迅速的復(fù)位,并清除臨時(shí)添加物、雜物,如膏板等。系統(tǒng)需要形成完全封閉,并更換所有正式墊片的部件,同時(shí)調(diào)整平行度數(shù),使連接軸設(shè)備與出場(chǎng)數(shù)據(jù)保持一致,并且反復(fù)調(diào)試直到符合施工的規(guī)范要求。施工結(jié)束后,拆除不需要的臨時(shí)支架,同時(shí)對(duì)正式支架、吊架進(jìn)行復(fù)核檢查,保證施工與設(shè)計(jì)圖紙一致。
(五)系統(tǒng)清洗和吹掃
為避免糾紛,管道系統(tǒng)清洗時(shí),應(yīng)提前與業(yè)主等主管人員協(xié)商,簽訂相關(guān)合約,并確保業(yè)主等主管人員在現(xiàn)場(chǎng)監(jiān)工。系統(tǒng)清洗和吹掃可采用水清洗和空氣吹掃兩種方式。水沖洗時(shí),水流應(yīng)保持連續(xù),水的流速應(yīng)大于、等于1.5米/秒,并確保順利的排入附近的排水井或溝渠。如果沒有具體規(guī)定,則觀察出口的水色和透明度與入口的水色和透明度目測(cè)一致,即為合格??諝獯祾咭话銙卟捎脙x表風(fēng)或工業(yè)風(fēng),因?yàn)轱L(fēng)壓力和流量的不確定性,無法目測(cè)是否吹掃干凈,可以在排氣口用一塊干凈木板或紙板做遮擋檢測(cè),如果沒有出現(xiàn)鐵銹、塵土、殘?jiān)捌渌K物即為合格。
結(jié)語
在市政給排水工程中,加強(qiáng)對(duì)排水管線施工工藝的檢驗(yàn),提高施工水平,是確保整體質(zhì)量的重要措施,從而使市政給排水工程能夠真正的做到為人民服務(wù)。
參考文獻(xiàn)
[1]武建.強(qiáng)化市政給排水管道工程施工質(zhì)量管理的措施探析[J].江西建材.2014(16)
篇4
關(guān)鍵詞:市政給排水,工程管線,施工工藝
1.市政給排水管線施工工藝的概述
1.1對(duì)給排水管進(jìn)行預(yù)測(cè)和切割
在進(jìn)行組對(duì)以及下料前,要仔細(xì)地檢查將要使用的管道,主要是檢測(cè)管件和管材,核實(shí)管壁以及材質(zhì)的規(guī)格,對(duì)于不符合規(guī)范的材料,例如有閥門封閉不嚴(yán)或者劃傷等缺陷的,不僅要替換掉,還要對(duì)廢棄的材料做好標(biāo)記和記錄,避免誤用,保證不使用到工程中。進(jìn)行切割的時(shí)候,也要先看管徑進(jìn)行合理施工,不同質(zhì)地的鋼管使用不同的切割機(jī),例如不銹鋼管就不允許使用火焊進(jìn)行切割。另外,管徑不同的鋼管也需要使用不同的切割機(jī)。切割后,還要清除掉表面的氧化物以及切割時(shí)產(chǎn)生的金屬熔渣。還要在下料處做余量,方便以后的安裝固定,一般都在100mm上。進(jìn)行切割后,需要對(duì)每一段的切割料進(jìn)行標(biāo)記,鋼管的規(guī)格、壁厚以及材質(zhì)等,避免在以后的使用中出現(xiàn)混亂現(xiàn)象。
1.2給排水管的安裝
大多數(shù)的及排水管的施工都用人工,主要是因?yàn)檫@樣占場(chǎng)地小。在施工前,一定要先看懂圖紙,不能大概的估計(jì),施工后才發(fā)現(xiàn)錯(cuò)誤,這必然會(huì)對(duì)工程帶來很大的影響。另外,挖出來的土也需要合理的堆放,盡可能的不給交通造成不便和麻煩。在挖好溝后,一定要按照?qǐng)D紙?jiān)俅芜M(jìn)行檢查,核對(duì)底座的坐標(biāo)和標(biāo)高是否符合標(biāo)準(zhǔn)。一切都核對(duì)完后,把管底夯實(shí),并且 把溝兩邊的土清除掉,避免掉進(jìn)地面雜物影響安裝。挖好管溝后,就要安裝管道了,這時(shí)也需要注意很多問題。管道里可能會(huì)有一些雜物,要用壓縮空氣進(jìn)行清理。另外,還需要檢查管子之間的接口是不是對(duì)平了,否則會(huì)造成泄露現(xiàn)象,采取措施徹底消除端面的空隙以及偏差等。
1.3給排水管的壓力測(cè)試
在管道建成投入使用后,因?yàn)樗繒?huì)發(fā)生變化,所以其內(nèi)部的壓力也不是非常穩(wěn)定,水量比較大的時(shí)候,壓力也就比較大。所以,在安裝時(shí)一定要考慮到這些問題,做好極限壓力測(cè)試。在按照?qǐng)D形設(shè)計(jì),安裝好管道后,就要進(jìn)行壓力測(cè)試。在測(cè)試前,要對(duì)不需要進(jìn)行測(cè)試的管道和設(shè)備的附近做好記錄和標(biāo)記。試壓之前還要對(duì)整個(gè)工藝進(jìn)行全面的檢查,在確認(rèn)無誤后,打開試壓閥門檢查,確定管線中水流的方向,發(fā)現(xiàn)方向相反時(shí),要取出閥芯進(jìn)行適當(dāng)?shù)恼{(diào)整。其步驟如下:(1)盡可能的由管道底部沖入水流,保證水流在管道系統(tǒng)最高處可以排盡內(nèi)部的空氣,必須在最高點(diǎn)安裝壓力表。(2)要平穩(wěn)而緩慢的升壓,達(dá)到需要的測(cè)試壓力值之后,還要對(duì)管道系統(tǒng)進(jìn)行全面的檢查,如果有泄露的情況,要馬上進(jìn)行泄壓處理,不允許帶壓操作。比如在進(jìn)行壓力測(cè)試時(shí),要先升壓,使其達(dá)到試驗(yàn)壓力值的50%,然后再停止升壓并且保持十分鐘,對(duì)焊縫、閥門進(jìn)行檢查,看看是否存在管道變形、泄露等問題。如果一切都正常,就繼續(xù)按照試驗(yàn)壓力值的10%逐漸地升壓,一直達(dá)到所需的試驗(yàn)壓力值,在此過程中,每一級(jí)穩(wěn)壓都要維持三分鐘,達(dá)到標(biāo)準(zhǔn)后,穩(wěn)壓就要持續(xù)五分鐘,要是沒有出現(xiàn)管道變形、壓降等問題,就可以降壓到設(shè)計(jì)壓力值了。在對(duì)焊縫、法蘭口、閥門進(jìn)行檢查時(shí),可以使用涂抹肥皂水的辦法使壓力維持30分鐘不變,要是壓力沒有出現(xiàn)下降的情況,就表示合格。
1.4管道的復(fù)位
在試壓結(jié)束并且得到合格的數(shù)據(jù)后,需要馬上做好管道復(fù)位的工作,對(duì)一些臨時(shí)的添加物、雜物,比如膏板等進(jìn)行清除。系統(tǒng)完全封閉,更換所有正式墊片的部件,調(diào)整平行的度數(shù),使得出場(chǎng)數(shù)據(jù)和連接軸設(shè)備保持一致,并且進(jìn)行反復(fù)的調(diào)試使其符合相應(yīng)的施工要求。施工結(jié)束后,拆除臨時(shí)搭建的支架,并且再次檢查吊架和正式支架,以保證施工符合設(shè)計(jì)圖紙。
1.5管道的清洗和吹掃
在對(duì)系統(tǒng)進(jìn)行清洗和吹掃時(shí),多使用水清洗以及空氣吹掃的方式。空氣吹掃通常都使用儀表風(fēng)或者是工業(yè)風(fēng),由于壓力以及風(fēng)流量等有一定的不穩(wěn)定性,目測(cè)很難判斷是否吹掃干凈了,這個(gè)時(shí)候,就可以把干凈的木板或者紙板遮擋在排氣口來進(jìn)行監(jiān)測(cè),如果木板或者紙板上面有鐵銹、殘?jiān)?、灰塵等贓物,就表示不合格。在進(jìn)行水清洗的時(shí)候,要保持水流不斷,水流應(yīng)該排入附近的排水井或者溝渠。除了有明確的規(guī)定外,可以使用目測(cè)的方式來檢測(cè),要是出口的水色還有透明度都和入口的一樣,就表示合格了。
1.6管道材料的選擇
傳統(tǒng)的給排水管線中多使用球墨鑄鐵管或者混凝土管,雖然價(jià)格比較便宜,但是存在管材易碎、不耐腐蝕、使用壽命較短的問題,而且,水管的重量以及體積都比較大,給施工帶來極大的不便。因此在設(shè)計(jì)新方案的時(shí)候,多使用先進(jìn)的新型管材,如UPVC管或者HDPE纏繞管等,來改善水利運(yùn)行的條件不過,這需要根據(jù)工程的實(shí)際情況來設(shè)計(jì),進(jìn)行選擇。
2.市政給排水工程管線施工工藝
2.1市政給排水工程管線施工中應(yīng)該注意的問題
在進(jìn)行市政給排水工程管線施工中,需要注意下列幾方面的問題:第一,在管道下溝時(shí),為了使管線不受到腐蝕損壞,應(yīng)該把管線的兩端嚴(yán)密的封閉,并且還要保證管線內(nèi)部的清潔,不能摻入雜物;第二,在施工過程中,施工人員需要先深入的分析場(chǎng)地環(huán)境,并且按照工程圖紙上面標(biāo)記的位置對(duì)施工現(xiàn)場(chǎng)進(jìn)行確認(rèn),確認(rèn)一切都正常之后,才能夠進(jìn)行施工;第三,在地管管溝上部挖出之后要全部放在一邊,溝槽開挖后一定要夯實(shí)管底,并且再次檢查并確認(rèn)管道的標(biāo)高和坐標(biāo)。
2.2市政給排水工程管線施工中應(yīng)該遵守的原則
在進(jìn)行市政給排水工程管線施工中,要遵循下面幾個(gè)原則:第一,在管線施工初步完成后,施工人員要全面檢查各個(gè)部件,尤其要注意檢查管道是否存在滲漏的情況,如果發(fā)現(xiàn)問題應(yīng)該及時(shí)的進(jìn)行處理;第二:在施工時(shí),施工人員要及時(shí)的向上級(jí)工程管理人員匯報(bào)進(jìn)度,有效的協(xié)調(diào)施工中的各項(xiàng)環(huán)節(jié),確保不對(duì)工程中的其他工程項(xiàng)目造成影響和破壞,使得工程的整體施工質(zhì)量得到提高。
2.3支架、吊架施工的注意事項(xiàng)
在工程管線施工中,支、吊架的施工要注意幾個(gè)問題:第一,注意調(diào)整支架、吊架的穩(wěn)定度以及平整度,使其保持在科學(xué)合理的狀態(tài);第二,施工人員要認(rèn)真記錄施工的內(nèi)容以及調(diào)節(jié)方案;第三:施工人員在焊接結(jié)束后要嚴(yán)格檢查焊接的縫隙,不能出現(xiàn)焊接松動(dòng)或者其他的質(zhì)量不合格的情況;第四:施工人員要仔細(xì)檢查支架、吊架的安裝位置,保證和工程圖紙上面標(biāo)注的位置相符合。
2.4閥門施工的注意事項(xiàng)
工程中,閥門的施工要注意以下問題:第一,調(diào)試閥門的時(shí)候,施工人員要留出一定的調(diào)試時(shí)間,并且對(duì)閥門采取一系列恰當(dāng)?shù)谋Wo(hù)措施,避免在閥門調(diào)試的過程中破壞其他各類儀器和設(shè)備;第二,在閥門安裝之前,施工人員要準(zhǔn)確的全面檢查工程圖紙,還要特別注意物質(zhì)在管線內(nèi)部的流動(dòng)情況,并且根據(jù)具體情況采用恰當(dāng)?shù)姆椒▉戆惭b閥門,最后,在檢測(cè)閥門密閉性的時(shí)候,再次對(duì)各項(xiàng)操作設(shè)備進(jìn)行恰當(dāng)?shù)恼{(diào)整。
結(jié)束語:
市政工程機(jī)排水管線的施工建設(shè)對(duì)城市的發(fā)展以及居民的生活有著非常重要的意義,在管線工程中,施工工藝也在某種程度上代表了城市的建設(shè)水平,因此,市政給排水工程管線的施工工藝必須得到相關(guān)技術(shù)人員和部門的重視,希望施工技術(shù)能更加先進(jìn)和成熟。
參考文獻(xiàn):
篇5
關(guān)鍵詞:市政道路,管線防滲漏工藝,注意事項(xiàng)
Abstract: With the development of human life and constantly improve the level of the national economy, the municipal road construction of the pipeline is in the trend of increasing. Construction of pipeline engineering is perfect, has an important influence on the surrounding residents daily life. Here, the construction of municipal roads and pipelines leakage prevention technology makes the simple discussion.
Key words: municipal roads, leakage preventing process pipeline, matters needing attention
中圖分類號(hào):TU99文獻(xiàn)標(biāo)識(shí)碼A 文章編號(hào)
居民生活小康化,生活水平逐步提高,對(duì)各方面的需求也日益增多,社會(huì)所提供的需求也隨之完善起來。供暖、供水作為生活中最基本的需求也日益多樣化,與之伴隨的道路下面的管線也變得錯(cuò)綜復(fù)雜。這就要求管線施工人員依據(jù)實(shí)際情況做出最為合理的設(shè)計(jì),根據(jù)當(dāng)?shù)氐牡匦我约叭藗兊纳盍?xí)慣,讓整個(gè)管線設(shè)計(jì)合理化、科學(xué)化,方便以后的使用和維修。管線滲漏問題是目前大多數(shù)管線施工單位面臨的相當(dāng)嚴(yán)重的問題,在管線施工過程中做好防滲漏措施就顯得尤其重要。
一:市政道路的意義所在
目前大多數(shù)市政道路建設(shè)都伴隨著管線工程的施工,管線工程是市政道路建設(shè)中的一個(gè)重點(diǎn)。由于管線工程的工作地點(diǎn)位于地面之下,具有一定的神秘感,一般普通百姓或者非管線工程施工人員無法洞悉其中的具體過程。但管線工程關(guān)系著居民的供暖與供水,直接影響著居民的生產(chǎn)生活,所以居民對(duì)其關(guān)注程度較高。管線道工程的施工也關(guān)系著市政道路的建設(shè)質(zhì)量,所以道路建設(shè)人員對(duì)此關(guān)注度也相當(dāng)之高。種種因素分析,管線工程的施工需要具備高質(zhì)量和較高的完成水準(zhǔn),既能造福周圍千千萬萬的人民群眾也能方便市政道路的建設(shè)。一旦管線工程的施工質(zhì)量達(dá)不到相關(guān)質(zhì)檢部門的質(zhì)量指標(biāo),不僅會(huì)影響居民的日常生活還會(huì)對(duì)市政道路的建設(shè)造成最直接的破壞,對(duì)整個(gè)社會(huì)的經(jīng)濟(jì)發(fā)展也會(huì)形成巨大的沖擊,市政道路在無形中對(duì)管線施工的防滲漏工藝起到較大的推動(dòng)作用。
二:滲漏的原因所在
施工的方法存在誤區(qū)
管線施工過程中由于采取的方法不正確,在一些關(guān)鍵部位沒有采取與之相適應(yīng)的連接方法,而是采取了一般的手段,這樣在使用過程中無疑會(huì)造成滲漏故障。在煙道處,管道直接連接部位一定要鑲嵌完整,不能出現(xiàn)任何縫隙,一些交接部位還需做好防水措施等等,如果在一些小的細(xì)節(jié)部位關(guān)注不到,那管線施工工程滲漏是不可避免的,只有關(guān)注每一個(gè)部位,才能將失誤率降到最低,從而在最大程度上造福人民,配合市政道路的建設(shè)。
施工過程中管理不夠嚴(yán)密
管線施工過程中,沒有配備具備專業(yè)知識(shí)的人進(jìn)行全程監(jiān)督??赡苤皇峭A粲谧霰砻婀ぷ?,表面上做的風(fēng)生水起,實(shí)際上內(nèi)部比較混亂,缺少專業(yè)的施工工作人員,使得安裝與建筑不能良好地配合起來。工作人員對(duì)管線施工的質(zhì)量要求也不高,不能做到嚴(yán)于律己,不能要求自己做到最好,這時(shí)候如果有管理人員在旁邊督促,一定會(huì)起到相當(dāng)好的效果。所以找到合適的管理人員對(duì)于市政道路的管線防滲漏工藝也有很大的積極意義。
原材料選擇不當(dāng)
管道材料選擇是否符合標(biāo)準(zhǔn)也會(huì)直接影響到管線工程施工的質(zhì)量,現(xiàn)代科技技術(shù)越來越發(fā)達(dá),相應(yīng)的出現(xiàn)了各種各樣的管道,不銹鋼的,銅的,鋼塑的,塑料的等等。在施工過程中,采購人員對(duì)管線需求不夠了解,從而在購買過程中出現(xiàn)購買偏差的現(xiàn)象。比如應(yīng)該買不銹鋼管的他買成塑料管,應(yīng)該買銅管的他買成不銹鋼管,這在不同的地方所起的作用可能存在天壤之別。所以在購買過程中材料的選擇對(duì)管線施工的質(zhì)量有著重大的影響,采購人員在購買過程中應(yīng)該盡量避免選擇誤區(qū),做到對(duì)應(yīng)購買、正確購買,這以便于市政道路建設(shè)過程中管線施工的防滲漏工藝的實(shí)施。
三:市政道路管線施工工程防滲漏采取的措施
上面提到的,在管線原材料選擇方面,采購人員在選擇時(shí)可能存在理解性偏差。管線材料的選擇應(yīng)該考慮多方面的因素,管道安裝地位的地形以及土壤酸堿度,供水管道還應(yīng)該考慮水管所能承受的水壓范圍,供暖管道,相應(yīng)的則要考慮水管熱漲冷縮的的效用。這些因素考慮不到位都會(huì)直接影響管道接口處的是施工質(zhì)量,往往由于一些小的細(xì)節(jié)沒有注意到,而使得管線在使用過程中出現(xiàn)滲漏現(xiàn)象。采購人員在購買時(shí),除了了解管道的性質(zhì)之外,還需選擇正規(guī)的供貨渠道,選擇正規(guī)的生產(chǎn)廠商,切忌為了貪圖便宜而選擇那些沒有經(jīng)過質(zhì)監(jiān)部門檢驗(yàn)的假冒偽劣產(chǎn)品。包括一些小的零配件的選購盡量選擇同一供貨商,盡可能減少外在因素帶來的不便,只有注意到這些,管線的防滲漏工藝才會(huì)慢慢向前推進(jìn)。
管線材料選擇正確的基礎(chǔ)之上,還要對(duì)圓管做進(jìn)一步的清理工作。也就是一般意義上的管材鑿毛,所謂管材鑿毛就是把圓管接頭部位清理的相對(duì)光滑,讓其在連接過程中能夠緊密契合,避免連接過程中因?yàn)楫愇锏拇嬖诙鴮?dǎo)致連接失敗的現(xiàn)象。之所以要進(jìn)行管材鑿毛,是因?yàn)樵诠懿某鰪S的時(shí)候,廠商并沒有對(duì)管材進(jìn)行細(xì)加工,從而導(dǎo)致圓管接頭處不夠光滑平整。所以施工人員要對(duì)其進(jìn)行相應(yīng)的處理,同時(shí)還應(yīng)注意處理圓管接頭部位時(shí)盡量把長(zhǎng)度控制在三厘米,如果處理過度會(huì)對(duì)圓管本身的質(zhì)量造成損傷,這就有點(diǎn)得不償失。
管線施工過程中還應(yīng)高度重視接縫部位的質(zhì)量,如果關(guān)鍵部位沒有處理好,那后續(xù)的一系列工作都會(huì)受其干擾。施工人員應(yīng)該嚴(yán)格按造圖紙的要求,保證施工質(zhì)量高度達(dá)標(biāo),因地制宜,適時(shí)調(diào)整。管線底部混凝土的建筑是為了保證管線接縫處發(fā)生變形或出現(xiàn)裂縫的現(xiàn)象,底部混凝土的構(gòu)筑應(yīng)該在適當(dāng)?shù)臅r(shí)機(jī)進(jìn)行,以免對(duì)管線連接造成干擾。在管線施工完成之后還應(yīng)派專業(yè)人士進(jìn)行周密的質(zhì)量檢查,保證質(zhì)量、數(shù)量、安裝位置都符合相應(yīng)的要求。市政道路管線施工一般是分階段完成的,在這過程中可以穿插相應(yīng)的檢查,一監(jiān)督施工完成質(zhì)量。閉水試驗(yàn)就是在一個(gè)階段的施工完成之后檢查管線是否是完全封閉的,以檢測(cè)管線是否出現(xiàn)滲漏。一旦發(fā)現(xiàn)滲漏,應(yīng)該立即將這個(gè)部位標(biāo)注出來,隨即進(jìn)行相應(yīng)的維修,反復(fù)試驗(yàn),直到?jīng)]有滲漏現(xiàn)象出現(xiàn)為止。管線工程的防漏工藝需要注意到方方面面,只有將這些全部處理好,防漏工藝才會(huì)邁上一個(gè)新的臺(tái)階。
結(jié)語:
由于管線工程施工的質(zhì)量關(guān)系著千千萬萬居民的日常生產(chǎn)生活,一旦出現(xiàn)滲漏現(xiàn)象,不僅僅會(huì)給居民帶來極大的不便,而且會(huì)對(duì)市政道路建設(shè)造成極大的負(fù)面沖擊。管線施工工程防滲漏工藝的完善,離不開整個(gè)施工團(tuán)隊(duì)的相互合作,只有保證每個(gè)環(huán)節(jié)層層嵌套,相互配合,不斷完善施工質(zhì)量,才能在真正意義上造福人民,為市政道路建設(shè)提供便利,為國家經(jīng)濟(jì)建設(shè)貢獻(xiàn)一份力量。
參考文獻(xiàn):
【1】馬偉國.淺談市政道路管線施工中的防滲漏施工技術(shù)措施【J】.交通建設(shè)2012,(11)
【2】趙倩倩、馬 潔.市政道路管線施工的防滲漏工藝探討【J】.施工技術(shù).2012,(11)
【3】周向云.論市政道路管線施工的防滲漏工藝探討【J】.城市建設(shè)理論研究.2012,(13)
【4】藍(lán)新幸、王猛.淺談市政道路管線綜合設(shè)計(jì)【J】.林業(yè)科技情報(bào).2007,(02)
篇6
【關(guān)鍵詞】石油;天然氣管道;焊接工藝;現(xiàn)狀;展望
Abstract Liaohe Oilfield, the main production area is located in the Liaohe River Delta National Nature Reserve. Natural gas as a clean energy, hazardous substance emissions are far below the level of emissions of coal, crude oil and other fuels. After the implementation of the project, compared with the burning of crude oil, Liaohe Oilfield average annual emission reduction SO2, smoke, dust and CO2 were 2425t, 3525t and 110 × 104t, provided favorable conditions for ecological protection. At the same time, the project is also in line with the country's macroeconomic policy. The Liaohe oil, natural gas pipeline welding technology status quo simple instructions, outlook and prospects for their development.
Key words oil; natural gas pipelines; welding process; status quo; Outlook
中圖分類號(hào):TG406 TG439.8
秦皇島-沈陽天然氣管道在2009年底建成,經(jīng)盤錦末站進(jìn)入遼河供氣管網(wǎng),不僅能滿足遼河油田生產(chǎn)要求,同時(shí)可以提高原油商品量,還能充分利用現(xiàn)有管網(wǎng)為周邊市場(chǎng)和化工民用市場(chǎng)提供充足的天然氣資源。使逐漸萎縮的天然氣市場(chǎng)再次興旺,同時(shí)還可以在京沈大管道建成投產(chǎn)后,緩解市場(chǎng)初期開發(fā)、用量較小的問題,能充分盤活油田天然氣板塊的資產(chǎn),為國家創(chuàng)造了更多的利潤。 利用天然氣替代油制品后,原油的深加工也會(huì)創(chuàng)造更多的經(jīng)濟(jì)效益。
一、工程概況
遼河油田天然氣利用工程包括了以下的兩部分:供氣干線管網(wǎng)部分以及配氣管網(wǎng)部分。供氣干線管網(wǎng)全長(zhǎng)為145.4km,分為西線管網(wǎng)與東線管網(wǎng)部分。西線管網(wǎng)設(shè)計(jì)輸量為25.52×108m3/a,東線管網(wǎng)設(shè)計(jì)輸量為10.15×108m3/a。設(shè)計(jì)壓力西線為2.6MPa,東線為3.9MPa,管道材質(zhì)L360MB。配氣管線全長(zhǎng)240.26km,管徑從DN60到DN550不等,設(shè)計(jì)壓力為0.6MPa,管道材質(zhì)為L(zhǎng)245或20#鋼。
二、石油、天然氣管道焊接的發(fā)展現(xiàn)狀
早期的石油、天然氣輸送管道所用到的材料絕大多數(shù)是一般的低碳鋼,因此它的管道設(shè)計(jì)壓力以及口徑都相對(duì)較小,其輸送效率也相對(duì)較低。隨著石油企業(yè)的發(fā)展,其運(yùn)輸管道也得到了一定程度的改良,管道的口徑、設(shè)計(jì)壓力以及運(yùn)送率都得到了明顯的提高。這種管道的出現(xiàn)雖然在一定程度上提高了企業(yè)的經(jīng)濟(jì)效益,不過它對(duì)管道的焊接工藝也提出了更高的要求。
三、本工程的管道焊接檢測(cè)、試壓、干燥
(一)管線焊接及檢測(cè)
該工程線路焊接采用手工焊接方式,管道焊接及驗(yàn)收必須執(zhí)行《油氣長(zhǎng)輸管道工程施工及驗(yàn)收規(guī)范》(GB 50369-2006)。對(duì)于一般管段管道環(huán)焊縫無損探傷進(jìn)行100%射線探傷(RT);穿越大中型河流、主要公路、鐵路和死口段的焊縫,采用100%的X射線照相和100%超聲波探傷檢查;線路工程返修部位另進(jìn)行100%超聲波探傷,角焊縫另進(jìn)行100%滲透探傷。符合《石油天然氣鋼質(zhì)管道無損檢測(cè)》(SY/T 4109-2005)的相關(guān)規(guī)定。
(二)管道焊接工藝中的試壓、干燥
在對(duì)管道進(jìn)行焊接的過程中,除一般地段的試壓要求外,河流穿越、三級(jí)及三級(jí)以上公路穿越、線路閥室均單獨(dú)進(jìn)行強(qiáng)度試壓。試壓介質(zhì)為水,試壓水源選擇坨子里首站水源,現(xiàn)場(chǎng)水箱配置過濾器進(jìn)行過濾沉淀,安裝流量計(jì)進(jìn)行試壓水計(jì)量,并有合格的水質(zhì)檢測(cè)報(bào)告。強(qiáng)度試驗(yàn)壓力為1.5倍設(shè)計(jì)壓力,試壓時(shí)間為4h。合格后進(jìn)行嚴(yán)密性試驗(yàn),壓力為設(shè)計(jì)壓力,試壓時(shí)間為24h。
在試壓前,保證4次通球掃線,如果雜物過多或判斷沒有掃干凈,再次進(jìn)行清管作業(yè),直到合格。在管道水試壓結(jié)束后以及投產(chǎn)之前,進(jìn)行了管道內(nèi)水份的清除和管道干燥,采用預(yù)干燥的無油壓縮干空氣(露點(diǎn)低于-40℃)對(duì)管道進(jìn)行干燥,當(dāng)排出空氣露點(diǎn)達(dá)到-20℃度時(shí),為干燥合格。在末端露點(diǎn)達(dá)到-20℃以下,關(guān)閉首末端所有閥門,密閉4小時(shí)使管線內(nèi)的干燥空氣與潮氣充分混合吸附。密閉實(shí)驗(yàn)后露點(diǎn)升高不超過3℃,且不高于-20℃的空氣露點(diǎn)為合格。
管道內(nèi)空氣的置換在強(qiáng)度試壓、嚴(yán)密性試壓、吹掃清管、干燥合格后進(jìn)行,采用氮?dú)庾鳛楦綦x介質(zhì),站間進(jìn)行全線置換。置換管道末端配備氣體含量檢測(cè)設(shè)備,當(dāng)置換管道末端放空管口氣體含氧量不大于2%時(shí)即為置換合格。站場(chǎng)同樣在試壓后清掃排水和干燥,使用預(yù)干燥的無油壓縮干空氣(露點(diǎn)低于-40℃)對(duì)管道進(jìn)行干燥。
四、管道的鋪設(shè)施工焊接新工藝及其展望
(一)高能束焊接
這種焊接工藝主要有電子束焊以及激光焊
1、電子束焊
電子束焊的管道焊接方法是由法國的Total石油公司提出的。大量的工程實(shí)踐證明,該技術(shù)在石油、天然氣管道焊接的過程中具有質(zhì)量高、速度快等優(yōu)點(diǎn),不過這種管道焊接工藝在實(shí)際的運(yùn)用過程中仍有大量的問題急待解決。比如,施工過程中電壓普遍偏高、不能獲得較高的功率密度、容易產(chǎn)生較多的X射線、管口的對(duì)接誤差偏高、需要特制的對(duì)口器。
2、激光焊
目前,最常用到的激光焊接技術(shù)有CO2激光焊以及YAG激光焊?,F(xiàn)在使用的CO2激光焊可以對(duì)壁厚為20毫米的的鋼線管進(jìn)行焊接,使其一次成型。大量的實(shí)踐研究表明,激光焊在石油天然氣管道焊接過程中具有焊接時(shí)間短、施工的程序簡(jiǎn)單以及施工的質(zhì)量較好等方面的優(yōu)點(diǎn)。
(二)徑向摩擦焊與攪拌摩擦焊
1、徑向摩擦焊
徑向摩擦焊主要是在兩端頂鍛以及中心工件旋轉(zhuǎn)連續(xù)驅(qū)動(dòng)摩擦焊的基礎(chǔ)上進(jìn)行改良的,在管道鋪設(shè)的實(shí)際施工過程中,如果管道太長(zhǎng),用普通的軸向摩擦焊機(jī)根本就不能實(shí)現(xiàn)軸向加壓頂鍛的施工方法。因此徑向摩擦焊施工工藝就被運(yùn)用到石油、天然氣管道焊接的施工工藝中。徑向摩擦焊施工工藝的主要優(yōu)點(diǎn)有以下三種,一是該工藝的連續(xù)效果較好;二是該工藝所焊接的管道的質(zhì)量較好,并具有較高的重復(fù)使用性能;三是該工藝對(duì)于連接成本較高、不能用常規(guī)的焊接工藝來施工的管道有較好的效果。
2、攪拌摩擦焊
攪拌摩擦焊是一種固態(tài)的焊接方法,它是目前石油、天然氣管道焊接技術(shù)中的重點(diǎn)研究對(duì)象,它在輕金屬的焊接領(lǐng)域較為實(shí)用。與傳統(tǒng)的熔焊工藝相比,該焊接工藝具有焊接環(huán)境良好、接頭處的焊接性能較好、焊接質(zhì)量高等方面的優(yōu)點(diǎn)。
隨著攪拌摩擦焊技術(shù)的不斷發(fā)展,該焊接技術(shù)在管道施工領(lǐng)域得到了廣泛的運(yùn)用。該技術(shù)在使用過程中,主要存在以下兩種問題:一個(gè)是攪拌頭與夾持機(jī)構(gòu)的整體環(huán)向運(yùn)動(dòng)以及它的加壓焊接;二是在對(duì)其焊接設(shè)備的攪拌頭進(jìn)行設(shè)計(jì)制造時(shí),需要用到強(qiáng)度較高的鋼材。
五、結(jié)束語
隨著石油、天然氣工程的不斷發(fā)展,各類管道焊接技術(shù)也在某種程度上得到了很大的提升。油田企業(yè)的發(fā)展及其運(yùn)輸能力的增強(qiáng),油氣運(yùn)輸管道的耐壓力、壁厚以及管道的口徑也在一定程度上提出了更高的要求。在未來的石油、天然氣管道焊接過程中,電子束焊以及激光焊等一系列的先進(jìn)焊接技術(shù)必定會(huì)被用到各類管道的焊接工作中。
【參考文獻(xiàn)】
[1] 周軍,張春波,齊秀濱等.石油、天然氣管道焊接工藝現(xiàn)狀及展望[J].焊接,2011,(8):4-9.
[2] 隋永莉,王福柱,李廣民等.長(zhǎng)輸管道建設(shè)中焊接設(shè)備的應(yīng)用現(xiàn)狀與發(fā)展趨勢(shì)[J].電焊機(jī),2006,36(12):1-3.
[3] 林金平,吳崇志.窄間隙焊技術(shù)在核電建設(shè)中的應(yīng)用[J].電焊機(jī),2011,41(9):16-20.
篇7
摘要:文章通過總結(jié)多條高速公路擴(kuò)建工程施工,對(duì)中國高速公路拓寬初期存在的問題、現(xiàn)狀作了分析,對(duì)高速公路擴(kuò)建工程的橋梁施工現(xiàn)場(chǎng)管理方法進(jìn)行了總結(jié)。 關(guān)鍵詞:高速公路;拓寬工程;橋梁施工;管理
中圖分類號(hào): K928 文獻(xiàn)標(biāo)識(shí)碼: A 文章編號(hào): 高速公路拓寬的特點(diǎn)是:場(chǎng)地狹小、每座橋梁的拼接工程量不是太大,甚至要分左右半幅施工、交叉施工頻繁、交通組織工作量大、技術(shù)含量高。前期規(guī)劃、設(shè)計(jì)、施工及計(jì)劃經(jīng)濟(jì)時(shí)期遺留問題較多,加上業(yè)主、設(shè)計(jì)單位、監(jiān)理單位當(dāng)初均無高速公路拓寬經(jīng)驗(yàn),同時(shí)由于環(huán)境、地理因素的特殊性,拓寬的難度是其他新建項(xiàng)目無法比擬的。 1高速公路拓寬施工在橋梁施工現(xiàn)場(chǎng)組織管理中的難題 (1)高速公路設(shè)計(jì)的前期規(guī)劃和通車后地方政府對(duì)下穿高速公路道路的改建以及沿線民用建筑、公共設(shè)施,使得拓寬涉及面廣而復(fù)雜。 (2)單個(gè)中小橋的工程量小、施工點(diǎn)分散與沿線交通干擾大,如何保證施工計(jì)劃的完成,在確保高速公路和地方道路安全暢通的前提下,保證施工的質(zhì)量和進(jìn)度、保證施工機(jī)械和人員安全等問題貫穿于拓寬項(xiàng)目施工過程的始終。 (3)上部構(gòu)造施工時(shí),按交通管制的要求,2 km~3 km同側(cè)新老梁板必須同時(shí)拼接。如何確保所有拼接縫的50號(hào)鋼纖維混凝土在相同時(shí)間內(nèi)達(dá)到設(shè)計(jì)強(qiáng)度,以適應(yīng)在一般情況下開放一個(gè)車道、特殊情況下全部開放交通的要求。 (4)一旦接到交警支隊(duì)的通知,在規(guī)定的時(shí)間內(nèi)就得清理施工現(xiàn)場(chǎng)、中斷施工,如何組織才能做到既不影響施工質(zhì)量又符合交警的要求。 2施工管理 2.1加強(qiáng)協(xié)調(diào)工作 20世紀(jì)90年代末期,中國高速公路股份有限公司一般是在修建初期才組建的,個(gè)別地方政府的產(chǎn)權(quán)意識(shí)不是太強(qiáng),在管線橫穿高速公路時(shí)沒有在相關(guān)機(jī)構(gòu)登記,因而在高速公路拓寬的征地范圍內(nèi)有不少的管線在相關(guān)的圖紙上并未標(biāo)明,對(duì)業(yè)主的拆遷工作影響很大,也影響到施工單位進(jìn)場(chǎng)后的施工。橋梁拓寬涉及以下單位:高速公路交警支隊(duì)、地方路政、水利部門、航道部門、土管局、有關(guān)的鄉(xiāng)鎮(zhèn)、村委會(huì)、各種管線的相關(guān)單位或個(gè)人。針對(duì)點(diǎn)多、涉及面廣的情況,作為施工單位,要主動(dòng)配合業(yè)主加強(qiáng)協(xié)調(diào)工作、主動(dòng)與相關(guān)單位或個(gè)人聯(lián)系,必要時(shí)可配合有關(guān)從事拆遷的單位挖溝清障,將拆遷工作向前推進(jìn),努力創(chuàng)造施工條件。 2.2發(fā)揮主觀能動(dòng)性。 強(qiáng)化管理高速公路的每側(cè)征l~2個(gè)車道的用地,施工機(jī)具搬遷次數(shù)增多,施工中要確保高速公路的安全暢通,交通干擾大、鉆孔的泥漿必須外運(yùn)等因素造成單位時(shí)間內(nèi)完成的工作量少。新老梁板拼接時(shí),施工人、員、機(jī)具幾乎與行駛車輛處于同一平面位置,安全系數(shù)大大降低。為了實(shí)現(xiàn)管理目標(biāo),根據(jù)項(xiàng)目的現(xiàn)狀,宜采取以下措施: 2.2.1精細(xì)化管理,適應(yīng)環(huán)境 要加強(qiáng)計(jì)劃的落實(shí),施工負(fù)責(zé)人要常深入作業(yè)隊(duì)作一些必要的動(dòng)員和督促工作,定期召開生產(chǎn)調(diào)度會(huì),總結(jié)前段工作,制訂下階段的工作計(jì)劃,商討解決問題的辦法;制定詳細(xì)的作業(yè)指導(dǎo)書指導(dǎo)施工,工程部署。橋梁縱向拼接縫、橋梁的防撞護(hù)欄拆除,受交通量、、業(yè)主修補(bǔ)路面的影響很大,施工單位必須專門成立安全管理小組,配置了預(yù)警車、通訊工具及其他裝備,按照高速公路交警的要求配備交通標(biāo)志、標(biāo)牌,給作業(yè)隊(duì)創(chuàng)造良較好的施工環(huán)境。在確保高速公路安全暢通的條件下進(jìn)行拓寬施工,最理想的辦法是在有良好的交通組織條件下,盡量縮短在高速公路旁的作業(yè)時(shí)間,但施工時(shí)間的減少只能是通過提高勞動(dòng)效率來實(shí)現(xiàn)的,因此,施工機(jī)械的投入顯得十分重要。 2.2.2周密部署 接樁、墩身、墩帽混凝土方量小、產(chǎn)值低、質(zhì)量要求較高;橋梁拼接技術(shù)難度大、工效低;拆除老的結(jié)構(gòu)物,安全組織的工作量大、成本高??梢越o作業(yè)隊(duì)簽訂《責(zé)任狀》,定質(zhì)量標(biāo)準(zhǔn)、定獎(jiǎng)罰措施,驗(yàn)收合格后給予獎(jiǎng)勵(lì);對(duì)施工進(jìn)度滯后的作業(yè)隊(duì)通過分析整改、補(bǔ)充設(shè)備、增加勞動(dòng)力、任務(wù)分割等辦法,保證施工任務(wù)的按期完成。
2.2.3規(guī)范管理,加強(qiáng)環(huán)保意識(shí) 中標(biāo)后,原材料價(jià)格波動(dòng)比較大,為了降低成本,主材可由物質(zhì)部統(tǒng)一招標(biāo)供應(yīng)。地材由物質(zhì)部供應(yīng)商協(xié)商,采取先付款后使用的辦法,將單價(jià)壓到底線,統(tǒng)一供應(yīng)。這類措施能緩和材料供應(yīng)的緊張局面,解決用料問題。 為防止泥漿污染河道,與河道上施工鉆孔樁的作業(yè)隊(duì)?wèi)?yīng)簽訂《環(huán)保協(xié)議》、《河道施工安全協(xié)議》,施工期間請(qǐng)航道及水利部門監(jiān)督、檢查指導(dǎo),施工完畢請(qǐng)航道及水利部門對(duì)河道驗(yàn)收,并將宣傳與檢查落實(shí)、驗(yàn)收和獎(jiǎng)罰措施結(jié)合起來,這一管理措施可促使作業(yè)隊(duì)加強(qiáng)保護(hù)環(huán)境意識(shí),得力的措施可使橋梁結(jié)構(gòu)物施工保持良好的勢(shì)頭。 2.3加強(qiáng)技術(shù)追蹤,開展科研活動(dòng) 老的橋梁可能存在跨徑過大或過小,軸線偏位、墩臺(tái)帽下?lián)?、扭?由于不均勻沉降造成墩臺(tái)帽裂縫、梁板斷裂、橋臺(tái)及搭板下坍空等問題。施工前要對(duì)全線的橋梁進(jìn)行調(diào)查,了解各個(gè)橋梁的實(shí)際情況,及時(shí)與監(jiān)理、業(yè)主、設(shè)計(jì)院溝通,組織專家會(huì)診,既要充分考慮地方道路或通航要求,又要考慮橋梁的使用功效,適時(shí)地采取環(huán)氧樹脂膠液閉縫、黏貼鋼板、碳纖維補(bǔ)強(qiáng)、體外預(yù)應(yīng)力等技術(shù)措施對(duì)橋梁進(jìn)行維修加固。 2.4強(qiáng)化質(zhì)量意識(shí),實(shí)現(xiàn)總體目標(biāo) 堅(jiān)持項(xiàng)目經(jīng)理是質(zhì)量第一責(zé)任人的方針,強(qiáng)化由總工程師領(lǐng)導(dǎo),質(zhì)量檢測(cè)部牽頭的試驗(yàn)、測(cè)量、質(zhì)檢三位一體的縱向到底、橫向到邊的質(zhì)量保證體系,以“營造品質(zhì),保護(hù)自然,以人為本,追求卓越”為旨,貫徹沒有質(zhì)量的進(jìn)度是無效進(jìn)度的指導(dǎo)思想,完善技術(shù)管理制度,加大對(duì)原材料的抽檢頻率,現(xiàn)場(chǎng)工程師對(duì)隱蔽工程、重點(diǎn)部位、關(guān)鍵工序和薄弱環(huán)節(jié)跟班作業(yè),全過程跟蹤,防止質(zhì)量通病,發(fā)現(xiàn)問題及時(shí)報(bào)告、及時(shí)查找原因、及時(shí)糾正,同時(shí)根據(jù)施工工藝采取相應(yīng)的措施。高速公路施工中,不能孤立地從橋梁管理的本身去考慮如何提高橋梁施工的效率,還需要考慮橋梁施工對(duì)路基、路面施工的影響和制約,做到統(tǒng)籌兼顧。在安排生產(chǎn)時(shí),首先要考慮到在無施工便道的情況下,臺(tái)后的位置是借助地方道路運(yùn)送路基填料的必經(jīng)之路。模板和材料的堆放,要盡量利用舊邊溝或荒地。根據(jù)路基填筑的先后,決定墩臺(tái)施工的順序。根據(jù)路面施工的段落次序,確定大梁吊裝、橋面、搭板、橋梁拼接的施工順序,以實(shí)現(xiàn)總體目標(biāo)。 2.5文明施工,注重安全 確保高速公路安全暢通條件下從事的拓寬工程,交通時(shí)有發(fā)生,對(duì)施工影響很大。經(jīng)理部應(yīng)將此作為一項(xiàng)重要的工作環(huán)節(jié)來抓,為了確保質(zhì)量、加快進(jìn)度,應(yīng)成立安全管理委員會(huì)和安全組織管理小組,各作業(yè)隊(duì)都配備專職安全員,專門負(fù)責(zé)進(jìn)出高速公路車輛的引導(dǎo)、指揮以及安全交通標(biāo)的擺放工作。每當(dāng)任務(wù)下達(dá),經(jīng)理部高度重視,積極組織安全員疏散施工人員,以免處理不當(dāng),造成惡劣影響。 拆除老的防撞護(hù)欄,進(jìn)行新老梁板拼接時(shí),行駛的車輛就在身邊,安全就成為重中之重的工作。安全工作歸納起來主要有三大部分:一是高速公路營運(yùn)的安全;二是施工現(xiàn)場(chǎng)的安全;三是產(chǎn)品質(zhì)量的安全。在高速公路上吊裝或從事護(hù)欄拆除、橋面系施工時(shí),就向交警上報(bào)施工計(jì)劃和安全組織方案,獲批準(zhǔn)后再著手施工。例如,匝道橋拆建時(shí),業(yè)主為了不影響其經(jīng)營收入,要求保證匝道的暢通,務(wù)必按照交警的要求,修筑一條符合高速公路等級(jí)的行車便道,設(shè)立行車標(biāo)志,派出安全員維持交通,在進(jìn)出方式、作業(yè)時(shí)間和空間上與交警密切配合,既能保證高速公路的營運(yùn)維護(hù)業(yè)主的利益,又能按期完成施工任務(wù)、保證施工質(zhì)量。在期間,盡量將混凝土的澆筑工作安排在夜間,密切配合行動(dòng),共同維護(hù)地區(qū)及行業(yè)形象。 3重視變更索賠 在市場(chǎng)經(jīng)濟(jì)條件下,要充分認(rèn)識(shí)到索賠是在合同實(shí)施過程中必然發(fā)生的也是在履行合同基礎(chǔ)上爭(zhēng)取獲得合理補(bǔ)償?shù)男袨椤T咚俟沸藿ㄎ搭A(yù)測(cè)到后期的拓寬工程,遺留了不少的問題,突發(fā)性變更多,施工現(xiàn)場(chǎng)一旦發(fā)現(xiàn)有變更的情況,就要主動(dòng)與監(jiān)理組及業(yè)主溝通,不得耽誤時(shí)間,要配合內(nèi)業(yè)工程師作好原始資料的收集整理工作。不過,作為承包人平時(shí)就要準(zhǔn)備好必要的資料,如會(huì)議記錄、氣象資料、現(xiàn)場(chǎng)照片、有關(guān)報(bào)道或文件等,以免錯(cuò)失索賠的良機(jī)。 4結(jié)束語 (1)公路是國民經(jīng)濟(jì)發(fā)展的重要基礎(chǔ)設(shè)施,高速公路拓寬對(duì)社會(huì)經(jīng)濟(jì)的發(fā)展、人民生活水平的提高會(huì)產(chǎn)生巨大的影響。 (2)企業(yè)行為的拓寬工程,受社會(huì)制約因素較多,業(yè)主、施工單位更要善于做細(xì)致的工作,積極地去尋求解決問題的途徑,以實(shí)現(xiàn)管理目標(biāo)。 (3)拓寬中的安全施工技術(shù)至關(guān)重要,必須放在首位,要在人力、物力、財(cái)力上加大投入,確保高速公路安全暢通的同時(shí)搞好安全生產(chǎn)。
篇8
關(guān)鍵詞:現(xiàn)場(chǎng)施工;安全生產(chǎn);加強(qiáng)管理;控制;改善措施
1施工安全技術(shù)措施
(1)嚴(yán)格落實(shí)安全生產(chǎn)責(zé)任制和教育培訓(xùn)體系,設(shè)立安全生產(chǎn)管理機(jī)構(gòu),配備專職安全生產(chǎn)管理人員,做好安全檢查工作。
(2)做好施工組織設(shè)計(jì)工作,按照施工組織設(shè)計(jì)合理組織施工安全作業(yè)。
(3)做好技術(shù)交底工作,在施工現(xiàn)場(chǎng)設(shè)置明顯的安全警示標(biāo)志,做好季節(jié)性施工準(zhǔn)備工作。
(4)經(jīng)常進(jìn)行預(yù)防性試驗(yàn),對(duì)機(jī)械設(shè)備做好經(jīng)常性維護(hù)保養(yǎng)和定期檢修,確保設(shè)備性能符合安全標(biāo)準(zhǔn)要求。
(5)施工現(xiàn)場(chǎng)臨時(shí)搭建的建筑物應(yīng)當(dāng)符合安全使用要求,對(duì)因建設(shè)工程施工可能造成損害的毗鄰建筑物、構(gòu)筑物和地下管線等,應(yīng)當(dāng)采取專項(xiàng)防護(hù)措施。
(6)及時(shí)發(fā)放和正確使用個(gè)人防護(hù)用品,作業(yè)人員應(yīng)當(dāng)遵守安全施工的強(qiáng)制性標(biāo)準(zhǔn)、規(guī)章制度和操作規(guī)程,正確使用安全防護(hù)用具、機(jī)械設(shè)備等。
2安全文明管理改善措施
(1)安全文明施工技術(shù)(作業(yè))體系。創(chuàng)建文明工地、推行文明施工和文明作業(yè),不僅是管理性很強(qiáng)的工作,而且也是技術(shù)性很強(qiáng)的工作。安全與文明密不可分,共處于一體,組成了安全文明的共同體;創(chuàng)建安全文明工地與推行安全文明施工技術(shù)也密不可分,組成了安全文明施工的共同體。
(2)施工安全防護(hù)和文明施工措施。施工現(xiàn)場(chǎng)的管理和文明施工是安全生產(chǎn)的重要組成部分。安全生產(chǎn)與文明施工是相輔相成的,施工安全生產(chǎn)不但要保證職工的生命財(cái)產(chǎn)安全,同時(shí)要加強(qiáng)現(xiàn)場(chǎng)管理,保證施工井然有序,改變過去臟亂差的面貌,對(duì)提高投資效益和保證工程質(zhì)量也有深遠(yuǎn)的意義。
3監(jiān)督管理改善措施
(1)技術(shù)措施。一個(gè)工程項(xiàng)目的施工,從編制施工組織設(shè)計(jì)開始,就應(yīng)同時(shí)編制安全技術(shù)措施方案,針對(duì)每個(gè)施工工序中的危險(xiǎn)點(diǎn)、危險(xiǎn)源,要有預(yù)見性地防護(hù)措施,特別是對(duì)設(shè)備,設(shè)施,操作方法等,從安全的角度考慮,有針對(duì)性制定防護(hù)措施。同時(shí),在施工過程中要抓好安全技術(shù)措施的落實(shí),包括把安全技術(shù)措施真正交底到每位職工。
(2)教育措施。安全教育要從現(xiàn)場(chǎng)實(shí)際出發(fā),實(shí)行“三級(jí)安全教育,專業(yè)技術(shù)培訓(xùn),換崗教育,復(fù)工再教育”等方法。通過安全教育,使作業(yè)者掌握一定安全知識(shí)及操作技能。安全教育不僅是指安全知識(shí)、安全技術(shù)教育,而且包括安全態(tài)度、安全思想教育。安全態(tài)度和安全思想教育就是要從人的頭腦中清除那些不正確的知識(shí)和經(jīng)驗(yàn),而代之以正確的東西。通過安全教育,不斷增強(qiáng)廣大職工的安全意識(shí)和自我防護(hù)能力。
(3)管理措施。安全管理是在生產(chǎn)活動(dòng)中的動(dòng)態(tài)管理,是一種狀態(tài),其管理就意味著是不斷發(fā)展和不斷變化,以適應(yīng)變化的生產(chǎn)活動(dòng),消除新的危險(xiǎn)因素。然而更需要的是不斷摸索新規(guī)律,總結(jié)管理、控制的辦法與經(jīng)驗(yàn),指導(dǎo)新變化后的管理,從而使安全管理不斷地上升到新的高度。因此,在預(yù)防事故的發(fā)生中,管理起著十分重要的作用。
(4)預(yù)防措施?!邦A(yù)防為主”是現(xiàn)代安全管理的基本原則,它也貫穿于建筑施工的全過程。對(duì)生產(chǎn)過程做到實(shí)時(shí)監(jiān)控,提前排除生產(chǎn)中存在的問題和潛在的危險(xiǎn),找出安全隱患存在的原因,利用生產(chǎn)安全事故應(yīng)急救援制度,做到避免事故的發(fā)生或?qū)⑹鹿蕚蛽p失降至最小程度。
(5)補(bǔ)救措施。補(bǔ)救是要徹底消除已出現(xiàn)的安全事故對(duì)產(chǎn)品生產(chǎn)和使用的不安全因素,它應(yīng)從兩個(gè)方面進(jìn)行,一方面督促企業(yè)(項(xiàng)目)完善安全管理體制,另一方面用技術(shù)上有效、經(jīng)濟(jì)上可行的措施消滅隱患,排除產(chǎn)生安全事故的因素和彌補(bǔ)因安全事故造成的后果。
(6)信息的管理措施。建筑施工安全信息是政府和企業(yè)在管理過程中一項(xiàng)十分寶貴的資源,一旦失靈,會(huì)引起安全監(jiān)督管理工作的混亂。研究生產(chǎn)系統(tǒng)中的安全信息,及時(shí)向政府和企業(yè)的決策部門提供,加強(qiáng)控制與反饋,實(shí)行動(dòng)態(tài)管理,以提高施工安全監(jiān)督管理水平。建筑施工安全生產(chǎn)一直是安全意外事件和安全事故的高發(fā)段。這不僅使群眾的生命安全和國家財(cái)產(chǎn)遭到巨大損失,還給企業(yè)和行業(yè)的發(fā)展帶來負(fù)面影響,甚至對(duì)社會(huì)穩(wěn)定和國民經(jīng)濟(jì)發(fā)展都造成了極大的威脅。如何在建筑業(yè)高速發(fā)展的同時(shí)確保建筑施工安全生產(chǎn)目標(biāo)的實(shí)現(xiàn)已成為全社會(huì)關(guān)注的焦點(diǎn)。
建筑工程安全生產(chǎn)管理,必須堅(jiān)持安全第一,預(yù)防為主,綜合治理的方針,這也是我國建筑事業(yè)的一項(xiàng)重要政策,更是企業(yè)管理的一項(xiàng)基本原則。當(dāng)前,要認(rèn)識(shí)到建筑施工安全形勢(shì)的嚴(yán)峻,責(zé)任的重大,因此,要加強(qiáng)施工現(xiàn)場(chǎng)安全管理,不斷提高施工現(xiàn)場(chǎng)安全管理水平,讓整個(gè)施工現(xiàn)場(chǎng)做到:臨時(shí)設(shè)施布局合理、材料碼放整齊、機(jī)械操作范圍明確、車輛進(jìn)出方便、工序銜接緊密、場(chǎng)地衛(wèi)生整潔,創(chuàng)建安全文明工地與推行安全文明施工技術(shù),采用安全文明施工工藝,組成安全文明施工的現(xiàn)場(chǎng)。
參考文獻(xiàn)
篇9
關(guān)鍵詞:公路監(jiān)理 施工現(xiàn)場(chǎng) 管理
中圖分類號(hào):X734文獻(xiàn)標(biāo)識(shí)碼: A
前言:公路施工的有效的完成,可以促進(jìn)當(dāng)?shù)氐慕?jīng)濟(jì),從而提升國家的國民收入,當(dāng)然,這些顯著的提升效果與公路監(jiān)理提供的幫助是分不開的。以下筆者對(duì)如何做好公路監(jiān)理工程在道路施工現(xiàn)場(chǎng)的管理工作,做出了詳細(xì)的分析,希望可以有效的提升公路監(jiān)理的水平。
1公路監(jiān)理工程的施工現(xiàn)場(chǎng)管理的重要性
1.1經(jīng)濟(jì)效益原則。工程的經(jīng)濟(jì)效益是工程進(jìn)行建設(shè)施工的最主要目的,所以在進(jìn)行現(xiàn)場(chǎng)管理時(shí),必須要重視對(duì)監(jiān)理成本的控制,避免出現(xiàn)為了趕超工程進(jìn)度和提升工程質(zhì)量而忽略施工施工成本的情況出現(xiàn)。同時(shí),還要將以最少的投入建設(shè)最具經(jīng)濟(jì)效益的工程作為工程施工的重要目標(biāo),力爭(zhēng)在工程項(xiàng)目施工中做到投入少而收益高,使每一項(xiàng)資源都能夠得到充分的利用,杜絕資源閑置和浪費(fèi)現(xiàn)象的發(fā)生,減少不合理和不必須的開支。
1.2科學(xué)合理原則。在進(jìn)行現(xiàn)場(chǎng)施工的監(jiān)理工作時(shí),要對(duì)各項(xiàng)施工工作都提出明確的要求,遵循科學(xué)合理的施工原則,對(duì)現(xiàn)場(chǎng)施工進(jìn)行科學(xué)化、合理化的管理。并且還要加強(qiáng)對(duì)操作流程以及操作方式的管理程度,確保工程施工的合理性以及工程作業(yè)流程的規(guī)范性,使現(xiàn)場(chǎng)各項(xiàng)資源都能夠得到有效的利用,對(duì)現(xiàn)場(chǎng)設(shè)備進(jìn)行合理科學(xué)的施工作業(yè)安排,到達(dá)施工現(xiàn)場(chǎng)的科學(xué)合理配置。
1.3標(biāo)準(zhǔn)化以及規(guī)范化原則。在對(duì)施工現(xiàn)場(chǎng)進(jìn)行管理時(shí),還有一項(xiàng)為基礎(chǔ)的管理要求,即做到現(xiàn)場(chǎng)施工的規(guī)范化以及標(biāo)準(zhǔn)化。這是基于工程施工質(zhì)量的保證所提出的,只有進(jìn)行規(guī)范化和標(biāo)準(zhǔn)化的施工管理,一切按照相關(guān)程序進(jìn)行施工建設(shè),才能夠使施工的質(zhì)量和施工的有效性得到明確保障。
2監(jiān)理的作用分析
公路工程監(jiān)理制度是以國際通用FIDIC條款為基礎(chǔ)而發(fā)展起來的一種建設(shè)、施工、監(jiān)理三方的管理模式。該管理模式既與市場(chǎng)經(jīng)濟(jì)發(fā)展相符,又與我國的市場(chǎng)經(jīng)濟(jì)運(yùn)行模式相適應(yīng)。實(shí)行工程監(jiān)理模式,能夠讓各參建方更明確、合理地了解自己的權(quán)責(zé)利,有效增強(qiáng)了各參與方的合同意識(shí),還有利于各方管理水平的提高。通過這樣,不但能積累更多的經(jīng)驗(yàn),且使建設(shè)項(xiàng)目管理逐漸向?qū)I(yè)化、科學(xué)化方向發(fā)展。
3公路監(jiān)理工程需做好準(zhǔn)備工作
公路監(jiān)理工程想要發(fā)揮更好的效用,比較先做好準(zhǔn)備工作,準(zhǔn)備工作的充分與否影響著對(duì)施工現(xiàn)場(chǎng)管理的有效程度。筆者根據(jù)多年經(jīng)驗(yàn),分析了公路監(jiān)理工程需要做的幾點(diǎn)準(zhǔn)備工作:
3.1完善管理機(jī)制
在對(duì)公路進(jìn)行監(jiān)理之前,監(jiān)理工程的相關(guān)部門需要建立健全的管理機(jī)制,包括對(duì)監(jiān)理人員的考核制度、激勵(lì)制度、制約制度等等。只有通過完善的管理機(jī)制,才能有效的提高工作效率,而且對(duì)公路的監(jiān)理必須依照相關(guān)規(guī)章制度,這樣才能保證監(jiān)理工程的有效性與合理性。
3.2精確公路施工設(shè)計(jì)
施工單位在施工前,需要保證施工設(shè)計(jì)的正確性與可行性,這樣才能保證施工過程的安全有效的進(jìn)行,而且在公路投入使用后才能發(fā)揮最大的效用。公路監(jiān)理工程的工作人員必須對(duì)設(shè)計(jì)方案進(jìn)行仔細(xì)檢查,對(duì)可能影響施工進(jìn)度與質(zhì)量的因素要進(jìn)行排除與標(biāo)注,然后再和設(shè)計(jì)人員與施工單位進(jìn)行討論與研究,在實(shí)踐中結(jié)合實(shí)際情況,標(biāo)注的不合格或者不合理的地方進(jìn)行修改與改進(jìn),對(duì)重點(diǎn)部位要進(jìn)行仔細(xì)核查,提高設(shè)計(jì)的質(zhì)量,提升施工進(jìn)度,并做到及時(shí)溝通與交流。
3.3檢查施工的材料與設(shè)施,加強(qiáng)施工技術(shù)
在施工前對(duì)材料以及設(shè)施的檢查也很重要,施工的材料也影響著公路的質(zhì)量,而公路監(jiān)理工程對(duì)保證材料質(zhì)量義不容辭,而且施工人員的技術(shù)水平也需要進(jìn)行培訓(xùn)與加強(qiáng),只有保證材料與施工設(shè)施的合格,施工技術(shù)過硬,才能從根源上降低公路質(zhì)量安全事故的發(fā)生。在確定施工材料、施工設(shè)施、技術(shù)水平、氣候等條件都合格后,才能進(jìn)行公路施工。
4公路監(jiān)理工程施工現(xiàn)場(chǎng)管理分析
4.1公路監(jiān)理工程需要優(yōu)化施工配置與資源
在公路進(jìn)行施工的過程中,需要監(jiān)理部門優(yōu)化施工配置與資源,保證施工的進(jìn)度與質(zhì)量。優(yōu)化施工配置與資源可以使整個(gè)施工過程更加有序的進(jìn)行,而且也可以保證資源的最大利用,可以降低施工的成本,對(duì)資源進(jìn)行的分配也更加合理化。施工的過程工序很多,而且比較復(fù)雜,只有對(duì)設(shè)施進(jìn)行合理的組合與運(yùn)用,才能簡(jiǎn)化施工操作程序,節(jié)省人力、物力、財(cái)力資源,而且也可以做到對(duì)環(huán)境資源的保護(hù)與節(jié)約。公路施工在進(jìn)行到不同進(jìn)度時(shí),對(duì)材料以及設(shè)施的需求不同,而且根據(jù)施工的實(shí)際情況,對(duì)設(shè)備以及技術(shù)人員的需要也是不斷變化的,只有監(jiān)理部門根據(jù)自身經(jīng)驗(yàn)對(duì)施工工程進(jìn)行預(yù)測(cè),并根據(jù)預(yù)制對(duì)這些資源進(jìn)行提前安排,才能提升工作的效率,加快工程的進(jìn)度。在進(jìn)行資源配置時(shí),依據(jù)的原則是保持施工各個(gè)項(xiàng)目的平衡,并具有可行性,需要依照相關(guān)施工條例進(jìn)行調(diào)整,不能依據(jù)監(jiān)理人員的喜好隨意進(jìn)行分配。公路監(jiān)理工程需要對(duì)施工的材料供應(yīng)情況有所掌握,這樣才能避免工程在施工的過程中,出現(xiàn)因材料供應(yīng)缺失而中途停止施工的現(xiàn)象發(fā)生。監(jiān)理工程還需要對(duì)施工路段的氣候條件有所了解,要掌握施工當(dāng)天的天氣情況,避免在雨天施工。所以,公路的監(jiān)理工程需要對(duì)整個(gè)施工過程進(jìn)行全方位的考慮,對(duì)施工的步驟進(jìn)行統(tǒng)一的協(xié)調(diào)與管理,對(duì)施工的材料與設(shè)備以及施工技術(shù)進(jìn)行檢查與規(guī)范,保證材料的合格性與設(shè)施的正常使用,才能對(duì)施工過程的有效進(jìn)行提高保證。
4.2強(qiáng)化監(jiān)理隊(duì)伍建設(shè)區(qū)
監(jiān)理公司對(duì)監(jiān)理工作人員的加強(qiáng)監(jiān)理培訓(xùn)。在培訓(xùn)的過程中,要根據(jù)崗位職責(zé)不同,對(duì)相關(guān)的人員進(jìn)行分層次的培訓(xùn)。在正式上崗前,要對(duì)職業(yè)技能考核培訓(xùn),要保證上崗后能夠很好的勝任。監(jiān)理主管部門還要定期對(duì)總監(jiān)理師進(jìn)行培訓(xùn),強(qiáng)化他們的職業(yè)素質(zhì)及法律法規(guī)。此外,還要定期的對(duì)監(jiān)理工作者進(jìn)行考核和培訓(xùn),提高監(jiān)理公司的監(jiān)理水平和素質(zhì)。
4.3提高監(jiān)理施工現(xiàn)場(chǎng)的管理意識(shí)
施工現(xiàn)場(chǎng)管理應(yīng)根據(jù)工程施工的具體相關(guān)規(guī)范的現(xiàn)場(chǎng)管理方法來提高施工現(xiàn)場(chǎng)的管理意識(shí),建立一套科學(xué)、標(biāo)準(zhǔn)、規(guī)范的施工現(xiàn)場(chǎng)管理機(jī)構(gòu)和較合理的施工現(xiàn)場(chǎng)管理程序。要確定落實(shí)貫徹施工現(xiàn)場(chǎng)的安全管理和工程質(zhì)量的管理意義,會(huì)使工程降低施工安全、保障施工人員的人身安全和工程項(xiàng)目的質(zhì)量。要切實(shí)做到提高施工人員對(duì)施工現(xiàn)場(chǎng)管理體系的重視程度,提高施工工程現(xiàn)場(chǎng)管理人員的管理意識(shí)和職業(yè)感,保證施工人員充分發(fā)揮施工現(xiàn)場(chǎng)管理方法,控制交通工程施工現(xiàn)場(chǎng)的違規(guī)違章操作,做好工程施工過程中的監(jiān)督者,只有如此,才能徹底避免施工過程中發(fā)生的各類問題,是工程的施工效率得到提高,預(yù)防施工安全事故與工程質(zhì)量發(fā)生的隱患,保證整個(gè)工程的施工進(jìn)度和質(zhì)量。
4.4監(jiān)理人員要加強(qiáng)施工現(xiàn)場(chǎng)的安全管理
在施工現(xiàn)場(chǎng)的安全管理做了充分的準(zhǔn)備,其中包括:施工用電、施工的搭建設(shè)備、現(xiàn)場(chǎng)的防火工作等。一線的施工人員100%佩帶了相應(yīng)的安全設(shè)備,在一些特殊技術(shù)施工環(huán)節(jié),對(duì)于這類工作人員都是100%配備了保護(hù)措施,以及安全防護(hù)設(shè)備。另外,相應(yīng)的施工安全管理人員應(yīng)對(duì)施工中的每個(gè)程序都進(jìn)行安全技術(shù)摸底,在容易出現(xiàn)安全問題的地方設(shè)置安全標(biāo)識(shí)。并建立監(jiān)督小組,實(shí)時(shí)對(duì)施工現(xiàn)場(chǎng)進(jìn)行安全監(jiān)督及檢查,一旦發(fā)現(xiàn)安全隱患,必須及時(shí)進(jìn)行處理和整改,同時(shí),監(jiān)督小組又是保障設(shè)備安全的小組,在博白縣公路局內(nèi),監(jiān)督小組24小時(shí)待崗監(jiān)控施工人員工作的同時(shí)也監(jiān)督設(shè)備的安全性,雙重保險(xiǎn),以保證施工現(xiàn)場(chǎng)的安全施工。
結(jié)束語
綜上所述,我國的經(jīng)濟(jì)在不斷發(fā)展,公路設(shè)施也在逐漸完善,公路施工單位的技術(shù)也需要不斷加強(qiáng),這些都需要公路監(jiān)理工程的有效管理與監(jiān)督,才能保證公路的質(zhì)量。公路監(jiān)理工程是一項(xiàng)長(zhǎng)期系統(tǒng)的工程,加強(qiáng)公路監(jiān)理工程施工現(xiàn)場(chǎng)管理,科學(xué)合理地對(duì)各個(gè)施工要素進(jìn)行安排,實(shí)現(xiàn)低耗能、優(yōu)質(zhì)、快速建設(shè)的目標(biāo)。
參考文獻(xiàn)
[1]羅淺楠,常小會(huì),李俊杰. 淺談公路工程施工現(xiàn)場(chǎng)管理應(yīng)注意的問題[J]. 科技致富向?qū)? 2013(15)
篇10
關(guān)鍵詞:石油化工裝置;工藝管線;試氣試壓;措施
石油化工裝置安裝過程中,管道材料質(zhì)量、管道施工質(zhì)量以及管道試氣試壓質(zhì)量均是影響管道工程質(zhì)量與安全性的重要因素,其中管道試氣試壓質(zhì)量是管道安裝施工中的關(guān)鍵工序,直接關(guān)系著管道的內(nèi)在質(zhì)量以及管道施工總體質(zhì)量,能夠?yàn)橥读仙a(chǎn)提供可靠的支持。因此在石油化工裝置施工中,應(yīng)當(dāng)充分做好管線系統(tǒng)試氣試壓操作,從而保證石油化工裝置得以安全使用。
1 試壓前的準(zhǔn)備工作
為保證石油化工裝置的安全使用,應(yīng)當(dāng)掌握好規(guī)范的試壓程序,如圖1所示,進(jìn)而充分做好試壓前的準(zhǔn)備工作,明確技術(shù)條件,并選取適宜的試壓設(shè)備和材料,從而為石油化工裝置工藝管線系統(tǒng)試氣試壓操作的順利進(jìn)行提供有利條件。
1.1 技術(shù)準(zhǔn)備
由于石油化工裝置中工藝管道系統(tǒng)走向復(fù)雜,為保證試氣試壓工作的順利進(jìn)行,應(yīng)當(dāng)充分做好技術(shù)準(zhǔn)備,規(guī)范試壓流程,并選定試壓介質(zhì)、步驟以及試壓各項(xiàng)安全技術(shù)措施,從而為石油化工裝置提供可靠的技術(shù)支持。
在石油化工裝置試氣試壓之前,應(yīng)當(dāng)結(jié)合裝置生產(chǎn)工藝流程圖、配管施工圖等開展綜合分析,明確石油化工裝置在生產(chǎn)系統(tǒng)應(yīng)用中所需的設(shè)備管件、管道材質(zhì)以及壓力等級(jí)等,從而保證系統(tǒng)試氣試壓方案編制的合理性和有效性。在編制試氣試壓方案后,應(yīng)當(dāng)確定試壓參數(shù)與試驗(yàn)壓力,結(jié)合石油化工裝置工藝管線系統(tǒng)設(shè)計(jì)相關(guān)規(guī)定,依據(jù)生產(chǎn)工藝以及現(xiàn)場(chǎng)實(shí)際情況選定試壓參數(shù),以結(jié)晶水作為氣壓試驗(yàn)的主要液體材料,從而保證試氣試壓操作的順利進(jìn)行。應(yīng)當(dāng)注意的是,在特殊工藝要求下,不銹鋼管道開展用水試驗(yàn)的過程中,相關(guān)技術(shù)人員應(yīng)當(dāng)將水中的氯離子含量控制在25mg/L以內(nèi),從而保證用水試驗(yàn)的規(guī)范性。在試驗(yàn)壓力方面,石油化工裝置工藝管線系統(tǒng)試氣試壓操作中,應(yīng)當(dāng)將氣壓強(qiáng)度試驗(yàn)壓力調(diào)整為設(shè)計(jì)壓力的1.15倍,并確保液壓強(qiáng)度試驗(yàn)眼里為設(shè)計(jì)壓力的1.5倍,從而保證試驗(yàn)操作的有效性。
1.2 檢查管線的完整性
為促進(jìn)石油化工裝置工藝管線系統(tǒng)試氣試壓操作的順利進(jìn)行,應(yīng)當(dāng)在準(zhǔn)備工作中對(duì)管線的完整性進(jìn)行嚴(yán)格檢查,確認(rèn)系統(tǒng)合格后方可開展試壓試驗(yàn),以免發(fā)生安全事故。一般情況下,石油化工裝置工藝管線的完整性檢查包含以下幾種方式,一是施工組依照設(shè)計(jì)圖紙對(duì)管線進(jìn)行自檢,而是施工技術(shù)人員對(duì)試壓系統(tǒng)管線進(jìn)行逐條復(fù)檢。在管線完整性檢查過程中,主要以硬件檢查和軟件檢查作為管線檢查的主要內(nèi)容,就硬件檢查來看,其主要包括管道型號(hào)、規(guī)格、材質(zhì)、標(biāo)高、管道坡度以及水平度等的檢查,通過完整性檢查來確保其滿足石油化工裝置的設(shè)計(jì)要求以及相關(guān)規(guī)范。除此之外,相關(guān)技術(shù)人員應(yīng)當(dāng)對(duì)管道焊接進(jìn)行全面檢查,仔細(xì)檢查管道無損檢測(cè)的規(guī)范行,焊口是否得到妥善的熱處理,并檢查不銹鋼焊口的酸洗鈍化狀態(tài)。就管線完整性檢查中的軟件檢查來看,主要是指對(duì)管道安裝記錄以及焊接記錄的完整性與正確性進(jìn)行檢查,確保各項(xiàng)記錄表簽證確認(rèn)無誤,參與試壓的相關(guān)人員做好明確的技術(shù)交底,并即使做好記錄。通過上述方式對(duì)管線完整性進(jìn)行規(guī)范檢查,能夠?yàn)槭突ぱb置工藝管線系統(tǒng)試氣試壓操作的順利開展奠定可靠的基礎(chǔ)。
1.3 試壓工作是一種比較危險(xiǎn)的工作。
因此,在此項(xiàng)工作開始前應(yīng)進(jìn)行充分的物資準(zhǔn)備工作。主要包括試壓設(shè)備的維護(hù)保養(yǎng)、安全檢查和進(jìn)場(chǎng)布設(shè);各種試壓用儀器、儀表的校驗(yàn)、檢查和安裝;試壓臨時(shí)管線及配件的安裝布置;試壓中各種安全技術(shù)措施所需物資的供應(yīng)及現(xiàn)場(chǎng)的布置等工作。試壓主要設(shè)備、機(jī)具包括壓風(fēng)機(jī)(車)(氣壓用)、水泵(水壓用)、試壓泵(水壓用)、氧氣瓶、乙炔瓶、吊車、移動(dòng)式柴油發(fā)電機(jī)、電焊機(jī)、切割砂輪機(jī)、磨光砂輪機(jī)、倒鏈、水桶等。
2 試壓介質(zhì)
就石油化工裝置工藝管線系統(tǒng)試氣試壓的具體情況來看,其中管線試壓介質(zhì)主要包含兩種類型:一類是氣體,一般以空氣、干燥無油空氣和氮?dú)獾葹橹?;另一類是液體,主要以水、純水和結(jié)晶水為主。在管線試壓操作中,試壓介質(zhì)的選定主要以工藝管線具體要求作為基本選用標(biāo)準(zhǔn)。通過研究可知,以液壓方式開展壓力試驗(yàn)具有一定安全行,在沒有特定管線要求的情況下,一般以水作為試壓介質(zhì)。若管線存在特定要求,應(yīng)當(dāng)以結(jié)晶水在充水管道中設(shè)置過濾器,在管道內(nèi)部安裝噴砂處理的管子,在將試驗(yàn)用水中氯離子含量控制在25ppm后,以含有防銹劑的水溶液開展試驗(yàn),應(yīng)當(dāng)注意的是,水溶液中所含防銹劑的量應(yīng)當(dāng)適宜,以免影響后續(xù)工藝介質(zhì)的有效應(yīng)用,為石油化工裝置工藝管線系統(tǒng)試氣試壓操作的順利進(jìn)行打下良好的基礎(chǔ)。
3 壓力試驗(yàn)
液壓試驗(yàn)前,試壓系統(tǒng)首先注水,在管道最高點(diǎn)設(shè)排氣閥,將空氣排盡,將壓力表安裝在最高位置及地面易觀測(cè)的位置,測(cè)定壓力以最高位置的壓力表讀數(shù)為準(zhǔn),然后緩慢升壓,達(dá)到試驗(yàn)壓力時(shí),穩(wěn)壓10分鐘,經(jīng)全面檢查,以無泄漏、目測(cè)無變形為合格。管線強(qiáng)度試驗(yàn)合格后,應(yīng)進(jìn)行管線的氣密性試驗(yàn)。用液體作介質(zhì)的氣密性試驗(yàn),將管道系統(tǒng)壓力降至設(shè)計(jì)文件規(guī)定的壓力后,采用直接觀測(cè)法進(jìn)行全面檢查,以無泄露為合格。
對(duì)于液壓作強(qiáng)度試驗(yàn)、氣壓作氣密性試驗(yàn)的管線,應(yīng)在管線吹掃合格后進(jìn)行,試驗(yàn)時(shí)升壓應(yīng)緩慢,確認(rèn)無泄露和異?,F(xiàn)象后,方可繼續(xù)升壓,此后每升試驗(yàn)壓力的10%就檢查一次,直至試驗(yàn)壓力,然后進(jìn)行全面檢查,穩(wěn)壓30分鐘,以無泄漏、無壓降為合格。對(duì)于氣壓作強(qiáng)度試驗(yàn)的管線,當(dāng)強(qiáng)度試驗(yàn)合格后,直接將試驗(yàn)壓力降至氣密性試驗(yàn)的壓力,穩(wěn)壓30分鐘,以無泄漏、無壓降為合格。檢驗(yàn)采用在焊口、發(fā)蘭、密封處刷檢漏液的方法。
4 試壓安全技術(shù)規(guī)定
管線試壓是非常危險(xiǎn)的,應(yīng)做好各項(xiàng)安全技術(shù)措施。液壓試驗(yàn)管段長(zhǎng)度一般不應(yīng)超過1000米,試驗(yàn)用的臨時(shí)加固措施應(yīng)經(jīng)檢查確認(rèn)安全可靠,并做好標(biāo)識(shí)。液壓試驗(yàn)系統(tǒng)注水時(shí),應(yīng)將空氣排盡,宜在環(huán)境溫度5℃以上進(jìn)行,否則須有防凍措施。試驗(yàn)過程中,如遇泄漏,不得帶壓修理,缺陷消除后,應(yīng)重新試壓。試壓合格后應(yīng)及時(shí)卸壓,液體試壓時(shí)應(yīng)及時(shí)將管內(nèi)液體排盡。系統(tǒng)試驗(yàn)完畢后,應(yīng)及時(shí)拆除所有臨時(shí)盲板,填寫試壓記錄。試壓過程中,無關(guān)人員不得入內(nèi),操作人員必須聽從指揮,不得隨意開關(guān)閥門。
結(jié)束語
總而言之,石油化工裝置工藝管線系統(tǒng)試氣試壓操作具有一定特殊性,為保證各項(xiàng)操作的安全順利進(jìn)行,確保石油化工裝置的實(shí)際使用價(jià)值得到最大程度的發(fā)揮,應(yīng)當(dāng)充分做好試壓前的準(zhǔn)備工作,選定試壓介質(zhì),并嚴(yán)格依照相關(guān)安全技術(shù)規(guī)定開展壓力試驗(yàn),即使做好記錄,從而為石油化工裝置的安全使用提供可靠的數(shù)據(jù)支持。
參考文獻(xiàn)